READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 6, 2014 — Eglin Main Wastewater Easement — reading text
Part 1 of 5. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 125-Eglin Main Wastewater Easement.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 96TH AIR BASE WING (AFMG)
EGLIN AIR FORCE BASE FLORIDA
5 Dec 13
Barbara J. Brandt
96 Civil Engineer Group
Real Estate Management Office
501 DeLeon Street, Suite 100
Eglin AFB FL 32542-5133
Jeremy Williams
Okaloosa County Water and Sewer
1804 Lewis Turner Boulevard, Suite 300
Fort Walton Beach, FL. 32547
Dear Mr. Williams,
Enclosed please find Easement #USAF-AFMC-FTFA-13-2-0290 for your review and
signature. Have your authorized representative sign this agreement at Page 10 on all three
copies.
Please return the entire package to the address above. Once signed by the commander, a final
copy will be mailed to you.
If you have any questions, contact Ms. Melinda Hazzard at (850) 882-1348 or via email at
Melinda.hazzard@us.af.mil.
Sincerely,
Yeh a and
BARBARA J.B ', GSA2, USAF
roperty Offic
Attachment:
Easement #USAF-AFMC-FTFA-13-2-0290
Document Number: USAF-AFMC-FTFA-13-2-0290
DEPARTMENT OF THE AIR FORCE
GRANT OF EASEMENT
FOR
EGLIN AIR FORCE BASE, FLORIDA
Standard Outgrant Easement
SAF/GCN-RPO
March 2010
Document Number: USAF-AFMC-FTFA-13-2-0290
DEPARTMENT OF THE AIR FORCE
GRANT OF EASEMENT
FOR
EGLIN AIR FORCE BASE, FLORIDA
TABLE OF CONTENTS
T. PARTIES AND PURPOSE......ccssssssssssssesscssessnsonssssnsesaesnsssnesnsanensstansaneseennecsesucsnsnansauenessassneansanequenuenssnananeasenneqneqanasvensqostaneaneneces 1
IE. CONSIDERATION.
IX. OTHER GRANTS OF ACCESS ....
X. GRANTEE’S IMPROVEMENTS ..
XI. NO OBSTRUCTIONS
XIT. GENERAL INDEMNITY.....cssccssssessesscnesvenesseneenssnenceneareneeserseacauescevesssnnevesecveseenecucnuensevenseseasunensavensenensenenseneaseneusensarenserentarsnes 3
XII. LIMITATION OF GRANTEE RIGHTS.....cssssccscssecsssesessnenssecsessnesasnenees cassusneenssnecsenecanecnensenenecronsenensesennesssnesseseasnecesnenson 4
KTV. INSURANCE. .....csssessssssssnessrsnessoneeneotsscsatsenconnessnnenesasansnsacensaransacsssneraconecnsnecsesneneetsseansnenonasansseaneatansnsanenvanensassaneauaseneesevensesee 4
XV. AIRFIELD CONSTRUCTION Q...sccccssssssssseessscssnessssssssssnressnesesnessnnesesnensanesrensnecuanseaesusausensunsusenseaenssaenssaesaeaenaransanannananenases 4
XVI. PRESERVATION OF CULTURAL AND NATURAL RESOURCES ..
XVI. GRANTEE PERMITS.
XVHUI. ENVIRONMENTAL CONDITIONS.
XIV. ENVIRONMENTAL COMPLIANCE.....cccccssssssscssssnssssssssssessssesacssesesneenenesavecenasscsueaenueasnaracnaaenaeasanrarsasassacansasnenaeannasaneaaane 5
XX. ENVIRONMENTAL USE RESTRICTIONS ....cssscssssessssessssssssssacssnseesseensnsersssnevennssnsneaesnsacssaenneneansacaneneauenennesenneaenneassseas 5
XXI. HAZARDOUS MATERIALS AND HAZARDOUS WASTE .....c.scscssscssssrsesressernesnsneatenssesnsasnnesesnesersesesneonanesereaennensseenes 6
XXTL. GRANTOR ENVIRONMENTAL REMEDIATION ....csssessssessessecsertencssearsosnessesecraseearsosaesesarseenesneacsaeseseeseseesanetarnasoraneane 6
