Okaloosa County BOCC — June 21, 2016 — Amendment 1 to Exhibit A — reading text
Part 5 of 6. These parts divide the reading text for browsing; they are not the source document's page numbers.
Amendment 1 to Exhibit A — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
operate all necessary functions self-sufficiently without requiring connections to
remote networks to control, monitor, and operate the plant. (Note: The system
running at the main OCWS office is considered the primary control system network as this
facility provides the central control system catalog (Wonderware Galaxy) and all of the
archived control system files that are actively backed up on the system data back-up
appliance.).
8.1.3 The control system shall also be configured as a secondary/redundant control
network that shall allow the Wonderware SCADA application to be monitored and
control in the loss of a network connection from the main OCWS office. Therefore,
the Arbennie system shall be configured to run not only the Wonderware objects
and software required for the local plant, but shall include all objects required to
view the main SCADA application and Bob Sikes WWTP as well.
8.1.4 Design new Wonderware Archestra graphics to update all of the graphics associated
with the Arbennie WWTP. This shall include existing and proposed equipment and
unit processes. In addition, the graphics shall be Archestra graphics that shall be
stored and cataloged in the new consolidated OCWS Galaxy.
8.1.5 Prepare SCADA system operation support documentation and associated “how to”
instructional booklets for logic and graphical development of adding additional
hardware and monitoring into the CLIENT system. All system support
documentation shall be cataloged and stored on the primary control system network
and links shall be provided such that user can easily access the standard documents
8.1.6 Design upgrades to the existing PMCS hardware and software systems to replace
the 2007 equipment with new equipment. This process shall commence by
performing a plant wide evaluation of the existing systems to determine the current
state of the PMCS hardware and software. The existing servers and workstations at
the facility shall be replaced with a virtual system architecture that shall be
provided, configured and installed to allow virtual servers to run the local
15
AMENDMENT 01 TO EXHIBIT A─ OKALOOSA COUNTY WATER AND SEWER SYSTEM ARBENNIE PRITCHETT WRF 5 MGD EXPANSION
PROJECT MANAGEMENT & DESIGN CRITERIA PROFESSIONAL SERVICES
Wonderware system functions (object servers, data access objects app engines, view
engines, etc.) and provide virtual workstation sessions that are configured to be
accessed by hardware thin clients or desktops that function to provide the local
interface to the graphical Wonderware system. In addition, all PLC hardware shall
be evaluated to determine if the devices should be replaced or upgraded during the
project. In the event that the hardware is not replaced the hardware operating
system or firmware shall be updated to the latest stable version such that all
equipment is operating on the same platform.
8.1.7 Design improvements to integrate and consolidate the CLIENT’s Wonderware
distribution and collection system SCADA and the PMCS for the Arbennie Pritchett
WRF, Russell Stephenson WRF and the Bob Sikes WRF. This shall include
consolidating all the Wonderware systems in the central virtual system that is
housed at the OCWS central office. In addition, local servers shall be installed at
each facility for the sole purpose of running the local instances of the object servers,
app engines, view engines, and other Wondeware components required for system
functionality. All of these objects shall be deployed and managed from the central
repository installed at the main OCWS Office.
8.1.8 Design and incorporate a Wonderware based solution to allow enterprise and
mobile users to access control system applications, reports, and custom dashboards.
The intent is to provide a cohesive Wonderware based solution that will enable
CLIENT and other authorized personnel to access the information and data from the
Wonderware distribution and collection system SCADA and the PMCS for the
Arbennie Pritchett WRF, Russell Stephenson WRF and the Bob Sikes WRF using
multiple access sources and devices (smart phones, tablets, laptops and other
computers) that are not directly associated with the CLIENT’s network. Security
will be built into the system to limit control functions as well as access by
unauthorized persons.
8.1.9 Design improvements to integrate and consolidate the CLIENT’s asset management
and supporting software systems from the Arbennie Pritchett WRF to the virtual
server system installed at the central OCWS. These supporting systems shall be
migrated to the OCWS central office and shall be upgraded to the latest available
stable versions, and shall be included in the OCWS back-up and archival scheme.
Access to the supporting software applications shall be executed through local thin
clients that operate RDP sessions to connect to the centrally installed applications.
