READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 03-14-06 (regular) — reading text
Part 33 of 40. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-10149-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
be sent to these organizations. And that' s my motion.
Mayor: OK, is there a second on Mr. Minich' s motion?
JT: I'll make the second.
Mayor: Mr. Tucker seconded Mr. Minich' s motion.
JT: The reason I find this very palatable is because it does basically what I've asked for at one of
our Council workshops. At that time I said no bridges east of Brooks Bridge, which would
eliminate the Hollywood Bridge Corridor, would eliminate
actually anything east of Brooks
Bridge. Now I know young Mr. Smith has come forward with an idea where we can run one a
tad bit to the west and I have no problem with that, that' s the traffic
engineers, and find out
where the footprint is. So I don' t find
anything objectionable to this. If my colleagues do then
please tell me because I have the tendency to support this because it protects your area east of
Brooks Bridge, it protects the Hollywood corridor, and it still,
any of Brooks Bridge corridor
locations suggested by Figg. Well they' ve, the Bridge
Authority has already removed the Wright
Parkway, so I'm going to vote for it because it certainly might give some of the people a chance
to sleep better who live east ofBB to know we are
thinking ofthem but we really can' t keep it
from happening.
Mayor: Let Mr. Minich speak since he made the motion.
MM: And you know part of it is, I call it traffic solution,
you don' t have to use the word bridge
all the time. There' s other things we can look at that will our
maybe in the short term.
problem
You' re right, everybody has talked about the
replacement ofBB and that will have to happen at
some point in time. When I said a toll
bridge in the BB corridor I didn' t say a bridge, it could be
another bridge. But it also has to suit our needs in downtown Fort Walton Beach, and not let
them tear up downtown Fort Walton Beach for a
bridge. So I think we need to let them know as
part of the public input now that these are the things they should start looking at, these are the
parameters they should start working toward. And I think by us sending it to them it speaks what
we want for the
city. I think the Hollywood corridor needs to go away. I think if it goes away
you can' t put a toll bridge at BB because you' ve got to pay one way or another. And the rest of
it, they' re just non- starters, and I think that we should minimize our
impact on downtown Fort
Walton. And I think that as a city we should speak with that voice.
Mayor: Dr. Pullen, did you have something?
WP: Ijust have a question, we' re making this motion to send a letter or a resolution, and send it
to whoever. . .
MM: Either one of the two, I think we should send it to the ECBA, the TPO before their next
meeting, the day after tomorrow, and then to whoever, send it to the governor, all of our elected
officials above us, that this is what we accept. And it may not be the absolute best traffic
solution there is, but it will be one acceptable to us, it will be a little give and take.
Mayor: Would you include the Transportation Corridor authority also as an addressee?
MM: Yeah, sure...
WP: Then my question was, we should do this as a letter because it
goes faster. . .
JH: The idea of a letter, resolution is fine, but it is the voice of 8
people. . .
MM: No..
JH: Yes it is, and I'm not disagreeing with you. But we should not lose
sight of what the greater
step is, and this is to get this in a resolution in March of 07 so we can send more than just the
vote or the voice of 8 people. . .
Mayor: You mean a referendum?
JH: A referendum, sorry. . .this is a step and its fine and I don' t disagree. But we' ve got to get
that referendum imposed for Fort Walton Beach.
Mayor: Anyone over here? Just as an aside, I thought that was one of the flaws ofthe Figg
Engineering analysis, is that they did discuss a replacement bridge for BB. They included BB as
it was throughout the whole process, and then these other bridges would be built in 15 years or
so, and then oops, OK, now we have to go in and replace BB. So I think the idea of replacing BB
is in there someplace and that' s where we don' t have to use a toll bridge because the bridge
replacement funds are different than highway funds t replace the bridge. . . and maybe later on
when you' re talking about alternative solutions, early on as this, intelligent transportation
system. . .
MM: That' s exactly, that's one of them; And if I may Mr. Mayor, to Mr. Hartwell, its not just
the voice of 8 people, we represent the City.
JH: I'm aware of that. . .
MM: Let me finish, and I think this will give the public, and I've been to all these meetings the
that are
past year, and I'm hearing what they' re saying, and the people I hear, these are the issues
bothering them. And this may give the public also kind of a framework that they can work from
that' s acceptable to them. I've heard some ideas that are a bit farther out like double decking
down through Fort Walton Beach, that certainly wouldn' t work and we wouldn' t support, so I
think its coming out and making a statement as to what we can support.
I also talked the other day with the City Manager an she' s going to talk with the CDS Director
and come up with some other parameters, not parameters but issues that would be important to
us as what wouldn' t disturb us. . .
