Company will install the proposed sanitary sewer force main from Pump
Station No. 1 to Bob Sikes Boulevard and would also be responsible for completing the
required jack and bores and directional drills north of Bob Sikes Boulevard.
2. DISCUSSION:
2. 1. On September 26, 2012, Hatch Mott MacDonald and the Purchasing Division received
quotes from two ( 2) vendors for the 36 -inch ductile iron pipe that Okaloosa County
crews will install.
2.2. Quote solicitations were sent to a total of three ( 3) vendors.
2. 2. 1. American Cast Iron Pipe Company: Base Bid Amount = $ 1, 614,450. 81;
Protecto 401 Deduction = $ 103, 000. 00; Total Base Bid w/ Deduction =
1, 511, 450. 81
2. 2. 2. United States Pipe and Foundry Company: Base Bid Amount = $ 2, 130, 505. 70;
Protecto 401 Deduction = $ 626, 814.21; Total Base Bid w/ Deduction =
1, 503, 691. 49
2. 2. 3. Mc Wane Cast Iron Pipe Company: No Bid
2. 3. The Base Bid structure is a unit price bid with estimated quantities that included the 36-
inch ductile iron pipe with an interior coating meeting the specifications. The deductive
alternate allowed the vendors to bid an alternate interior coating ( Protecto 401).
2. 4. After reviewing the quotes, exceptions to the specifications, and coordinating with
Okaloosa County, City and County Staff and HMM recommend award of the unit
prices submitted with the Base Bid to the apparent low bidder, American Cast Iron Pipe
Company. Please note that the quantities are subject to change during the project, but
the overall bid amount is a not -to- exceed amount.
Packet Pg. 118
14.2
City Council of Fort Walton Beach
0
To:
ENGINEERING & UTILITY SERVICES
MEMORANDUM
Michael D. Beedie, City Manager
From: Michael Beedie, City Manager
Date: October 9, 2012
Subject: Quote 2012 -0912 36 -Inch Di Pipe
3. FINANCIAL INFORMATION:
3. 1. The Base Bid amount of $1, 614,450. 81 is a not -to- exceed amount, but the contract is a
unit price contract.
3. 2. Based on the Interlocal Agreement with Okaloosa County for the northern section of
the force main, the contract amount will be split 50150 between Okaloosa County and
the City. Additional bid packages will be issued for the paving for the northern section.
3. 3. The funding source for the project is the FDEP' s Clean Water State Revolving Fund
SRF) Loan program. The City has received approval from FDEP for the requested
funding for the project. In the future, an SRF loan agreement will be developed and
executed.
4. RECOMMENDATION:
4. 1. Pursuant to City of Fort Walton Beach Code of Ordinances, Volume 11, Chapter 4,
Section 4. 01, Paragraph 4. 01. 025 and the Purchasing Policies and Procedures, Staff
requests City Council authorization to award Request for Quote 2012 -0912 to purchase
the 36 -inch ductile iron pipe and fittings for the new Pump Station No. 1 Force Main at
the unit prices submitted to the apparent low bidder, American Cast Iron Pipe
Company, for a not -to- exceed amount of $1, 614, 450. 81.
ATTACHMENTS:
Quote 2012 -0912 Bid Tabulation ( PDT)
SIGNATURE BLOCK:
Finance Completed 10/ 01 / 2012 1: 44 PM
City Attorney Completed 10/ 01/ 2012 3: 18 PM
Carole Jones Completed 10/ 02/ 2012 11: 35 AM
City Manager Completed 10/ 03/ 2012 7: 15 AM
City Council Pending
Packet Pg. 119
F14 2.. a
Hatch Mott MacDonald
Hatch Mott 5111 North 171h Ave
Pensacola, FL 32504
MacDonald T850. 484.6011
MCOOM35 100000155
www. hatchmott. com
L900006783
September 27, 2012
Michael D. Beedie, P. E.
City Manager
City of Fort Walton Beach
105 Miracle Strip Parkway SW
Fun Welton Beach, FL 32548
RE: City of Fort Walton Beach Florida Project
36 -inch Ductile Iron Pipe
Recommendation for award
FWB ITB No. Request for Quote # 2012 -912
NMM Project No. 299802
Dear Mr. Brodie:
Our firm has reviewed the two ( 2) direct vendor solicitation quotes that were received for the above referenced
project, on the afternoon of September 26, 2012, The Summary of Bids Received Form is attached for your
reference. At this time, the apparent low bidder for the project is American Cast Iron Pipe Company of
Birmingham, AL with an apparent low base bid, based upon unit prices, submitted for the quantities requested. The am
total sum of all unit price bids is $ 1, 614, 450. 81.