8.1.10 Evaluation and design of the Server Room infrastructure improvements at Arbennie
Pritchett WWTP and the Bob Sikes WWTP. Through preliminary evaluation at each
of these facilities, it has been noted that there are major concerns with the areas in
which the critical computer and network infrastructure is housed. Below is a
summary of the key issues that were determined at each site:
8.1.10.1 At Bob Sikes the existing server rack is installed in a common area that lacks
environmental conditioning as well as appropriate physical security measures to
mitigate undesired physical access to the server and network equipment. The
suggested method to resolve this issue would be to relocate the server and network
equipment to a secure room at the facility and upgrade this location with the proper
16
AMENDMENT 01 TO EXHIBIT A─ OKALOOSA COUNTY WATER AND SEWER SYSTEM ARBENNIE PRITCHETT WRF 5 MGD EXPANSION
PROJECT MANAGEMENT & DESIGN CRITERIA PROFESSIONAL SERVICES
environmental conditioning equipment to maintain the interior conditions within
the optimum operating range for the installed equipment.
8.1.10.2 At the Arbennie Pritchett WWTP there have been instances where the server
room has experienced leaks in the roof above the server racks housing the critical
system components. The areas above the equipment shall be examined thoroughly
and any discovered issues shall be corrected. In addition, if it is determined that the
equipment has been installed under a roof penetration required for roof mounted
equipment, then the server equipment shall be relocated to an area that is not
directly under an area that may leak again in the future.
8.1.11 Evaluate and migrate the Preventative Maintenance and Asset Management systems
currently installed at Arbennie to the BCC network and virtual infrastructure. The
intent would be to move these applications for data security and disaster recovery
purposes. In order to provide SCADA system data between the SCADA and BCC
network the PCMS shall be configured with a secure data tunnel between the two
systems along with a database container installed on the BCC network to allow asset
information to be harvested and displayed on the BCC network. In addition, the
two management applications (Maximo and Hach WIMS) should be evaluated for
current utilization and it should be determined if these applications should be
utilized in the future, or should these functions be moved to the currently owner
Sunguard Technology solution.
8.1.12 All hardware and software costs associated with the I&C Design shall be paid for by
the CLIENT and may be supplied by either the CLIENT or the D/B Team, as
directed by the CLIENT.
Work Task 9. Septage Receiving /FOG System Expansion
These modifications are required to construct a new septage receiving facility to allow the
COUNTY to begin receiving residential and commercial septage tank / grease trap waste
on a daily basis from permitted waste haulers.
The new system will be designed to handle flows at a rate of 700 GPM (pressurized flow).
The basis of design shall be around a rotating drum screen with the washer compactor,
grease removal system (including skimmer, grease collection chamber, and grease transfer)
and rock trap. The project will also include a new paved access and in ground weigh
station; storage holding tanks, effluent pumping station with diverter valves to allow flows
to be discharged back to the APWRF headworks or digester; piping for wash-down water;
a new metal framed canopy cover with lighting. In addition, the facility shall include a
NEMA 4x local control panel equipped with Allen Bradley CompacLogix plc and panel
view 12’ touch screen and hauler access station and management software.
The amended scope includes providing engineering services to prepare drawings for
construction of the modifications by the COUNTY’s Contractor; specifications for
equipment procurement; construction services for the construction work related to the
PROJECT.
Specific services to be performed under this Work Task that may be authorized by the
COUNTY’s representative are presented below.
17
AMENDMENT 01 TO EXHIBIT A─ OKALOOSA COUNTY WATER AND SEWER SYSTEM ARBENNIE PRITCHETT WRF 5 MGD EXPANSION
PROJECT MANAGEMENT & DESIGN CRITERIA PROFESSIONAL SERVICES
9.1 Meetings
9.1.1 CONSULTANT shall attend meetings as may be reasonably necessary, and as
requested by the COUNTY, and provide general engineering assistance,
consultation, and opinions regarding the PROJECT.
9.2 Design Services
9.2.1 The proposed design shall include locating the new septage receiving facility
adjacent to the existing drying bed facility, located on the western side of the
APWRF. The CONSULTANT shall design a new concrete paved roadway to allow
haulers to enter and exit the septage receiving facility. The design will allow for
vehicular stacking and imbedded truck scales, as well as access to the solids
discharge containers.
9.2.2 Design piping, valves, equipment or other appurtenances necessary for a new 700
GPM 316 SS skid mounted septage receiving station and debris bagging system and
shall include a SS external rock trap with storage capacity.
9.2.3 The unit will be installed on a reinforced concrete pad with grated floor drains and
piping back to the existing APWRF gravity collection system. The unit will have a
single 4” connection point equipped with flex hose male end adapter. A new reuse
water connection capable of producing a minimum 50 gpm @ 75 PSI will be
provided for facility cleaning and equipment spray nozzles. Solid discharge
containers will be positioned to allow for separate access and empting. I&C
instruments shall be controlled locally and also integrated into the