READ ALONGSIDE THE SOURCE

Fort Walton Beach — 2014- 7 - Holding Pond — reading text

Part 3 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 2014- 7 - Holding Pond.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

160 W. GOVERNMENT SIREET. SUITE 308 y PENSACOLA, FLORIDA 32502 - 5740 III. RS(] 1121, I. VIN1 ARD. W. SII(' RF I' AR)' Permittee /Authorized Entity, : Daniel J. Payne Ft. Walton Beach City Engineer 203 Hollywood Boulevard NW Ft. Walton Beach, Florida, 32548 dppayne a fwb.org Co- Applicant: Joy Swanson Y FDOT Permit Coordinator t 1074 Hwy 90 East Chipley, Florida 32428 0 Joy Swanson u.dot. state. fl. us Project Name: Offsite Lovejoy Pond Environmental Resource Permit State -owned Submerged Lands Authorization — Not Applicable U. S. Army Corps of Engineers Authorization — Separate Corps Authorization Required County: Okaloosa Offsite treatment associated with Walton County Permit 66- 0274274- 01 0- El) Permit No.: 66- 0274274- 011 - El Permit Issuance Date: March 3, 2014 Permit Construction Phase Expiration Date: March 3, 2019 Packet Pg. 267

Download this text file with its original spacing ↓