Okaloosa County BOCC — January 21, 2014 — Skanska Final Payment — reading text
Part 2 of 6. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 121-Skanska Final Payment.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
|Fumishings
31 |Special Construction 315,471.00 (212.113 00) 103,358.00 103,358.00 103,358.00 100%
32 {Conveying Systems 250,238.00 (8,096.00) 242,142.00 242,142.00 242,142.00 100%
33 | Mechanical Systems 3,088,649.00 (1,394.223.00) 1,694,426.00 1,694,426.00 1,694,426.00 100%
34 | Electrical Systems 2,846,582.00 (634,615.00) 2,211,967.00 2,186,972.00 24,995.00 2,211,967.00 100%
35 |General Conditions 2,644,474,00 34,460.00 2,678,934.00 2,678,934.00 2,678,934.00 100%
36 |Payment and Performance Bonds 195,788.00 981.00 196,769.00 196,506.00 263.00 196,769.00 100%
37 | Business License 6,242.00 45.00 6,287.00 6,279.00 8.00 6,287.00 100%
38 | Builders Risk 395,143.00 2,088.00 397,231.00 396,677.00 554.00 397,231.00 100%
39 |General Liability 221,675.00 1,149.00 222,824.00 222,519.00 305.00 222,824.00 100%
40 |Subguard 235,278.00 22,873.00 258,151.00 257,826.00 325.00 258,151.00 100%
Al [Fee 936,508.00 4,696.00 941,204.00 939,957.00 1,247.00 941,204.00 100%
42 |Owmer Contingency
43. Construction Contingency 652,434.00 (652,434.00)
44 [Owner Direct Purchase Orders
45 {OCO No. | - Inctuded in Individual Line Items Above
46 }OCO No. 2 - Included in Individual Line ltems Above
47 {OCO No. 3 - Included in Indivudual Line tems Above
SO Project Total 22,400,229.00 (7,9§9.713.00) 14,440,516.00 14,412,819.00 27,697.00 14,440,516.00 100%
gebPLICATION AND CERTIFICATION FOR PAYMENT AIA DOCUMENT G702 PAGE1 OF 2 PAGES
* TO OWNER: "PROJECT: APPLICATION NO: 24 Distribution to: .
- Okaloosa County Board of Okaloosa County Courthouse DATE: 05/08/13
County Commissioners Annex Extension
602-C North Pearl Street 1940 Lewis Turner Blvd. X JOWNER
Crestview, FL 32536 Fort Walton Beach, FL 32547 PERIOD TO: 5/6/2013 X JARCHITECT
FROM CONTRACTOR: VIA ARCHITECT: X_|CONTRUCTION MANAGER
Skanksa USA Building Inc. Heery Design
55 Ivan Allen Jr. Boulevard, Suite 600
Atlanta, GA 30308
CONTRACT: Construction Manager
Orlando, FL 32839
4700 Millenia Boulevard, Suite 550
PROJECT NO: C09-1698-CAO
CONTRACT DATE: June 21, 2008
CONSTRUCTION MANAGER'S APPLICATION FOR PAYMENT
Application is made for payment, as shown below, in connection with the Contract.
Continuation Sheet, AIA Document G703, is attached.
1. ORIGINAL CONTRACT SUM $ ___.22,400,229.00
2. Net change by Change Orders $ x - =7,959,713.00
3. CONTRACT SUM TO DATE (Line 1 + 2) $ -14,440,516.00
4. TOTAL COMPLETED & STORED TO $ 14,440,516.00
DATE (Column G on G703)
5. RETAINAGE:
a of Completed Work 0.00
(Column D + E on G703)
b. of Stored Material 0.00
‘(Column F on G703)
Total in Column I of G703) $ 0.00
6. TOTAL EARNED LESS RETAINAGE $ 14,440,516.00
(Line 4 Less Line 5 Total)
7. LESS PREVIOUS CERTIFICATES FOR
PAYMENT (Line 6 from prior Certificate) $ 14 402,819.00
8. CURRENT PAYMENT DUE $ 37,697.00.
9. BALANCE TO FINISH, INCLUDING RETAINAGE ~~ 0.00
(Line 3 less Line 6)
~~ CHANGE ORDER SUMMARY | ADDITIONS | DEDUCTIONS |
Total changes approved
in previous months by Owner 0.00 -6,083,433.00}
Total approved this Month 0.00} lane
TOTALS 0.00] -7,959,713.00
NET CHANGES by Change Order -7,959,713.00
The undersigned Contractor certifies that to the best of the Contractor's knowledge,
information and belief the Work covered by this Application for Payment has been
completed in accordance with the Conrract Documents, that all amounts have been paid by
the Contractor for Work for which previous Certificates for Payment were issued and
payments received from the Owner, and that current payment shown herein is now due.