XXII. ENVIRONMENTAL INDEMNIFICATION
XXIX. ENVIRONMENTAL LIABILITY OF THE GRANTOR...
XXV. ABANDONMENT OR TERMINATION OF EASEMENT
XXVI. DAMAGE TO OR REMOVAL OF GOVERNMENT PROPERTY ..
XXVIL REMOVAL OF GRANTEE IMPROVEMENTS ......ssessesessessesssesasserssssesessearssseaesnecesueneseansonesesueceseenesneeonnssseenioesneaeane 7
XXVIIE REMEDIES FOR NON-COMPLIANCE ....ssssssssosscseetersvacsnsassssseensonensensscenseacarssecnencaneeceneacenencaseosenseseneeevsnseneasenearentare 8
XXIX. ASSIGNMENT. ...ccsscscsssssrsescccsncosnrsonsnsencesencansecenssssesnenasnensenecserscscenenetanencnenaesasneccesnencanenenecacanesesnenenecsnanenesnencnnenenacseneeoenegee 8
XXX. AUTHORIZED REPRESENTATIVES AND NOTICES .......secsossssssneocssesessseseesnseentstatanenearoneesneresnnestenersenenenneananeeneana 8
XXXL, EXHIBITS ......ccscscsssssssscsssssssssncsssansossssssecrsnesssneeseonescsvessenesrsessocarsusserasoeonesuoereseoreusaerasarsssaenusareacarsssaesassenssarenssercarereaneesees li
Standard Outgrant Easement i
SAF/GCN-RPO
March 2010
Document Number: USAF-AFMC-FTFA-13-2-0290
DEPARTMENT OF THE AIR FORCE
GRANT OF EASEMENT
I. PARTIES AND PURPOSE
THE UNITED STATES OF AMERICA, acting by and through the Secretary of the Air
Force (the "Grantor"), under and pursuant to the authority granted in 10 U.S.C. § 2668, the
Secretary of the Air Force having determined that no more land than needed for the easement is
included herein, and the granting of this easement is not against the public interest, does hereby
GRANT and CONVEY to Okaloosa County Board of County Commissioners, Okaloosa County,
Florida (Grantee), a nonexclusive easement to install, operate and maintain an underground
forcemain, lift stations, and fiber infrastructure to support the lift stations on, over, under, and
across the property on Eglin Air Force Base (AFB), Florida, as described in Exhibit A and
depicted on Exhibit B (the “Easement Area”). The Grantor and Grantee may be referred to as
Parties or separately as a Party.
Il. CONSIDERATION
A. The sum of $1.00 and the provision of maintenance, repair, and security of the
Easement Area, and other good and valuable consideration, the receipt and sufficiency of which
is hereby acknowledged.
B. The Grantee, at its own expense, shall record this executed easement (including
Exhibits A and B) in the public records of the county within which the easement site is located
within fourteen (14) days after receipt, and shall provide to the Grantor within ten (10) days
following the recordation a copy of the recorded easement (including Exhibits A and B) which
contains the O. R. Book and pages at which the easement is recorded.
I. TERM
This Grant shall be for a term of 25 years beginning 2013 through
2038.
IV. GRANTEE ACCESS
Grantee is granted the nonexclusive right to use the walkways, streets, and roads on Eglin
AEB, Florida in common with the Grantor and its lessees and licensees for access to and from
the Easement Area and the nearest public street or highway.
V. GRANTOR’S RIGHT OF ACCESS AND INSPECTION
Grantor shall have the right to enter the Easement Area at any time and shall have the
tight to reasonably inspect Grantee’s use of it and any of Grantee’s improvements or property
placed thereon, without notice.
Standard Outgrant Easement Page 1 of 10
SAF/GCN-RPO
March 2010
Document Number: USAF-AFMC-FTFA-13-2-0290
VI. GRANTOR’S RIGHT OF ACCESS FOR ENVIRONMENTAL PURPOSES
Grantor reserves for itself and for the benefit of those local, state and federal
governmental agencies that have responsibility for environmental regulatory compliance (the
"Environmental Agencies") and their respective officials, agents, employees, and contractors,
and subcontractors, the right of access to the Easement Area for the following purposes, either on
the Easement Area or on other lands, and for such other purposes,
A. to conduct site investigations and surveys, including, where necessary, drilling, soil
and water sampling, test-pitting, testing soil borings, and other activities related to the base
Environmental Restoration Program (ERP);
B. to inspect field activities of the Grantor and its contractors and subcontractors in
implementing the ERP;
C. to conduct any test or survey required by the Environmental Agencies relating to the
implementation of the ERP, or environmental conditions on the Easement Area, or to verify any
data submitted to the Environmental Agencies by the Grantor relating to such conditions;
D. to conduct, operate, maintain, or undertake any other response, corrective, or remedial
action as required or necessary under the ERP, including, but not limited to, the installation of
monitoring wells, pumping wells, and treatment facilities; and
E. to monitor any environmental restrictive use covenants and the effectiveness of any
other land use or institutional control established by the Grantor on the Easement Area, either by
itself, by its contractor, by any public entity, including the state, or by a private entity registered
in the state to monitor environmental covenants.