JT: One final. if. basically, we are saying there will be no bridges in the Fort Walton
we do this
Beach unless they are west of Brooks Bridge?
Mayor: I don' t think it says that. . .
JT: Well, if you take away the Hollywood Bridge and the Brooks Bridge Corridor, there' s only
one area left. .
MM: Let me explain. Number 1 says the Hollywood Bridge Corridor entirely. Number 2 says a
toll bridge, a toll bridge in the BB Corridor. Number 3 says any of the two suggested bridges
that Figghas suggested. So I'm not there can' t be a bridge in the BB Corridor, I'm
saying
saying it can' t be a toll bridge. And shouldn' t be the ones they are proposing. And the other
portion of that, if we come up with a bridge for the Brooks Bridge Corridor, it has to meet
number 4, that it won' t tear up our downtown, it will have minimum impact.
Mayor: Dr. Pullen?
WP: Comment. What Figg suggested for Brooks Bridge was everything, place everything east
of it, so we are wiping that out.
MM: Yeah. Or just both of them, they do, they go through my neighborhood, they go over
Chris' house, one of them lands at the banlc . .
Mayor: Anyone else? Ms. Shanahan?
JS: I'll speak later. . .
Mayor: OK, please vote. OK, it does pass. . .
Mayor: As an aside, I've been invited to a WSRE public broadcasting forum on Thursday night,
and they want to talk about proposed bridges. Also on the panel will be Kathy Foster, member
of the ECBA, a gentlemen named Gabe Woods" local businessman, and Ms. Teresa Garmon. So
what I will take with me is what we talked about tonight, what we agreed to. Mike' s opinion is
already out there, in the paper, so I will go over there and talk about what we talked about
tonight. Anything else on the bridge? OK...
An Open Letter to The People ofOkaloosa County,
The E. C. B.A., and Figg Engineering.
Today is March lOth, 2006, and yesterday I attended the E.C.B.A.' s
meeting to choose a designated corridor for our new bridge. This was in my humblest
opinion, a continuing joke. One that you,people of the county and cities there ~ are
going to pay dearly for. Quite frankly, I'm sick of all that I have seen and heard, and that
has been a lot,leading no where. There are 180,000 some odd people in this county.
Their future, Your future, is being decided by the input of less than one tenth of one
percent of the population, and ultimately, a board of five unelected, but appointed
people. Wake up people, before it is too late.
I designed and proposed an alternative route over two years ago, had most of it printed in
the Daily News, and presented it to the bridge authority. The response, very positive, was
over whelming. I again, at the first charrette, put forth this design and admit while
receiving some negative comments, most of which were from the point of encroachment
on Air Force island land, again received very positive response. The corridor that was
laid out,crossed the sound at Hurlburt' s front gate, combining a project that was already
in the works to widen and add turnout lanes to 98. The additional site requirements to add
the bridge at that location, were, and still are, minimal, and required no other
displacement of any buildings that the Air Force had not already planned to move to
accommodate the widening plan,that plan also included over passes to accommodate
through traffic and eliminate the light at the gate. The main reason for choosing this site
for the cross sound span was that it was the first point at which East bound traffic was
bottle- necked creating the first of several problem areas on 98, West bound traffic was
relatively unimpeded after this point. The construction of the bridge could be done
without any disruption of traffic flow at all.The secondary thought of diverting traffic at
this point, was, that it was, and still is, the best place to divide local traffic from through
traffic moving past Fort Walton to Destin and other points East. The third reason being
that the landing of the old ferry made excellent bridge landings,
Once on the island, an elevated causeway would connect with the existing Santa Rosa
Blvd. carrying traffic to be rejoined with 98 East of Brooks Bridge. A second span
crossing at Wright Pkwy. would serve as a local feeder and a secondary span to join Ft.
Walton and the Island. This was never meant to be the Main S~ dumping traffic onto
Wright Pkwy. carving up a few schools and neighborhoods, put additional load on
to an
the Mary Esther Cut- off, Beal Pkwy. intersection. Carrying traffic to where? The outlay
that the Figg Engineers added is senseless, and was in no way, shape, or form.,in the
original plan we put forth. The intersection of that bridge at 98 was to be a very simple
standard four way stop light.Not the monstrosity that, again, was added by Figg
Engineers. It was originally meant to have as small a footprint as possible, not steamroll
over everything in its path, and create another area of congestion, not to mention
destroying everything from 98 to the Cut-off.
Now we come to the point that the route meets Santa Rosa Blvd., this has been the
source of major upheaval and where the original plan hit a
major roadblock. Here I will
concede that the original plan could have been better refined to
