Fort Walton Beach Council minutes — 04-25-06 regular minutes — reading text
Part 3 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-10111-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
connecting the existing manholes north and
south ofthe existing Baskin Robbins. The size and inverts ofthis main shall be verified
prior to construction. The plans show an upstream invert of 10. 16' and a downstream
invert of 10. 17'.
14. The proposed 6" sanitary sewer service lateral shows a slope of 0. 45%. Based on
engineering standards, the minimum slope for a 6" pipe is 0.49%. The material of the
proposed sewer service lateral shall be shown on the plans.
15. The construction plans shall Include a detail sheet
depicting the proposed connection to
the sanitary sewer manhole, Installation of the water and sewer service mains, and
installation of the proposed grease trap.
Inspection Comments:
1. Four complete sets of plans shall be submitted
including site survey.
2. Submit a soil analysis.
3. Title page including occupant load.
i:"::~:= ::~:
V::~
tranSltiOn on sidewalks.
6. Show backflow
water ops at 833- 9630
preventorp- ut on notes that backflow will be tested
by AI Jordan of our ! , i~'
f".'........... .:
7. Submit energy forms
8. Plans shall be approved by the hotel and restaurant commission prior to submission for
permitting review.
9. Show termite treatment procedure.
10. Engineer shall perform hurricane connector inspection and send letter of
approval to this
office.
191
Regular Council Meeting 4/25/ 06
SITE PLAN APPROVAL-STARBUCKS ( CONn
11. Architect shall submit final letter of approval for building construction.
12. An as- built survey shall be submitted after slab inspection.
13. A compaction test shall be submitted.
14. Show bonding of all water, gas, steel in foundation.
15. Street number shall be installed by final inspection.
I""'" 16. Water heater shall have a switched disconnect.
17. Mechanical units shall be physically secured.
EnaineerinQ Division Comments:
1. The address for this project will be 95 Eglin Parkway NE.
2. Stormwater management plan must meet the City' s stormwater regulations (Article VII of
the Land Development Code). Stormwater runoff from the entire site must be treated,
including runoff from the driveways.
3. Notice of approval from FDEP for the stormwater management plan must be provided
prior to the City' s approval for a building permit.
4. Must meet FDEP environmental regulations and FDOT standards for sediment and soil
erosion control.
5. Will need a utility easement for the storm drain.
Fire Inspection Comments:
1. Install key box.
2. Address numerals shall be a minimum of six inches on the building.
2) Prior to granting a Certificate of Occupancy:
a. The applicant will provide documentation of easements that allow for continued vehicular
access in perpetuity through the property from the Uptown Station Shopping Center.
Mr. Patterson seconded motion and it carried unanimously with Holmes, Patterson, Campbell,
Tucker, Pullen, and Minich in favor (Hartwell absent).
SITE PLAN APPROVAL- ALCONESE TERRACE. 107/ 109 BROOKS STREET SE
Consideration of a request by applicant AI Rogerson, on behalf of owner Sawdog, LLC for site plan
approval of Alconese Terrace, consisting of the construction of two buildings to include 21
residential/resort condominiums with 3, 000 SF of office space, to be built in two phases located at 107/ 109
Brooks Street SE. Building A, to be built in Phase I is located closer to the Santa Rosa Sound, is a five-
story building with ten ( 10) permanent residential condominium units. Building B, to be built in Phase II
and is located closer to Brooks Street, is a four-story building with approximately 3, 000 SF of office space
on the first floor and eleven resort condominium units on the second to fourth floors.
The City Attorney announced a quasi-judicial proceeding and swore in those who planned to testify.
Ms. Fowler advised a letter was received from the applicant's attorney, John Dowd, requesting site plan
approvalfor only Phase I of this project. A revised memo from Staff has been submitted that takes this
request into account.
Ms. Fowler explained that Phase I entails the construction of Building A along Santa Rosa Sound, and the
I""'"
Duggan Cottage will remain intact during this phase. She informed that Council' s packet identifies Phase I
and Phase II as the items that were submitted to the CRA Board at their April 5, 2006 meeting, and that
the CRA Board considered both phases as an entire project. Ms. Fowler reported the CRA recommended
denialby a vote of 5- 2, with the main reason relating to the Phase II development and the status of the
Duggan Cottage during that phase.
Ms. Fowler clarified that if the applicant moves forward with Phase II, they would have to retum to the CRA
and to Council for approval of that phase, and the project would have to meet all the requirements of the
Comprehensive Plan, the LDC, and the Urban Master Plan that would be in effect at that time.
192
Regular Council Meeting 4/25/ 06
SITE PLAN- ALCON ESE TERRACE ( CONTI
In the revised staff recommendation, Ms. Fowler informed that Staff
supports approval of Phase I of the
site plan. She discussed each condition including the
changing name of the project; the applicant granting
a 10- foot boardwalk easement Santa Rosa
along Sound to the City; revising the site plan to show only
Phase 1 demolition and construction activities; coordination with the
City to revise the entrance drive to
include a landscaped buffer between the drive and existing
Duggan Cottage and to provide on- site parking
space adjacent to the Duggan cottage; address solid waste disposal for Phase I; meeting all requirements
regarding archaeological mitigation and landscape plans; and that the condo documents and all
easements be reviewed by the City Attorney.
Ms. Fowler further informed that based on discussion with Mr. Dowd, Staff believes
everyone is in
agreement with the conditions of approval and as such, the Staff report, including the letter from Mr. Dowd
and the revised Staff Memorandum dated April 25, 2006, were entered into the record.
Council discussion ensued as to whether or not the project should be returned to the CRA as
separate
requests, since their denial was based on Phase II of the project. Ms. Fowler advised that at the CRA
meeting, copies of Phase I and Phase II were distributed, and the staff report discussed Phase I and II.
She informed the applicant wanted it as one development but it has always been discussed and
presented
in the two phases. Ms. Fowler advised that In Staff's opinion, sufficient information was
given for each
phase and that all comments from the CRA Board relating to Phase II are contained in the record and staff
report, along with drawings of both phases.
Further discussion included the condition to change the name of the project to
something other than
Alconese Terrace. Ms. Fowler advised that for 911 and other safety issues, the name could be
confusing
if there was a misunderstanding in communication and
emergency services were sent to Alconese Avenue
rather than Brooks Street, where the project is planned. She advised the applicant has
agreed to change
the name of the project.
John Dowd, attorney representing the applicant, advised the applicant agrees with the recommendations
of Staff for approval of Phase I. However, he informed that at the CRA
meeting, positive
comments were
directed at Phase I; it was Phase" that was the concern. Mr. Dowd commented that the developers have
worked to create a project the City would be proud of, and have complied with
every requirement or
recommendation that the City has asked for. He stated the name change was agreed to at the CRA
meeting due to the fact that so many conditions rested on approval of the project, and that in reality, they
would like the name to remain Alconese Terrace. Mr. Dowd informed that pre-
marketing has been done
using that name, and the name was chosen because of the local historical significance.
Council asked Mr. Dowd if his clients agreed with Staff's recommendations as presented in the Revised
Staff Report. Mr. Dowd responded they agreed to
everything except the of the name of the
changing
project.
Dr. Pullen moved to deny the site plan for Alconese Terrace. Motion died for lack of a second.
Mr. Tucker stated he favors approval of the project with the deletion of condition 1 a, which is to
change the
name of the project to something other than Alconese Terrace.