In the bidding process, the City had also requested alternate bids for providing certain substituted materials. The low
base bid recommended herein was not the lowest total cost option to the City. However, due to the exceptions taken
to the technical specifications by both bidders on their altemate bids, Hatch Mott MacDonald does not recommend
that the City exercise its option for the alternate bid scenario. We believe that the City' s interest is best served by
award of the base bid as recommended.
Subject to concurrence from the City Attomey and confirmation of the availability of funds, HMM recommends that
to Contract be awarded to the apparent low base bidder, American Cast Iron Pipe Company for the unit prices bid,
which in aggregate is $ 1, 614, 450. 81.
Should you have any questions or need additional information, please contact me at your convenience.
Very truly yours, qN "' " -- ,
latch Mott MacDonald , T • \,-, . A,QF• y
p
a}'QF'OV \0
ic,. ccJ
It Vx2^ 6 8.:
or
71r j2
Daniel W. Keck, P. E. '' *
Senior Project Manager STATE OF
encl.
1,,f sf A 1 A
o AL .
cc:
Paul Eubanks, Purchasing fueMy4 of Pon Walton Beach
Jason Getz, P. E., BCBE - HMM
PiMSZOU1CPG \MNMn299802 \DocumentstBlddingl B Rae for Award ITB RFQ # 2012- NQ,clocx
Pare Pg. 120
00
Hatch Mott " m• m,•. "„ °" w °^* ° ^.
macuonaio
QQ
14. 3
City Council of Fort Walton Beach
ENGINEERING & UTILITY SERVICES
1
MEMORANDUM
To: Michael D. Becdie, City Manager
From: Tim Bolduc, Development Services Manager
Date: October 9, 2012
Subject: Grant of Utility Easement at 119 Hollywood Boulevard NW
1. BACKGROUND:
1. 1. In September 2012, City Council awarded 1TB 12 -027 to construct a new sanitary
sewer force main from Pump Station No. I to Okaloosa County' s Arbennie Pritchett
WRF.
2. DISCUSSION:
2. 1. During the final design of the force main route, Hatch Mott MacDonald ( HMM)
determined a couple of areas along the route that would require either a temporary
construction easement or a permanent utility easement to allow for the construction of
the force main.
2. 2. One of the areas requiring both a construction and utility easement lies on the north side
of Hollywood Boulevard NW along the Coral Ditch south of the Fred Hedrick property.
This property is owned by Hollywood Property, LLC with a physical address of 119
Hollywood Boulevard NW.
2. 3. An casement was drafted to encompass the area of the sanitary sewer force main for
purposes of construction and maintenance of the sewer main. There are two required
temporary construction easements, which total approximately 1, 433 square feet, and
one permanent utility easement, which totals approximately 2, 445 square feet.
2. 4. An appraisal was conducted by a sub -consultant of HMM to determine the value of the
easement, and it was determined that the permanent utility easement is valued at
52,200. 00 with the temporary construction easements valued at $ 160.00.
2. 5. The authorized representatives for Hollywood Property, LLC signed the Grant of
Easement to the City on May 5 & 10, 2012 and accepted the offer of $2, 360. 00 on May
10, 2012.
3. FINANCIAL INFORMATION:
3. 1. The easement acquisition value of $2, 360. 00 would utilize contingency funds available
in the FY 2012 -13 Utilities Fund budget.
4. RECOMMENDATION:
4. 1. Staff respectfully requests City Council authorization to accept and record a Grant of
Easement from Hollywood Property, LLC for a permanent utility easement and
Packet Pg. 122
14. 3
City Council of Fort Walton Beach
0
To:
ENGINEERING & UTILITY SERVICES
MEMORANDUM
Michael D. Beedie, City Manager
From: Tim Bolduc, Development Services Manager
Date: October 9, 2012
Subject: Grant of Utility Easement at 119 Hollywood Boulevard NW
temporary construction easements at 119 Hollywood Boulevard NW. Staff also
requests City Council authorization for the Mayor to execute a Purchase Agreement in
the amount of $2, 360. 00 for the required utility and construction easements to construct