compatible land use in the
vicinity. (FAA Order 1050.1E, Appendix A, section 14)
2.13. Air Quality
The CONSULTANT shall assess proposed action’s impact on air quality by evaluating
the impact of the action on the National Ambient Air Quality Standards (NAAQS) in
accordance with the Clean Air Act and the National Environmental Policy Act. An
evaluation and discussion of all required permits (i.e., for any emissions from the
construction and operation of the facility) should also be included. (FAA Order 1050.1E,
CHG 1, Appendix A, section 2)
2.14. Construction Impacts
The CONSULTANT shall describe the type and nature of the construction activities
associated with the proposed action and measures to be taken to minimize potential
adverse effects. (FAA Order 1050.1E, CHG 1, Appendix A, section 5)
2.15. Hazardous Materials and Solid Waste
The CONSULTANT shall evaluate the potential impact the proposed action would have
on hazardous materials and solid waste generation, disturbance, etc., in accordance
with CERCLA, the Pollution Prevention Act of 1990, TSCA, and RCRA. (FAA Order
1050.1E, CHG 1, Appendix A, section 10)
Prepare Draft EA for Agency Review
Objective: Prepare a Draft EA for review by the regulatory agencies and the public. Submit the
Draft EA to the public and agencies for review in accordance with CEQ regulations.
Product: Draft EA document and CD copies or hard copies for Agency and Public Review,
when requested. Responses and agency comment letters will be produced and collected by the
CONSULTANT for inclusion into the final document.
2.16. Prepare Draft EA
The CONSULTANT shall prepare a Draft EA for review by the stakeholder applicable
agencies as determined by the FAA and the CONSULTANT. The Draft EA shall be
prepared in general accordance with the following outline as specified in FAA Order
1050.1E, paragraph 405:
Cover Sheet
Executive Summary
Section 1: Proposed Action
Section 2: Purpose and Need for the Project
Section 3: Alternatives (including Proposed Action)
Section 4: Affected Environment
Section 5: Environmental Consequences, including Direct, Indirect, and
Cumulative Effects
Section 6: Mitigation (if any)
Section 7: List of Preparers and Qualifications
Section 8: List of Agencies and Persons Consulted
Appendices
2.17. Agency Coordination and Public Review of Draft EA
The CONSULTANT, under direction of the FAA, will distribute the Draft EA to the public
and the agencies with a request to respond within 30 days. Review copies will be made
available by the CONSULTANT to Okaloosa County and the local public libraries at a
minimum. In addition, a Public Notice will be posted by the CONSULTANT in local
newspapers requesting public input and informing the public of copy availability.
Prepare Final Draft EA and Finding of No Significant Impact (if appropriate)
Objective: Preparation of Final Draft EA including compiling of agency comments and
addressing any issues raised as a result of agency reviews or public input. The EA will be
submitted to the FAA for review and issuance of a FONSI (if appropriate).
Product: The Final EA/FONSI (if appropriate) will be prepared by the Consultant for FAA
review. Once the Final EA/FONSI is approved by the FAA, up to 10 hard copies and 2 disk
copies of the EA and FONSI shall be produced for distribution to the FAA and key interested
parties.
2.18. Prepare Final EA and FONSI
Additional information may be added as a result of agency reviews and/or public input.
The CONSULTANT will provide documentation in the Appendix that such reviews have
occurred and include the appropriate documentation in the Final Draft EA and FONSI (if
appropriate).
2.19. Submit EA to FAA for Final Review
The FAA will receive a complete copy of the Final EA and will review the document for
completeness and content.
2.20. Publish Final EA/FONSI
The CONSULTANT will publish the Final EA/FONSI (if appropriate) in local newspapers
for final public informational review period (10 days).
Task 3: Engineering Analysis and Reports
The CONSULTANT shall coordinate and perform the appropriate level of engineering analysis
required to meet the project’s purpose and need, address agency concerns and the project’s
impacts.
Data Collection for the Engineering Analysis and Reports
Objective: This activity consists of collecting various information and materials relative to the
performance of engineering analyzes within the study area. The information will include all data
necessary to perform adequate evaluation of the location and design of the transportation
facility.
Product: Data and analysis for engineering analysis. Each of the following items will be
collected and their significance will be addressed as part of the documentation.
3.1 Traffic Data
The CONSULTANT shall coordinate with the COUNTY and FDOT to obtain the following
initial traffic data:
• 20 year Design Corridor System Traffic with K & D Factors.
• Volume of trucks (medium and heavy), motorcycles and buses for existing,
opening, interim years and design year.