Viselestyy,
Construction Manager: Keith Shelton, Senior Project Manager _\\¥ R HUA,
Skanska USA Building Inc. & on eesti Oe
Sy 2 SS!ON %
By: Koad, QL Date: SG OS re a
26! o,<:
State of: Georgia Douglas sO:7 se lees
Subscribed and sworn to before me this 8th day of May rNKA Lo Py Bw $3 ‘7 = =
Nay Pie. = , Omens eS
My Commission €xpires: 4,4, 6) Tesesese &S
In accordance with the Contract Docurnents, based on on-site observations and the data
comprising the application, the Architect certifies to the Owner that to the best of the
Architect's knowledge, information and belief the Work has progressed as indicated,
the quality of the Work is in accordance with the Contract Documents, and the Contractor
is entitled to payment of the AMOUNT CERTIFIED.
31,697. aXe)
(Attach explanation if amount cértified differs from the amount applied. Initial all figures on this
pstmt and onthe Continuation Sheer that are changed to conform with the amount certified.)
Robert Egleston, Executive Associate
nS ol iS
eg fable. Te ALAN GREED eae ly tb the
Contractor named herein. Issuance, payment and acceptance of payment are without
Prejudice to any rights of the Owner or Contractor under this Contract.
AMOUNT CERTIFIED
sew e see ceee
AIA DOCUMENT G702 - APPLICATION AND CERTIFICATION FOR PAYMENT - 1992 EDITION - AIA - ©1992
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, DC 20006-5292
a
CONTINUATION SHEET AIA DOCUMENT G703 eis Ges wanes
‘AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO- 74
Contractor's signed certification is attached. APPLICATION DATE: 05/08/13
In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 05/06/13
Use Column I on Contracts where variable retninage for line items may apply. OKALOOSA COUNTY PROJECT NO: C09-1698-CAO
A_1B c D 7 E F Go H 1
(TEM |DESCRIPTION OF WORK SCHEDULED CHANGE REVISED WORK COMPLETED MATERIALS TOTAL % BALANCE RETAINAGE
NO. VALUE ORDER CONTINGENCY SCHEDULED | FROM PREVIOUS | | THISPERIOD | PRESENTLY COMPLETED (G+C) TO FINISH (OF VARIABLE
VALUE STORED («c-Q) RATE)
@+e) (NOTIN TO DATE
DORE) (DAEs)
1 | Sitework 1,851,376.00 {1,349.489.00) 501,887.00 501,887.00 501,887.00 100%
2 [Demolition 59,257.00 (S9.257.)),
3 }Earthwork & Site Utilities 692,976.00 (78,552.05 614,424.00 614,424.00 614,424.00 100%
4 | Reinforced Concrete 408,074,00 (498,074.00
5 }Cement Finishing
6 | Tilt-Up Concrete 827,490.00 (10,854 00) $16,636.00 816,636.00 $16,636.00 100%
7 +|Masonry 488,626.00 {188 498.00) 300,128.00 300,128.00 300,128.00 100%
8 {Structural and Misc. Stee! 974,162.00 1456,.019.00) 518,143.00 518,143.00 518,143.00 100%
9 | Rough Carpentry 56,700.00 {56,700,00)
10 | Millwork 1,159,880,00 (833,376.00) 326,504.00 326,504.00 326,504.00 100%
11 |Waterproofing and Caulking 297,350.00 (169,522 00) 127,828.00 127,828.00 127,828.00 100%
12 [Roofing and Sheet Metal 430,709.00 (227.051 00) 193,658.00 193,658.00 193,658.00 100%
13 |Hollow Metal 549,702.00 4419.394.00) 130,308.00 130,308.00 130,308.00 100%
14 | Wood Doors 15,334.00 (IS.334.00)
1S |Special Acting Doors 21,308.00 (14,510.00) 6,798.00 6,798.00 6,798.00 100%
16 }Finish Hardware 2,000.00 (2.000.000)
17 |Glass, Glazing, and Storefront 699,035.00 (169,710 00) 589,325.00 $89,325.00 589,325.00 100%
18 }Lath, Plaster, and Stucco
19 [Drywall 640,770.00 (17,481.00) 623,089.00 623,089.00 623,089.00 100%
20 Ceramic Tile 77,650.00 (40,311.00) 37,339.00 37,339.00 37,339.00 100%
21° ‘| Acoustical 362,868.00 (362,868.00)
22. |Resilient Floors 268,150.00 (361,397.00) 106,753.00 106,753.00 106,753.00 100%
23° | Painting and Wall Covering 261,886.00 11,654.00 273,540.00 273,540.00 273,540.00 100%
24 |Special Flooring 211,932.00 (71,899.00) 140,033.00 140,033.00 140,033.00 100%
25 |Miscellancous Specialties 173,976.00 (108.1 70.00) 65,806.00 65,806.00 65,806.00 100%
26 Toilet Partitions and Acocssories 77,186.00 (77,186.00)
27 | Equipment 3,350.00 (3,330.00)
28 Signage 115,024.00 115,024.00 115,024.00 115,024.00 100%
29 {Casework
30 | Furnishings
31 |Special Construction 315,471.00 42$2.113.00) 103,358.00 103,358.00 103,358.00 100%
32 {Conveying Systems 250,238.00 8,096.00) 242,142.00 242,142.00 242,142.00 100%
