READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — October 15, 2013 — E - Request Letter & Supplemental Documentation for BWB DRI DO Amendment (1 of 3) — reading text
Part 1 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 24-E - Request Letter _ Supplemental Documentation for BWB DRI DO Amendment _1 of 3_.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Law Office of Lauralee G. Westine, P.A.
800 Tarpon Woods Boulevard, Suite E-1
Palm Harbor, Florida 34685
Telephone: (727) 773-2221
Facsimile: (727) 773-2616
SENT VIA UPS OVERNIGHT DELIVERY
July 30, 2013
Elliot Kampert, AICP; Director
Okaloosa County Growth Management Department
1804 Lewis Turner Boulevard, Suite 200
Fort Walton Beach, FL 32547
RE: Crown Castle Niceville--Supplemental Documentation for Bluewater Bay
DRI DO Amendment and Variance Applications
Dear Mr. Kampert:
On March 28, 2013, my client, Crown Castle, USA (Crown) submitted to Okaloosa County the
following applications and supporting documentation in order to replace an existing 317' tower
with a 317' self support tower to be located within the Bluewater Bay DRI, 1050 Bay Drive,
Niceville, Parcel ID 22-1S-22-0000-0001-0090: (1) Development Order Application and (2)
Variance Application. Currently, this tower is supporting the antennas of federal, state and local
public safety entities. The location of this tower was reviewed and determined that it would
allow the existing level of service to these entities.
On March 28, 2013, Crown submitted to the Florida Department of Economic Opportunity
(DEO) a request for a determination that the addition of the 317' replacement tower to
aforementioned parcel located within the Bluewater Bay DRI be considered a non-substantial
deviation.
On June 17, 2013, DEO issued a letter stating that the proposed 317! replacement tower "...may
be reviewed and adopted as a non-substantial amendment to the development order..." without
going through the NOPC process described in Section 380.06(19)(e)2, Florida Statutes. Boih the
initial March 28, 2013 correspondence and the June 17, 2013 correspondence have been included
herein as Exhibits A-1 and A-2.
On May 30, 2013, Crown's proposed 317' replacement tower was reviewed and unanimously
recommended for approval by the Okaloosa County Aviation Advisory Committee.
correspondence is included herein as Exhibit B.
As such, Crown respectfully requests that the Bluewater Bay DRI be amended to allow one 317'
self support communication tower at 1050 Bay Drive, Niceville. Parcel ID 22-1 S-22-0000-0001-
0090 in accardance with the site plan submitied on March 28, 2013. The parent tract is zoned
Mixed Use-] (MU-1) and has a future land use designation of Mixed Use-1 (MU-1). The MU-1
district allows for residential, commercial, institutional, industrial, recreation or any combination
thereof as approved in the DRI development order. Currently, the Bluewater Bay DRI map
identifies the parent tract as Recreation (R). Crown is not requesting the overall designation of
Recreation be modified, rather that the Board of County Commissioners approve the tower use
on the parent tract as a permitted use in accordance with 2.20.081, Okaloosa County Land
Development Code.
Please see below how this application complies with the applicable Future Land Use Policies.
For your convenience, my responses are bolded below.
FUTURE LAND USE POLICIES
Policy 1.1 The maximum densities and intensities permitted on a given parcel of land
shall be based upon the suitability of topography and soil types for septic drainfield
systems, potable water wells, and ability to physically support buildings and
improvements, as determined by the Okaloosa County Soils Map, and Department of
Health, the Natural Resources Conservation Service, DEP, COE, and appropriate
engineering manuals, in the review of proposed development projects.
Consistency: X_ YES NO N/A
Analysis:
The proposed replacement tower will not increase the density or intensity of uses on the
parent tract which is currently being used in the following manner: swimming pool, tennis
courts, putt putt golf course and boat storage. The tower is unmanned. It generates
approximately 1/trip/month/tenant. The tower does not require water or sewer, only
electricity and telephone. No buildings shall be constructed as part of the tower facility.
Equipment shelters or cabinets shall be installed to accommodate tenants on the tower.
Prior to construction, a soil report is reviewed as part of the engineering of the concrete
caissons.
Policy 1.2 The development approval shall ensure that new development and
redevelopment is consistent with natural drainage patterns, and further shall require
appropriate stormwater management systems consistent with the adopted drainage level
of service, natural drainage patterns, and soil conditions.
Consistency: _ X YES NO N/A
Analysis:
The tower and related facilities are located within a 100' x 100' lease area which shall be
fenced. Other than concrete slabs on which to place tenants’ equipment and concrete
caissons, the balance of the compound area is unpaved and covered with gravel. Drainage
calculations will be provided as part of site plan/building permit review. Currently, Crown
engineers are working with county staff on this matter.
Policy 1.3 Flood plains and floodways in the County shall be identified and development
shall be limited, consistent with FEMA requirements. Also see Conservation Policy 2.1
and Coastal Management Policy 2.1.2.
Consistency: xX YES NO N/A
Analysis:
The proposed tower is located in Flood Zone X.
Objective 2 Development, redevelopment, land use plan amendments, and changes to the zoning
of a site shall be coordinated with the availability of facilities and services, including assurance
that land is available for the needed facilities and services.