VII. GRANTOR’S REASONABLE REGULATION
The use and occupation of the Easement Area and the exercise of the rights herein
granted shall be subject to Grantor’s reasonable restrictions and regulations regarding ingress,
egress, safety, sanitation, and security, as Grantor, or its duly authorized representatives, may
from time to time impose.
VUI. CONDITION OF EASEMENT AREA
The Grantee has inspected and knows the condition of the Easement Area. It is
understood that the Easement is granted “as is, where is” without any warranty, representation,
or obligation on the part of the Grantor to make any alterations, repairs, improvements, or
corrections to conditions or to defects whether patent or latent. The Parties shall jointly perform
and sign or otherwise authenticate a Physical Condition Report at the beginning of the Easement
term to document the condition of the Easement Area. This report will be made a part of this
Grant as EXHIBIT C.
Standard Outgrant Easement Page 2 of 10
SAF/GCN-RPO
March 2010
Document Number: USAF-AFMC-FTFA-13-2-0290
IX. OTHER GRANTS OF ACCESS
This Grant is subject to all outstanding easements, rights-of-way, rights in the nature of
an easement, leases, permits, licenses, and uses (collectively, “Outgrants”) for any purpose
affecting the Easement Area. The Air Force may make additional Outgrants and make additional
uses that may affect the Easement Area. However, any such additional Outgrants shall not be
inconsistent with the use of the Easement Area by the Grantee under this Easement.
X. GRANTEE’S IMPROVEMENTS
A. At least 30 days before doing any work to repair, build, alter, modify, or
demolish any improvements in the Easement Area, Grantee shall give written notice of its
plans to the Base Commander through the Base Civil Engineer, who shall have the right to
review and approve or reasonably modify the plans and to place reasonable restrictions on
Grantee’s access, equipment, methods, materials, and manpower related to accomplishing
the work, in order to ensure it is done consistent with Grantor’s use of the Easement Area
and the operation of the base.
B. In the event all or any portion of the Premises shall be needed by the United States or
in the event the presence of Grantee’s property shall be considered detrimental to governmental
activities, Grantee shall, from time-to-time and at Grantee’s expense, upon notice to do so, and
as often as so notified, remove or relocate its property to such other location or locations on the
Premises (or substitute land of Grantor which shall then become part of the Premises) as may be
designated by said officer, and in the event Grantee’s property shall not be removed or relocated
within thirty (30) days after any aforesaid notice, the United States may cause the same to be
done at the expense of the Grantee.
XI. NO OBSTRUCTIONS
Neither party shall use the property nor construct, erect, or place any objects, buildings,
structures, signs, or wells of a permanent nature on, under or over the Easement Area that will
unreasonably interfere with the other Party’s use of the premises, as set out in this Grant or its
reservations.
XII. GENERAL INDEMNITY
The Grantee shall, to the extent permitted by law, indemnify the Grantor, its agents and
employees, from and against any loss, damage, claim, or liability whatsoever resulting in
personal injury or death, or damage of property of the Grantor and others, directly or indirectly
due to the negligent exercise by the Grantee of any of the rights granted by the Grant, or any
other negligent act or omission of the Grantee, including failure to comply with the obligations
of this Grant or of any applicable laws that may be in effect from time to time.
Standard Outgrant Easement Page 3 of 10
SAF/GCN-RPO
March 2010
Document Number: USAF-AFMC-FTFA-13-2-0290
XI. LIMITATION OF GRANTEE RIGHTS
Except as is reasonably required to effect the purpose of this Grant, the Grantee has no
right of use, license, easement, servitude, or usufruct, for any purpose, by