33 |Mechanical Systems 3,088,649.00 (1.394.223.0053 1,694,426.00 1,694,426,00 1,694,426.00 100%
34 | Electrical Systems 2,846,582.00 (634,615.00) 2,211,967.00 2,186,972.00 24,995.00 2,211,967.00 100%
35 |General Conditions 2,644,474.00 34,460.00 2,678,934.00 2,678,934.00 2,678,934.00 100%
36 {Payment and Performance Bonds 195,788.00 981.00 196,769.00 196,506.00 263.00 196,769.00 100%
37 {Business License 6,242.00 45.00 6,287.00 6,279.00 8.00 6,287,00 100%
38 | Builders Risk 395,143.00 2,088.00 397,231.00 396,677.00 $54.00 397,231.00 100%
39 |General Liability 221,675.00 1,149.00 222,824.00 222,519.00 305.00 222,824.00 100%
40 |Subguard 235,278.00 22,873.00 258,151.00 257,826.00 325,00 258,151.00 100%
41 {Fee 936,508.00 4,696.00 941,204.00 939,957.00 1,247.00 941,204.00 100%
42. [Owner Contingency
43 {Construction Contingency 652,434.00 {082,434.00)
44° |Owner Direct Purchase Orders
45 JOCONo. | - Included in Individual Line Items Above
46 JOCO No. 2 - Included in Individual Line Items Above
47 JOCO No. 3 - Included in Indivudual Line items Above
50 Project Total 22,400,229.00 (7,959.713.00) 14,440,516.00 14,412,819.00 27,697.00 14,440,516.00 100%
tao Revd 5-14-15
HEERY
Date: May 13, 2013
To: Ernie Padgett
Title: Okaloosa County Administrator
Company: Okaloosa County Administrative Services
Addtess: 1804 Lewis Turner Blvd.
Fort Walton Beach, FL 32547
Phone No.
Fax No.
TRANSMITTAL
From: Bob Egleston Email Address: Transmittal / Fax toggles above
Return Fax:
Re:
Project: Okaloosa County Courthouse Annex Extension
Project No: 3007900
Via. Ground
Distribution:
File: A01-04
Qty. Description Dated Action Required
2 Skanska Final Pay Application 5/8/13
2 Skanska Change Order 003 5/7113
Comments
Mr. Padgett - Enclosed are the final Skanska documents for the County's signature on the Courthouse Annex Extension
Project. If you have any questions, please call Keith Shelton with Skanska.
HEERY INTERNATIONAL, INC.
Millenia Lake |, 4700 Millenia Boulevard, Suite 550
Orlando, FL 32839 1 of 1
p 407.992.6300 f 407.992.6399 Document2
SKANSKA | Transmittal Cover Sheet
Detailed, Grouped by Each Transmittal Number
Okaloosa County Courthouse Annex Project # 219515 Skanska USA Building Inc.
1940 Lewis Turner Blvd. Tel: 850-315-4683 Fax: 850-315-4688
Fort Walton Beach, FL 32547
Reference Number: 0385
Patti Hanna : Keith Shelton
Okaloosa County Skanska USA Building Inc.
5489 Old Bethel Road GMC Health & Wellness Center
Crestview, FL 32536 201E. Greene Street
Tel: 850-689-5790 Milledgeville, GA 31061
Fax: Tel: 478-454-0178
Fax: 478-454-0192
O Acknowledgement Required
As Requested . FedEx - Overnight
0001 1.00 Closeout Waiver and Release of Lien
Upon Final Payment
0002 1.00 Closeout Proof of Completion
0003 1.00 Closeout Certificate of Insurance
0004 1.00 Closeout Consent of Surety Company
to Final lt pale arent Proof of
Sony Cnn Yeor
Please find attached the original Waiver nil Release of Lien —_ Final Payment, Proof of Complation ieheaclaatherk
Certificate of Insurance, and Consent of Surety Company to Final Payment and Proof of Performance and Payment Bonds
Conitnuation for 1 Year for the Okaloosa County Courthouse Annex Extension project. Should you have any questions or
need additional information, please do not hesitate to contact me.
Thanks-
File: 0+270
Ke 12.10.13
Signature Signed Date
Prolog Manager Printed on: 12/10/2013 7Southeast Page 1
WAIVER AND RELEASE OF LIEN UPON FINAL PAYMENT
The undersigned lienor, in consideration of the final payment of $37,697.00, hereby waives and
releases its lien and right to claim a lien for labor, services, or materials furnished to Okaloosa
County Board of County Commissioners on the job of Okaloosa County Board of County
Commissioners to the following property:
Okaloosa County Courthouse Annex Extension
1940 Lewis Turner Blvd
Fort Walton Beach, FL 32547
Commencing at the General Land Office monument dated 1937, 2" pipe with brass cap, which is at the quarter
section corner common to section 25 and 26, T-1-S R-24-W, being also a comer of a tract of land conveyed to the
Board of Public Instruction, Okaloosa County, Florida, on 30 December 1970, and a comer of a tract of land owned
by the United States of America at Eglin Air