Fort Walton Beach Council agenda — 11-14-06 (regular) — reading text
Part 19 of 52. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13252-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Camp Walton Village
homeowners. The CRA revised master site plan ( 6/ 19/ 03) approved by the City
Council indicated the view corridor requirement had been met by providing 89 ft., or 15
percent, by providing five ( 5) separate view corridors.
The Choctaw building permit site plan ( Exhibit C) did not depict the view corridors but
the notations on the plan indicated the provided cumulative view corridor was 17% or
100 feet, 11 ft in excess of the 89 ft. minimum requirement. The Choctaw site plan
was in substantial compliance with the CRA master site plan and appeared to meet
the view corridor requirement based on the notations. The buildings' (" A" through liE"
with " A" the southernmost building) positions were angled slightly differently and in
some cases the distance between the buildings was reduced during construction.
Due to this shift in Building liD" and liE", the minimum width of 15 ft. for a view corridor
could not be met. CDS staff does not know why this change occurred and the
change was not detected on the site plan by CDS staff since the notation was correct
and in fact showed an excess in the view corridor requirement when the foundation
permit was issued. The CDS staff discovered the problem with the view corridor on
September 26, 2006 and notified the owner that the issue had to be resolved.
On October 3, 2006, CDS staff received a view corridor special study site plan from
Choctaw Engineering ( Exhibit D) indicating the view corridor requirement can be met
if the space between Buildings " A" and liB" is counted towards the cumulative total, in
lieu of the space between Buildings liD" and liE". The " new" view corridor would
extend from Brooks Street to the Bay. The revised site plan indicates that a portion of
the view corridor would be located on the abutting property to the west.
Analvsis
The Land Development Code defines ' View Corridor" as follows: " A continuous
corridor extending from the street to the rear property line, and allowing views of the
water. The view corridor requirement is measured as a percentage of lot width;
required side yard setbacks may be included as part of the view corridor. View
corridors shall not overlap where two or more corridors are provided, and shall be
wholly contained on the subject property. No structures may encroach the view
corridor, but parking lots, accessways, pathways, and public boardwalks may be
located within a view corridor, provided they are located at the natural grade 'of the
property. Landscaping is permitted within the view corridor, provided that all trees
maintain six feet of clear trunk, and that shrubs and other vegetative ground covers
are maintained at less than three feet in height. Fences located within a view corridor
shall be no greater than 40 percent opaque."
The MUW- 12 view corridor regulations state: " Multifamily development shall provide
and maintain view corridors equal to 15 percent of the lot width. Multiple corridors
may be used to satisfy this requirement provided that no individual view corridor is
Page 2
less than 15 feet in width; the required side yard setbacks may be included as part of
the 15 percent lot width requirement."
Exhibit 0, the revised site plan prepared by Choctaw Engineering, Inc., depicts six (6)
view corridors totaling 100 linear feet, or 17% of the total lot width; however, the view
corridor between building " 0" and " E" does not meet the 15' minimum width, so it
cannot be utilized in the calculations. Therefore, only five ( 5) view corridors, including
both side yards, may be included in the view corridor calculations. The proposed
view corridor between Buildings " A" and " B" is one of the 5 view corridors. The five
view corridors total 91. 8' in width, or 15. 5% of the total lot width.
The view corridor definition states that".. . view corridors shall not overlap where two
or more corridors are The revised site plan depicts one view corridor that
intersects another view corridor.provided..."
While reviewing the view corridor issues brought
forth in this site plan, staff realized that the wording of the view corridor definition
should be revised to clarify the difference between intersect and overlap, because
the intent of the definition was not to prohibit intersecting view corridors.
The view corridor definition also states that view corridors ".. . shall be wholly
contained on the subject property." The revised site plan depicts one view corridor
that extends to Brooks Street through a small portion of land located on the abutting
property to the west.While reviewing the view corridor issues brought forth in this site
plan, staff realized that in a situation such as this, with sharply angled property lines,
it may benefit the traveler if a view corridor extended perpendicular to a street, rather
than parallel to a property line, and that might mean the use of property outside of the
subject property. Of course, the only way to guarantee that the portion of view
corridor located on the abutting property would perpetually retain the standards of a
view corridor would be for that portion of the view corridor to be constrained by an
easement. The abutting property owner would have to grant a " view corridor
easement" to the subject property, and the City would have to be a party to the
easement with enforcement authority.
