READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — March 15, 2016 — PR--BLFTaskOrder10 — reading text

Part 1 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.

PR--BLFTaskOrder10 — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

TASK ORDER APPROVAL FORM CONTRACT#: ~C::;,_;.1---'-4-=-2=-=-08=-1.:...._-.:...._PW'-'------- TASK ORDER # : ----=-/_0_ _ _ _ _ _ __ TASK ORDER AMOUNT: $-----..:...7-=8~0=:00::::__ _ _ _ _ _ __ OFFERED BY CONSULT ANT: Preble-Rish, Inc. FIRM'S NAME SIGNA Vice President 2-17-16 TITLE DATE RECOMMENDED FOR APPROVAL APPROVED BY OKALOOSA COUNTY ( Department Director) ( Per Purchasing Manual) • $25,000 or less approved by Purchasing Director • Between $25,001 and $50,000 approved by Purchasing Director and County Administrator • In excess of $50,000 approved by the Board. Jason Autre Zan Fedorak SIGNATURE PURCHASING Public Works Director TITLE DATE DATE John Hofstad COUNTY ADMI CHAIRMAN (if applicable) DATE DATE • ut.Tt!I.G E!'.(.INI:IJlS 1¥ Ult\'E\ R- VIA E-MAIL (shenson@co.okaloosa.fl.us) February 12, 2016 Proposal No. 206.000 Mr. Scott Henson Okaloosa County Public Works Department Environmental Services Division 1759 South Ferdon Blvd Crestview, FL 32536 Subject: Proposal to Perform 2016 Semi-Annual Compliance and Remedial Action Plan Modification Sampling and Reporting for the Baker Landfill Dear Scott: Preble-Rish is pleased to provide Okaloosa County, Public Works Department, Environmental Services Division (County) with this proposal to perform the 2016 semi-annual compliance and remedial action sampling and reporting for the Baker Landfill. This proposal includes services to continue ongoing semi-annual and annual compliance and assessment monitoring and reporting in accordance with the 2008 RAPMOD - 2011 Addendum (RAPMOD), dated August 1, 2011, and approved by the Florida Department of Environmental Protection (FDEP) on December 7, 2011. This proposal provides scope of services, estimated fee, and schedule to perform the semi-annual compliance and RAPMOD sampling reporting. SCOPE OF SERVICES In accordance with the closure permit for Baker Landfill, Permit No. 0075982-004-SF and the RAPMOD approved by FDEP on December 7, 2011, semi-annual reports for compliance and remedial action sampling are due by May 1 and November 1 of each year. Preble-Rish will sub- contract local sampling firm, RDH Environmental for collection of samples and utilize TestAmerica Laboratories for laboratory analysis. In addition to the standard water quality sampling, analysis and reporting, Preble-Rish provides local resources, available to respond and assist the County on a wide variety of issues. Preble-Rish proposes to continue monthly site inspections to assist the County in continuing to maintain the landfill operations in accordance with County and FDEP standards. Preble-Rish will document and maintain a log of inspection findings and will provide the information electronically to the County. Details of the scope of services are summarized in the following tasks. 90 Beal Parkway NW, Suite C, Fort Walton Beach, FL 32548 Santa Rosa Beach I Panama City I Port St. Joe I Blountstown I Ft. Walton Beach I Freeport I Quincy I Crawfordville Tallahassee I Pensacola I Lake City I Daphne I Mississippi I Haiti TASKS 1 & 2- SPRING & FALL 2016 SAMPLING AND REPORTING The following describes the proposed semi-annual sampling events for 2016 which will include field sampling activities, water quality analyses, and reporting of findings. Task 1 will be for the spring event and Task 2 will be for the fall event. The following will be performed for each event. WATER QUALITY SAMPLING Water quality sampling will include the collection of groundwater samples, and when available, collection of surface water and seep samples. Groundwater sample collection will be performed for compliance and RAPMOD requirements. Field work, sampling methodologies, data evaluation, and data Quality Assurance/Quality Control (QA/QC) will be performed in accordance with Chapter 62- 160, FAC, Standard Operating Procedures (DEP-SOP-001/01) (SOPs) and the closure permit. Preble-Rish will perform compliance sampling to meet the requirements listed within the closure permit and the remedial action sampling requirements listed in Table 2 of the RAPMOD. Semi- annual sampling will generally be performed during February and August, with the August event including annual sampling of the private Shue Well. As required by Chapter 62-701.510(9) (a), Preble-Rish will electronically notify the FDEP within 14 days prior to each scheduled sampling event. Preble-Rish will also coordinate sampling internally and with the County, and also with TestAmerica to confirm sample bottles have been ordered and delivered and sampling is on-schedule. Water level measurements will be collected from each monitoring well across the site prior to sample collection. During purging procedures, indicator parameters will be measured and recorded in the FDEP water sampling logs in accordance with the current FDEP SOPs and permit requirements. For Quality Assurance/Quality Control (QA/QC) purposes, Preble-Rish will collect the appropriate number of equipment blanks and duplicate samples in accordance with the FDEP SOPs. Prior to the initiation of sample collection, field instruments will be calibrated according to factory instructions. Instrument calibrations will be documented on a field log and submitted to the County with the field sampling