Policy 2.1 All development permits for development undertaken after adoption of this
ordinance, including any redevelopment activities, shall be issued only if there are public
facilities and services available with sufficient capacities to maintain the level of service
standards adopted in this plan concurrent with the impacts of the proposed development.
Consistency: xX YES NO N/A
Analysis:
The proposed tower does not require public facilities such as school, sewer or water. The
tower solely utilizes telephone and power. A technician generally visits the tower site
1x/month. As such, the tower will not impact the level of service standards adopted.
Policy 2.2 Development orders and/or permits may be issued conditioned upon the
availability of facilities and services to meet the needs of development pursuant to the
minimum standards to satisfy concurrency requirements established in Chapter 4, Policy
Document.
Consistency: xX YES NO N/A
Analysis:
The tower will not increase the density of the area in that it is not adding residential units
or commercial square feet to the Bluewater Bay DRI. Facilities and services required for
the tower, such as power and telephone, are readily available.
Policy 2.4 The County shall continue to require dedication of adequate rights-of-way for
use as roadways and by utility companies for new construction, service extensions, or
facility improvements.
Consistency: YES NO X N/A
Analysis:
ROW and utility easements exist in the area.
Policy 2.5 The County shall maintain and enhance the safety and efficiency of the arterial
and collector road system and minimize transportation conflicts associated with
development by coordinating the FDOT driveway permitting process, limiting
development access to the transportation system, and increasing interconnection between
adjacent developments.
Consistency: YES NO X_ N/A
Analysis:
The tower has little to no traffic impact.
Policy 2.6 Residential and non-residential developments may be proposed in phases in
order to coordinate the provision of facilities and services with the actual development
that requires the facilities and services.
Consistency: YES NO X_ N/A
Analysis:
The tower project shall be completed at one time and all facilities and services are
presently available. There is no propose phasing of the project.
Objective 3 The County shall encourage redevelopment of areas that are exhibiting evidence of
decline (i.e., disproportionate number of vacant, dilapidated and/or substandard structures).
Redevelopment shall be encouraged through redevelopment programs, through cooperative
efforts with adjacent local governments, and through maintaining land development regulations
that contain standards and procedures to encourage redevelopment in zoning districts where
such redevelopment is desirable. It is further the objective of the County to ensure that
redevelopment does not create incompatibilities of land use districts or adjacent structures nor
continue existing incompatibilities.
Policy 3.1 Compatibility shall be a primary concern in the review and approval of
redevelopment projects, and shall be ensured through Policies 4.1, 4.3, and 4.5.
Consistency: YES NO xX NA
Analysis:
The proposed tower is new construction and not proposed redevelopment.
Policy 3.4 In cases where redevelopment projects cannot meet current development
standards the County shall, through the development review process, work together with
the developer to find methods of mitigation that will improve the site to the maximum
extent possible.
Consistency: YES NO x N/A
Analysis:
The proposed tower is new construction and not proposed redevelopment.
Objective 4 Land uses (both general land use categories and zoning districts as well as
individual uses or activities or structures housing those uses) should be generally compatible
with the character of the adjacent and surrounding neighborhood or community. Toward this
end, uses that are inconsistent with the neighborhood or community character shall be
reduced or eliminated over time.
Policy 4.1 Compatibility between land uses shall be promoted by:
1. Future land use designations on the future land use map and allowable uses,
densities, and intensities within such designations;
2. Zoning districts on the official zoning map and attendant zoning regulations, and;
3. Mitigation measures as described in Policy 4.3.
Consistency: _ X YES NO N/A
Analysis:
The MU-1 district within the Bluewater Bay DRI allows residential, commercial,
institutional, industrial, recreation or any combination thereof as approved in the DRI
development order. While the parent tract is designated Recreation, its use as boat storage
facility lends itself to be a more commercial use. DEO has determined that the proposed
317' replacement tower on the parent tract is not a substantial deviation from the original
DRI.
Policy 4.2 Compatibility determinations shall be included in the review and approval of
both new development and redevelopment; however, for redevelopment of blighted areas,
compatibility alone will not negatively affect the review.
Consistency: YES NO x N/A
Analysis:
The tower is new construction and not redevelopment.
Policy 4.3 The County may consider or require any or all of the following techniques
used in a proposed development to wholly or partially mitigate incompatible impacts:
a. variable buffers, combining land and landscaping to achieve adequate separation
of uses, appropriate open space, reduction of potential noise, light, glare, and/or
pollution, and screening of physical features of a proposed development (also see
Policy 10.14);
b. variable setbacks, based upon degree of difference in proposed density, intensity,
scale, mass, or height;
c. placement and effective screening or shielding of site features such as lights,
signs, dumpsters, loading areas, parking areas, outdoor storage, or other features
with potential negative impacts;
d. effective transitions of on-site densities, intensities, scale, mass, or height; and
e. other innovative site design features that effectively achieve compatibility and
effectively mitigate potential negative impacts.
Consistency: X YES NO N/A
Analysis:
Crown proposed the tower in a highly vegetative area in order to buffer and screen the
tower from the surrounding uses. While Crown is requesting 2 variances from residential
separation, the tower has been designed with a 100' fall radius, the smallest setback to the
parent