READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — October 7, 2014 — Resolution and SJPA for Replacement of Access Control System at VPS — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 112-Resolution and SJPA for Replacement of Access Control System at VPS.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
RESOLUTION 14-
A RESOLUTION OF THE BOARD OF COUNTY
COMMISSIONERS; APPROVING THE | FIRST
SUPPPLEMENTAL JOINT PARTICIPATION
AGREEMENT TO CONTRACT NO. AREOS5
RENAMING THE PROJECT TO PROVIDE FOR
REPLACING THE ACCESS CONTROL
SYSTEM AT NORTHWEST ~~ FLORIDA
REGIONAL AIRPORT.
WHEREAS, the County previously entered into a Joint Participation Agreement
(AREO5) with the Florida Department of Transportation for Airport Erosion Control and
Infrastructure Upgrade, and
WHEREAS, the County has determined that a higher priority project to Replace the
Access Control System at Northwest Florida Regional Airport should be funded therewith;
NOW THEREFORE, be it resolved by the Board of County Commissioners of Okaloosa
County as follows:
1. The Board approves the SUPPLEMENTAL AGREEMENT NO. ONE, a copy of which
is attached hereto as Exhibit “A”.
2, The Chairman is authorized to execute the Agreement on behalf of the Board.
DULY ADOPTED THIS 7" day of October, 2014.
BOARD OF COUNTY COMMISSIONERS OF
OKALOOSA COUNTY, FLORIDA
Charles K. Windes, Jr.
Chairman
ATTEST:
CLERK OF THE CIRCUIT COURT
OKALOOSA COUNTY, FLORIDA
Gary J. Stanford
Deputy Clerk
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 725-030-07
PUBLIC TRANSPORTATION PUBLIC TRANSPORTATION
SUPPLEMENTAL. JOINT PARTICIPATION AGREEMENT Page 1 of 4
Number ONE
Financial Project No.: Fund: 010 FLAIR Category: 088719
42561419401 Function: 637 Object Code: 750004
(item-segment-phase-sequence) Federal No.: N/A Org. Code: 55032020329
Contract No.: AREOS DUNS No.: 61-327-7649 Vendor No.: F596000765015
Catalog of Federal Domestic Assistance Number: N/A Catalog of State Financial Assistance Number: 55004
THIS AGREEMENT, made and entered into this day of , ,
by and between the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida,
hereinafter referred to as the Department, and Okaloosa County Board of County Commissioners
1804 Lewis Turner Blivd., Suite 206, Ft Walton Beach, Florida 32547
hereinafter referred to as Agency.
WITNESSETH:
WHEREAS, the Department and the Agency heretofore on the 22nd day of April ,2014
entered into a Joint Participation Agreement; and
WHEREAS, the Agency desires to accomplish certain project items as outlined in the Attachment "A" appended
hereto; and
WHEREAS, the Department desires to participate in all eligible items for this project as outlined in Attachment
"A" for a total Department Share of $50,000.00
NOW, THEREFORE THIS INDENTURE WITNESSETH: that for and in consideration of the mutual benefits to flow
from each to the other, the parties hereto agree that the above described Joint Participation Agreement is to be amended
and supplemented as follows:
1.00 Project Description: The project description is amended
to Upgrade, by replacement, the Access Control System at Northwest Florida Regional Airport.
725-030-07
PUBLIC TRANSPORTATION
06/11
Page 2 of 4
2.00 Project Cost:
Paragraph 3.00 of said Agreement is increased by $37,500.00
bringing the revised total cost of the project to $100,000.00
Paragraph 4.00 of said Agreement is increased by $0.00
bringing the Department's revised total cost of the projectto $50,000.00
3.00 Amended Exhibits:
Exhibit(s) B of said Agreement is amended by Attachment "A".
4.00 Contract Time:
Paragraph 18.00 of said Agreement une 30,2017
5.00 E-Verify
Vendors/Contractors:
1. shail utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment eligibility
of all new employees hired by the Vendor/Contractor during the term of the contract; and
2. shall expressly require any subcontractors performing work or providing services pursuant to the state contract
to likewise utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment
eligibility of all new employees hired by the subcontractor during the contract term.
725-030-07
PUBLIC TRANSPORTATION
06/11
Page 3014
Financial ProjectNo. 42561419401
Contract No. AREO5
Agreement Date
22nd 2014
Except as hereby modified, amended or changed, all other terms of said Agreement dated April
and any subsequent supplements shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first
above written.
AGENCY FDOT
Okaloosa County Board of County Commissioners Appravarbe Camareter Form for Gate of Funding
AGENCY NAME
Charles K. Windes, Jr.
LEGAL REVIEW
SISHATSRYPRINIEH GR IFES) DEPARTMENT OF TRANSPORTATION
Jason Peters, P.E.
SIGNATURE
DEPARTMENT OF TRANSPORTATION
Chairman .
Director of Transportation Development D-3
TITLE TITLE
ATTACHMENT "A"
SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT
Financial Project No.
Contract No. ARE05
42561419401
725-030-07
PUBLIC TRANSPORTATION
06/11
Page 4 of 4
Agreement Date
This Attachment forms an integral part of that certain Supplemental Joint Participation Agreement between
the State of Florida, Department of Transportation and Okaloosa County Board of County Commissioners
1804 Lewis Turner Blvd., Suite 206, Ft Walton Beach, Florida 32547
dated
DESCRIPTION OF SUPPLEMENT (Include justification for cost change):
No DOT cost change. Amending description to Upgrade, by replacement, the Access Control System at Northwest
Florida Regional Airport. Replace the existing UTCFS Diamond || Access Control System with a new IP-based access
control system (ACS) at Northwest Florida Regional Airport. The ACS is deployed throughout the terminal facilities and
support buildings, structures and access points within the airports lease hold on EAFB. This work will require the
procurement, installation, termination, configuration, testing, and commissioning of the new software, hardware, ASC
solution and all required hardware tinarades to siinnart the new ACS svstem
I. Project Cost:
Total Project Cost
Hl. Fund Participation:
Department:
Agency:
Total Project Cost
As Approved
$62,500.00
$62,500.00
As Approved
$50,000.00
$12,500.00
$62,500.00
As Amended
$100,000.00
$100,000.00
As Amended
$50,000.00
$50,000.00
$100,000.00
Net Change
$37,500.00
$37,500.00
Net Change
$0.00
$37,500.00
$0.00
$37,500.00
Comments:
