READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — 2013 meeting #1142 (date undetermined) — 1-4 Road — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 13-1-4 Road.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: TRANSPORTATION
DEPARTMENT/PROGRAM: ROADS
PROGRAM DESCRIPTION: The Roads Division of the Public Works Department provides to the public;
road construction and maintenance, stormwater maintenance and repair, resurfacing and asphalt millings base
stabilization, open graded hot mix road paving, bridge construction, and other infrastructure maintenance and
repair services. The Road Division also provides both rescue and recovery operations during disasters and other
emergencies which impact road and stormwater infrastructure.
REVENUE: Road Division is funded within the County Transportation Trust Fund. Supporting revenue of the
County Transportation Trust Fund is fuel taxes, local government half-cent sales tax, charges for services,
interest, other miscellaneous revenue and transfers from other funds.
EXPENDITURES:
Expenditures Budget
FY11 FY12 FY13 FY14
Category Actual $ Actual $ Original $ Approved $
Personal Services 4,361,911 4,048,721 4,407,686 4,537,102
Operating Expenses 2,492,164 2,635,497 1,762,294 1,889,769
Capital Outlay 13,986 135,111 3,200 0
Reserves 0 0 0 0
Total 6,868,061 6,819,329 6,173,180 6,426,871
HISTORICAL STAFFING SUMMARY:
Category FY11 FY12 FY13 FY14
Full-time 95 94 95 95
Part-Time 0 0 0 0
Relief 0 0 0 0
Total 95 94 95 95
MAJOR ACCOMPLISHMENTS LAST YEAR:
Maintained 670 miles of paved roads and 74 miles of cold mix base stabilized roads.
Graded 199 miles of dirt roads once per week.
Maintained 221 retention ponds.
Mowed 726 miles of right of way.
Completed 540 work orders from customer requests.
Placed 1,680 tons of milled asphalt on damaged dirt roads throughout the north and south county.
o Harding Road, Griffith Road, Aaron Baker Roads.
Accepted 6 new sub-divisions/roads into county maintenance program totaling 2.2 miles or roadway and 10
retention ponds.
Reviewed, issued, and inspected 225 right-of-way permits.
Converted Millside Road bridge from timber to steel/concrete.
PROGRAM GOAL:
The mission of the Okaloosa County Public Works Road Division is to provide transportation and infrastructure
services to residents and visitors of Okaloosa County. The goal is to accomplish this mission through its four
primary sections: North Road Maintenance, South Road Maintenance, Asphalt, and Bridge Sections.
KEY OBJECTIVES:
Maintenance:
1. To maintain all roads on the county-maintained list to a clean, safe, and passable condition.
2. To maintain all bridges and culverts on the county-maintained list to a clean, safe, and passable condition.
3. Grade and maintain all dirt roads on the county-maintained list once per week.
4. Maintain and repair paved roads, road edges, and safe zones.
5. Mow roadsides twice per growing season.
6. Maintain pavement markings on county roads. Restripe roads every 5 years.
7. Conduct herbicide operations on roadsides throughout the county.
8. Staff and equip a litter control crew (Inmate Crews).
9. Respond to work requests from the public in a timely and efficient manner.
Projects:
1. Complete Districts 1–5 road resurfacing program.
2. Rehabilitate cold mix roads.
3. Complete the road striping program.
4. Install and maintain guardrails at critical points in the county.
5. Repair critically eroded and worn stormwater structures affecting our roads.
6. Place asphalt millings on critically eroded roads in the county.
7. Continue paving dirt roads as feasible in the county.
PERFORMANCE MEASURES:
Actual Estimated Adopted
Performance Measures
FY11/12 FY12/13 FY13/14
Number of FTEs 94 95 95
Input
Salaries & Operating Expenditures $6.604.M $6.173M $6.372M
Capital Expenditures $0 $3,200 $1.033M
Number of Work Orders Completed 540** 478** 500**
Output
Miles of Roads Resurfaced 22.2*** 19.8*** 20.0***
ROW Permits Issued 540 225 400
Convert 20% of all required signage to new retro-
20% 20% 20%
reflectivity standards.
Efficiency
Grade/maintain 201 miles of dirt roads at least once per
90% 95% 95%
week.
Road Striping 41.7 Miles 24.7 Miles 25 Miles
Effectiveness
% of County Roads Paved/Base Stabilized 71.75**** 72.8**** 73.3****
*Bridge conversion funding has been shifted from Operating to Local Option Gas Tax funding.
**Stormwarer related workorders (~600) have been excluded from this figure this year.
***Includes roads addressed under pavement preservation program, not necessarily resurfaced.
****Numbers reflect corrected calculations based on currently available data.