logs and laboratory analytical results. Static water levels in each required well will be obtained on the same day using an electronic water level indicator to the nearest 0.01 foot. During the collection of the static groundwater elevations, each monitoring well will be visually inspected. If any problems with the monitoring well are observed, Preble-Rish will immediately notify the County of the problem. Low-flow groundwater purging, and sample collection procedures will be followed in the field using a portable pneumatic bladder pump or similar device, where dedicated pumps are not present. For recovery wells, samples will be collected from the recovery pumps via sampling ports on the submersible pump drop-pipes. When recovery wells are not operating, samples will be collected from the annular monitoring wells. FDEP SOPs will be followed during all sampling activities. Sampling equipment will be decontaminated prior to all phases of purging and sample collection to reduce the potential for cross contamination between sample locations. Required Quality Assurance/Quality Control samples will be collected including duplicates, equipment blanks, and trip blanks. The August event will include the semi-annual sampling locations included in the February event with the addition of the private Shue well. During the purging and sampling operations, the groundwater will be monitored for pH, dissolved oxygen, specific conductance, temperature, turbidity, oxidation reduction potential (ORP), colors, odors, and sheens (by observation), and ferrous iron for monitoring wells which have been selected for Monitoring Natural Attenuation (MNA). Monitoring of these parameters will provide an indication of stabilization of the groundwater quality prior to sample collection. These parameters will be recorded on the sampling log. Once the indicator values are stabilized and a sufficient volume purged from the well, sample collection will begin. After sample collection, the samples will be prepared, preserved as necessary, and shipped to TestAmerica using industry standard chain-of-custody procedures. LABORATORY ANALYSIS & REVIEW Water quality analyses will be performed by TestAmerica in accordance with Chapter 62-160, FAC DEP-SOP-001/01 and the closure permit. TestAmerica is certified by the Florida Department of Health Environmental Laboratory Certification Program (DoH ELCP). TestAmerica will perform analyses as listed within the Okaloosa County compliance permit and RAPMOD in standard turn- around times (approximately two calendar weeks) and provide an electronic report and data package deliverable to Preble-Rish. A Level II quality control data package will be included within the laboratory report for each sampling event. Upon receipt of the laboratory report and data package, Preble-Rish will perform a quality assurance/quality control (QA/QC) review. REPORTING Preble-Rish will review the analytical data, and prepare tables, figures, and a written report for each semi-annual event conducted during 2016. The reports will include a section on results of compliance monitoring and results of remedial action monitoring. Preble-Rish will also include a section in the reports addressing the operation and maintenance of the monitoring and remediation system at Baker. In accordance with the RAPMOD, reports will include a discussion of the effectiveness of monitored natural attenuation. Conclusions and recommendations will be provided in each report regarding monitoring location compliance and the effectiveness of the remediation system. Task 3- MONTHLY LANDFILL INSPECTIONS Preble-Rish will continue to perform monthly landfill inspections in an effort to assist the county with maintaining landfill operations in accordance with County and FDEP standards. Monthly landfill inspection data will be collected on a site specific field form and logged into an excel database on a monthly basis. Any significant issues identified will be reported to the County immediately. DELIVERABLES The report for each sampling event will be submitted to the County in draft format. The draft report will include a complete electronic copy of the report in pdf format with a separate copy of the text in .doc format for tracked-changes review revisions and comments by the County. Preble- Rish will make appropriate revisions to the draft report based on County input and prepare the final version for submission to the FDEP by the May 1 and November 1 deadlines. The final deliverables to the County following each of the two sampling events will include the following: • One compact disc (CD) containing the following files: Semi-annual compliance & assessment water quality report Water level measurement sheets, calibration records, and field sampling logs. Laboratory analytical reports Parameter monitoring reports in ADaPT format. Preble-Rish will submit an electronic file on compact disk and hard copy of each report on behalf of the County to the Northwest District and Tallahassee office of FDEP. The compact disk will contain the files as listed above. PROFESSIONAL FEES AND INVOICING Preble-Rish will conduct this work for a Lump Sum of $78,000 for semi-annual groundwater and surface water monitoring and reporting based on the number of monitoring points and the specific permit required parameter list. Invoices will be prepared monthly on a percent complete basis. The fee estimate provided

Download this text file with its original spacing ↓