READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — January 19, 2016 — Bluewater Bay MSBU Agreement — reading text
Part 5 of 10. These parts divide the reading text for browsing; they are not the source document's page numbers.
Bluewater Bay MSBU Agreement — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
local and federal laws and regulations are followed and documented, as appropriate.
Phase I consists of fees; for conducting survey, drainage study, engineering, design, public
notices, and/or permitting associated with the modification(s) needed to upgrade the drainage.
Verification of upstream and downstream impacts shall be necessary for determining project
eligibility.
All Phase I work shall be completed in accordance with all applicable state, local and federal laws
and regulations and documented, as appropriate.
Notify the public of the intent to locate the proposed action in the floodplain or/and wetland. The
notice shall be published at least once in a local newspaper of general circulation. The public
shall be given at least fifteen (15) days to comment. The Recipient shall meet federal
requirements of notification. Compliance shall be submitted with deliverables.
Upon completion of Task 2, the Recipient shall submit a final copy of the below documents and
any necessary supporting documentation, and provide a summary of all contract Scope of Work
changes, if any.
a) Two sets of engineering Signed/Sealed final design and analysis, surveying, and
Hydrologic and Hydraulic (H&H) Studies;
b) Construction Plans and bid documents;
c) Revised cost estimate for Phase II – construction (include Phase I costs), to
implement the design project;
d) Design documents shall provide a detailed description which includes specifics on
project Scope of Work, depth and extent of ground disturbance at all construction
locations of the project.
e) An H&H study shall be completed. If impacts to waters of the United States (US) or
wetlands are identified in the study, coordination with U.S Army Corps of Engineers
(USACE) shall be required. Any conditions imposed by the USACE shall be included
in the final design plans, narrative and project implementation actions.
17
f) Color areal map shall be provided with the project location and staging areas clearly
marked on map. The full extent of the project footprint and depth of ground
disturbance shall be clearly indicated, including area in square feet and depth in feet.
g) Information regarding past, present and future land use, and a detailed narrative on
all proposed actions is required.
h) Copy of all environmental permits obtained from the Florida Department of
Environmental Protection (FDEP), Northwest Florida Water Management District
(NWFWMD), USACE, and any conditions for compliance shall be included in the final
design plans, narrative and project implementation actions.
i) Any other documentation requested by the Division, not limited to Project conditions
and requirements herein.
If any work is proposed to be conducted around/in the water, due to the proximity to the water
and potential for listed species and protected areas/sanctuaries in the project area, the Recipient
shall contact the USACE, for scoping assistance. Any conditions imposed by the USACE shall be
included in the final design plans, narrative and project implementation actions.
3) During the course of this Agreement the Recipient shall submit requests for reimbursement.
Adequate and complete source documentation shall be submitted to support all costs (federal
share and local share) related to the project. In some cases, all project activities may not be fully
complete prior to requesting reimbursement of costs incurred in completion of this Scope of Work;
however, a partial reimbursement may be requested.
The Recipient shall submit an Affidavit signed by the Recipient’s project personnel with each
reimbursement request attesting to the completion of the work, disbursements or payments were
made in accordance with all Agreement and regulatory conditions, and that reimbursement is due
and has not been previously requested.
The Recipient shall maintain accurate time records. The Recipient shall ensure invoices are
accurate and any contracted services were rendered within the terms and timelines of this
Agreement. All supporting documentation shall agree with the requested billing period. All costs
submitted for reimbursement shall contain adequate source documentation which may include
but not be limited to: cancelled checks, bank statements, Electronic Funds Transfer, paid bills and
invoices, payrolls, time and attendance records, contract and subcontract award documents.
Direct Expenses: The Recipient shall pre-audit bills, invoices, and/or charges submitted by the
contractors and subcontractors and pay the contractors and subcontractors for approved bills,
invoices, and/or charges. Recipient shall ensure that all contractor/subcontractor bills, invoices,
and/or charges are legitimate and clearly identify the activities being performed and associated
costs.
Project Management Expenses: The Recipient shall pre-audit source documentation such as
payroll records, project time sheets, attendance logs, etc. Documentation shall be detailed
information describing tasks performed, hours devoted to each task, and the hourly rate charged
for each hour including enough information to calculate the hourly rates based on payroll records.
Employee benefits shall be clearly shown.
