READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — October 2, 2012 — Exhibit 1 — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 31-Exhibit 1.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

EXHIBIT a aes Lem - LAND DEVELOPMENT CODE Chapter 1A Code Administration 14.02.11: Permits from Other Agencies: In addition to obtaining a development order or permit from the County, an applicant must also obtain all other applicable permits or exemptions as may be required by law. In the event a development order or permit from the County is prerequisite to obtaining another required permit(s), or at the request of the applicant, the Planning Official may issue a “Statement of Intent” which states that the proposed development is conceptually in compliance with this Code. and-that issuance of-a final development order or permitis ditioned-upon-the applicant- obtaining all oth. iced. its The applicant must provide ia PPI gs ¢ P g PP proofte the County that all_ permits or exemptions h: been-granted pricr- te obtaini final P P PI ig For any development order or permit application filed with the county after July 1, 2012, the County may not require as a condition of processing or issuing a development order or permit that an applicant obtain a permit or approval from any state or federal agency unless the agency has issued a final agency action that denies the federal or state permit before the County action on the local development order or permit. Issuance of a development order or permit by the County does not in any way create any rights on the part of the applicant to obtain a permit from a state or federal agency and does not create any liability on the part of the County for issuance if the applicant fails to obtain requisite approvals or fulfill the obligations imposed by a state or federal agency or undertakes actions that result in a violation of state or federal law. The County may attach such a disclaimer to the issuance of a development_order or permit and may include a condition that all other applicable state or federal permits be obtained before commencement of the development. Other required permits may include, but not be limited to, the following. 1. Northwest Florida Water Management District for water wells, impoundments, storage of surface waters, environmental resource permits. 2. Okaloosa County Health Department for septic tanks. 3. Florida Department of Environmental Protection for stormwater management; wetland resources; dredge and fill; wastewater collection, transmission, and treatment; drinking water supply and distribution; coastal construction, etc. 4. U.S. Army Corps of Engineers for dredge and fill; works in waters of the United States (docks, boathouses, marinas, etc.); navigable waterways, etc. 5. Florida Department of Transportation for improvements on the State Highway System; driveway access connections onto state roads; drainage connections into a state drainage system, etc. . 6. Federal Aviation Administration for verification of structural or building heights relative to aircraft hazard and safety. The preceding list represents the more commonly required permits but is in no way intended to be all-inclusive of every permit that may be required. It is incumbent upon an applicant to perform due-diligence to obtain any permits, licenses, exemptions, etc. that may be required for any particular development activity. 1A.02.12 Revocation: The Planning Official may revoke an approved development order or permit approval if and when it is discovered that an applicant knowingly and willingly misrepresented material facts and information upon which the County relied to issue such approvai(s). 1A.03.00 DEVELOPMENT REVIEW. 1A.03.01 Purpose and Intent: The purpose of this Section is to provide a standardized and uniform system for the review of applications for development order or permit approval. This 1A-7

Download this text file with its original spacing ↓