• LOS "C" traffic volumes at anticipated posted speed if Level of Service D, E or F
is anticipated during the life of the project (for noise study)
After consultation with COUNTY and FDOT, the CONSULTANT is to obtain current
corridor traffic counts.
The CONSULTANT will analyze the traffic projections provided initially by the FDOT,
and report to the Project Manager concerning apparent inconsistencies. The
CONSULTANT will provide the Project Manager with support and advice in procuring
acceptable revised Traffic Projections.
The CONSULTANT will furnish 24-hour traffic machine counts (approach volumes at 15-
minute increments) where required.
Based on an analysis of the 24-hour traffic machine counts and evaluation of current and
future development trends (traffic generators), the CONSULTANT will then perform 8-
hour manual vehicle turning movement counts (during the AM and PM peaks based on
24-hour counts) at those intersections where required.
3.2 Survey Data (As Required)
The CONSULTANT will utilize existing survey information (LiDAR, aerials, etc.), but if
additional information is required the CONSULTANT will locate above ground features
and improvements for the limits of the project by collecting the required data for the
purpose of creating a DTM with sufficient density. Shoot break lines, high and low points.
Effort includes field edits, analysis and processing of field collected data, existing maps,
and/or reports.
3.3 Utility Data
The CONSULTANT shall identify utility facilities found within a proposed project corridor
(all viable alternates under consideration). The CONSULTANT shall evaluate and
consider potential utility conflicts and recommended mitigations in addressing roadway
impacts on utilities.
Design Analysis
Utilizing the data collected as part of this Scope of Services, the CONSULTANT shall perform
the engineering analysis necessary to complete the project development process. The task of
engineering analysis will be ongoing throughout the duration of the project and will be performed
with consideration to the results of the environmental impacts analysis. The following items will
be analyzed and will be addressed as part of the documentation.
3.4 Corridor Analysis
The CONSULTANT shall document that the proposed corridor is the only feasible
corridor for the project, and that other corridors were not considered.
3.5 Traffic Analysis
The CONSULTANT will prepare a Design Traffic Technical Memorandum. This
memorandum will document the methodology used in developing the traffic demand and
multi-modal splits, if applicable. The memorandum shall also identify the design traffic
volumes for each alternative, which may include combinations with other modes of
transportation.
After COUNTY approval of the Design Traffic Technical Memorandum, those traffic
projections will be used during the study of conceptual design alternatives and for the
analysis of any impacts which depend on traffic inputs (i.e. noise impacts and air quality
assessments).
3.6 Alternative Analysis
The CONSULTANT will identify up to three alternatives for evaluation. For each Design
Alternative, the CONSULTANT shall determine:
Horizontal and vertical alignment
Typical section
Preliminary right-of-way costs
Preliminary drainage to the extent of identifying required outfalls
Traffic data
Geometric concepts of intersections, access to recreational areas, and adjacent
property
Existing and proposed utility location to the extent they affect the decision
process
Soils data
Extent of improvement to all connecting and/or intersecting roads
Acreage involved
Preliminary structure concepts and locations
Location of detention/retention basins as may be required
Locations of noise barriers
Affect on established neighborhoods
Environmental Impacts
Other such design features as may be pertinent
Affect on protected species
3.7 Drainage and Floodplain Analysis
The CONSULTANT shall perform preliminary drainage design in order to determine
potential outfall locations and preliminary sizes (volume and area) of required detention
and/or retention facilities for storm water treatment or attenuation. The location and size
of potential detention/retention areas will be determined for all viable alternate
alignments.
The CONSULTANT shall prepare a “Pond Sitting Report” for the project in accordance
to the FDOT’s Stormwater Facilities Handbook.
The CONSULTANT shall prepare a Location Hydraulics Report (LHR) for the project in
accordance with Part 2, Chapter 24 of the FDOT PD&E Manual.
3.8 Structures Analysis
The CONSULTANT will evaluate conceptual structures vertical and horizontal
alignments. This task will be further defined in coordination with the COUNTY.
3.9 Utilities Analysis
Based on the coordination with the utility companies along the project the
CONSULTANT shall prepare a Utility Assessment Package. The Utility Assessment
Package will contain the following information:
The names of major utility companies within the project corridor,
A set of aerials denoting the location of major existing and proposed utilities
along the project corridor,
A description of all utilities located along the corridor (as set out above),
A cost estimate furnished by the utility agencies for each alternative being
considered,
A discussion of joint right-of-way acquisition, if appropriate, and
A discussion of any mitigative recommendations which could be taken by the
COUNTY and utility companies to minimize community disruption.
3.10 Construction Cost Estimates
The CONSULTANT shall develop construction cost estimates for each design