The Division shall review all submitted requests for reimbursement for basic accuracy of
information. Further, the Division shall ensure that no unauthorized work was completed prior to
the approved project start date by verifying vendor and contractor invoices. The Division shall
verify that reported costs were incurred in the performance of eligible work, that the approved
work was completed, and that the mitigation measures are in compliance with the approved
Scope of Work prior to processing any requests for reimbursement.
Review and approval of any third party in-kind services, if applicable, shall be conducted by the
18
Division in coordination with the Recipient.
Quarterly reports shall be submitted by the Recipient and received by the Division at the times
provided in this Agreement prior to the processing of any reimbursement.
The Recipient shall submit to the Division requests for reimbursement of actual Phase I costs
related to the project as identified in the project application and this Scope of Work. The
Requests for Reimbursement (RFR) shall include:
a) Contractor, subcontractor, and/or vendor invoices which clearly display dates of
services performed, description of services performed, location of services
performed, cost of services performed, name of service provider and any other
pertinent information;
b) Proof of payment from the Recipient to the contractor, subcontractor, and/or vendor
for invoiced services;
c) Clear identification of amount of costs being requested for reimbursement as well as
costs being applied against the local match amount;
The Recipient’s RFR shall include the final Phase I project cost. Supporting documentation shall
show that all contractors and subcontractors have been paid.
B) Deliverables:
Mitigation activities consist of:
• Project designs that shall implement measures to upgrade drainage system.
• A hydraulic study and recommended improvements to the drainage system to mitigate future
flooding in the area bound by Southwind Drive, Dominica Way, Aruba Way and Curacao Way.
• The completed improvements for the project shall be designed to provide a 25-year protection.
• The Recipient shall provide designs and calculations for Phase II review, including verification that
there shall not be any upstream or downstream impact, and obtain required permits.
Provided the Recipient performs in accordance with the Scope of Work outlined in this Agreement, the
Division shall reimburse the Recipient based on the percentage of overall project completion.
PROJECT CONDITIONS AND REQUIREMENTS:
C) Engineering:
1) The Recipient shall submit Engineering plans that clearly shows the engineer’s estimate of the
pre and post-mitigation effects of the proposed project and the relationship of the damages to be
mitigated (commensurate with the level of funding requested). This includes, but is not limited to,
the existing and proposed Hydrologic and Hydraulic (H&H) for the level of event being mitigated.
2) Design documents shall provide a detailed description which includes specifics on project Scope
of Work, depth and extent of ground disturbance at all construction locations of the project.
3) An H&H study shall be completed; if impacts to waters of the United States or wetlands are
identified in the study, coordination with USACE shall be required. Any conditions imposed by
the USACE shall be included in the final design plans, narrative and project implementation
actions.
19
4) Provide a set of Community Approved, State reviewed construction plans (sealed) for review and
comment including milestones and timelines for completion of the final phase of the project and
bid documents/awards.
5) Demonstrate mitigation effectiveness, in part, by showing the physical location(s) and elevation(s)
of the infrastructure/structures that is being damaged and FEMA Special Flood Hazard Areas on
the same plan.
6) Submit a refined cost estimate, to include Phase I Fees and Phase II Construction materials and
Labor. A new Benefit Cost Analysis shall be performed using the revised information.
D) Environmental:
1) The Recipient shall follow all applicable State, Local and Federal Laws Regulations and
requirements, and obtain (before starting project work) and comply with all required permits and
approvals. Failure to obtain all appropriate Federal, State, and Local environmental permits and
clearances may jeopardize federal funding. If project work is delayed for a year or more after the
date of the categorical exclusion (CATEX), then coordination with and project review by
regulatory agencies shall be redone.
2) Any change, addition or supplement to the approved Scope of Work that alters the project
(including other work not funded by FEMA, but done substantially at the same time), regardless of
the budget implications, will require re-submission of the application to FEMA through the Division
for National Environmental Policy Act (NEPA) re-evaluation before starting project work.
3) If any ground disturbance activities occur during construction, the Recipient will monitor those
activities, and if any potential archeological resources are discovered, shall immediately cease
construction in that area and notify the Division and FEMA.
4) Color map shall be provided with the project location and staging areas clearly marked on the
map. Color project maps that show the full extent of the project footprint and depth of ground
disturbance shall be provided.
5) Copy of all environmental permits including an Environmental Resource Permit (ERP) from the
NWFWMD and USACE permit shall be submitted. Any conditions for compliance shall be