Discussion
Based on the review of the site plan and the issues related to the view corridor
definition, staff intends to revise the view corridor definition as a part of the overall
LOC revision package as follows:
A continuous corridor extending from the street to the rear property line, and
allowing views of the water. The view corridor requirement is measured as a
percentage of lot width; required side yard setbacks may be included as part of the
view corridor. View corridors may intersect, but shall not where two or more
overlap,!
corridors are provided, and shall be wholly contained on the subject property unless
the abuttinq property owner qrants a perpetual easement, naminq the City as a party
with enforcement authority, that quarantees the maintenance of a view corridor that
meets all requirements." [ the rest of the definition does not need revision]
Page 3
Recommendation
Note: This recommendation is based upon the site plan approved by the City
Council June 24, 2003, the amendment approved by the City Council developed by
Choctaw Engineering, Inc., dated October 19, 2006 ( project # 2003- 100).
The CRA Board of Commissioners recommended approval of the amended site plan
with conditions ( 6- 0, one member absent). Staff recommends that City Council
approve the issuance of a CRA Site Plan Development Order that includes the
conditions specified in the draft Development Order ( Exhibit E).
Attachments
Exhibit A: Letter from owner/applicant.
Exhibit B: CRA Master revised site plan, date 6/ 19/ 03 by BVM
Architects, (03- 02- RD)
Exhibit C: Choctaw Engineering, Inc., permit site plan, ( p. 3 of 10 - June
30, 2004)
Exhibit D: Choctaw Engineering, Inc., revised site plan special study
survey - view corridors -( dated 10/ 19/ 06)
Exhibit E: Draft Development Order
Page 4
BOARD OF COMMISSIONERS OF THE FORT WALTON BEACH
COMMUNITY REDEVELOPMENT AGENCY
NOVEMBER 1, 2006
INTRODUCTION
regular Meeting of the Board of Commissioners of the Fort Walton Beach Community Red opment
Ag was held on Wednesday, November 1, 2006, at 5: 30 p. m. at the Council Cha rs of City Hall
with the wing members present:
irman; Lee Bobo; Dean Covey; Chuck Kennedy:'
er, CDS Planner II; Malcolm Foley, Planning
CALL TO ORDER
The Chairman called the meeting to
APPROVAL OF MINUTES
Mr. Bobo moved to appr e the minutes of the regular CRA meeting of Octo 4, 2006. Mr. Covey
seconded motion a It carried unanimously with Bobo, Covey, Gossom, Kenne
Thrush in favor arvie absent).
Mr. Kenn y moved to approve the minutes of the CRA Workshop of October 18, 2006. Mr .
Thru seconded motion and it carried unanimously with Bobo, Covey, Gossom, Kennedy,
zek, and Thrush in favor (Garvie absent).
AMENDMENT TO SITE PLAN - VILLA DI MARE CONDOMINIUM
Consideration of approval of amendment to site plan for the Villa di Mare Condominium, located at 248
Brooks Street SE.
OATH
The City Attorney swore in those who planned to testify.
Gary McMichael, MTM Partners LLC, owner of the Villa di Mare Condominium, stated this project has
been a long process but it will be completed soon. He advised an error was found by the civil engineers
in the way the view corridors were calculated with respect to the layout of the buildings, and after meeting
with Staff a solution has been agreed to. Mr. McMichael informed the request is for the purpose of
determining how to recalculate the dimension of the view corridors for the project.
Peggy Fowler, Planner, requested the Staff Report be entered into the record with a change deleting Item
1 of Staff' s recommendation which states, "The CRA Board of Commissioners request the City Council to
direct Staff to amend the land development code to include the revised language." Ms. Fowler explained
the language as it is can be interpreted as such and can be clarified later in the Land Development Code.
Mr. McMichael agreed to the change. As there were no objections, the Staff Report was entered into the
record.
Peggy Fowler explained that during construction, the buildings positions v<
vere angled slightly differently
and in some cases, the distance between the buildings was reduced, thus the view corridor could not be
met. Staff reviewed a view corridor special study site plan indicating the view corridor requirement can be
met if an additional view corridor is allowed between buildings " A" and " B."
The Chairman asked for public input.
CRA 11- 01- 06
VILLA DI MARE ( CONT)
Kabe Woods, future resident of Villa di Mare, asked the Board to rule in a
positive way for the request.
The City Attorney received clarification from Ms. Fowler that through the discussion and recommendations
made to the Board, that approval of this project is consistent with the Comprehensive Plan and that it
furthers the intention of the zoning district to have view corridors.
The City Attorney swore in Bob Seretta, President of Camp Walton Village Condominium Association,
adjacent property owner, who advised that the Camp Walton Board of Directors has agreed to a view
corridor easement to the subject property, with the City a party to the easement enforcement authority.
Mr. Seretta advised there are some things in the original perpetual easement that was granted for this
area which allowed Villa di Mare to put a portion of their
driveway on property previously owned by Camp
Walton Village. Mr. Seretta advised there are some stipulations the Camp Walton Association would like
the Villa de Mare developer to abide by, such as putting sod or low ground cover in a vacant area, and
having the seawall taken to the end of the property line.
Mr. Bobo received clarification from Staff that the easement has to be executed and approved by the