READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 02-09-2010 Regular — reading text
Part 17 of 64. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-25143-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
fulfilling other goals of the American Recovery and Reinvestment Act of 2009, including
job creation.
1. 1. 2 All states, cities with a population of at least 35, 000, and counties with a population of at
least 200,000 were automatically entitled to monies from this program through formula
grants earlier this year.
1. 2 The City of Fort Walton Beach is eligible to receive funds from an $ 18. 6 million competitive
sub -grant program from the State of Florida. The application is due February 12, 2010. If
awarded, the City has twelve ( 12) months to expend ARRA funds.
2. DISCUSSION:
2. 1 This grant announcement presents an opportunity to implement an important component of the
City' s adopted Economic Development Element of the Comprehensive Plan while realizing
significant energy and cost savings.
3. FINANCIAL INFORMATION:
3. 1 The City is requesting $ 881, 100 in EECBG grant funds to retrofit street lights and gym lights
with new LED lights and obtain the Florida Green Government designation. The City proposes
to provide in -kind match contributions via project administration and labor to install the lights.
The project administration will account for $ 88, 110, or 10 %, of the requested grant amount. The
installation labor will account for $ 17, 480, or 2 %, of the requested grant amount. Gulf Power
35-
will also assist with the installation labor in -kind contribution. No cash match is required or
proposed.
3. 1. 1 Street lighting for approximately 30 %, or $ 325, 000, of the City' s annual
accounts
electricity usage of $ 1, 200, 000 per fiscal year. If implemented, this project will save the
City an estimated $ 28, 000 per year in energy and maintenance costs for the lifetime of the
LED units, which is approximately 20 -30 years. This is ten times longer than the lifetime of
traditional street lights.
3. 1. 2 Indoor gymnasium lighting at all three City recreational centers is also outdated and in
need of replacement. Replacing the gymnasium lighting with more energy efficient lighting
is expected to save approximately $ 10, 000 per year in electricity costs.
3. 1. 3 The City will contribute approximately 540 labor hours valued at approximately $ 6, 480, to
install the new gymnasium lights and provide administrative time.
3. 1. 4 The total positive financial impact to the City for this project is a savings of approximately
38, 000 per year in operating costs.
4. RECOMMENDATION:
4. 1 Staff respectfully requests City Council authorization to transmit the grant application to the
Florida Energy and Climate Commission for consideration.
5. SIGNATURE BLOCK:
5. 1 Submitted By: V4O-
A
Estelle Jones, flaAer II
5. 2 Reviewed and Concur:
amantha D. Abell, Planning Manager
5
5. 3 Reviewed and Concur:
Michael D. Beedie, P.E., City Engineer
5. 4 Reviewed and Concur: N 2
Br dy unker, Financial Services Director
5. 5 Reviewed for Agenda:
bert T. Mearns, City Manager
36-
Al GRANT ASSISTANCE PURSUANT
TO THE FLORIDA
ENERGY EFFICIENCY &
CONSERVATION SUBGRANTS
A. PROJECT INFORMATION
Title: Municipal Energy Efficient Street Light Retrofit
Project Location: Fort Walton Beach, FL
Are there multiple partners? If 1
2 Grant Application Category:
so, state how marix, artners.
D APPLICANT
Contact Name: Stella Jones, Planner II
Organization: City of Fort Walton Beach
Address Line 1: P O Box 4009
Address Line 2:
Fort Walton Beach State: FL Zip: 32549
City:
Email: ejones @fwb.org
Phone: ( 850) 833 -9697 Fax: ( 850) 833 -9926
PARTNERING ,..
Contact: Scotty Hutto
Organization: Gulf Power Co.
Address Line 1: 1 Energy Place
Address Line 2:
Pensacola State: FL Zip: 32520
City:
Email: SMHUTTO @southernco.com
Phone: 850) 444 -6020 1 Fax: 850) 444 -6237
Include additional partners as an addendum.
REQUIRED REGISTRATION INFORMATION
Legal Name of Lead Applicant: City of Fort Walton Beach
FEID No: F596000323
DUNS No: 079455101 -0000
CCR Expiration Date: 03/ 03/2010
MFMP Status: Non -State Term Contract
FUNDING REQUEST AND COST .-
1. Total Amount of Grant Funds Requested: $ 881, 100
105, 580
2. Total Matching Funds ( Provided by applicant and project partners):
3. Total Project Cost (Add amounts in 1 and 2): 986,680
4. Match Percentage ( Divide amount in 2 by amount in 3): 11%
JOBS CREATED/ RETAINED
1. Total Short Term Jobs 3
2
2. Total Long Term Jobs
3. Total Jobs (Add the numbers from 1 and 2) 5
4. Total EECBG Funds Requested 881, 100
5. Jobs Divisor (Divided the amount in 4 by $ 92, 000) 9. 4
6. Job Score (Divide the number in 3 by the number in 5) 53
Please round to nearest whole number
37-
Activity Million MWh Saved Thousand Cubic Gallons
Source Btu Feet Natural Gasoline
Saved Gas Saved Saved
Street light retrofit 1, 023.69
3 MWh per
million BTU n/ a n/ a
year
per year
Gym light retrofit 276 million 081 MWh per
n/ a n/ a
BTU per year year
Total Source Btu
1, 299.69 million BTU per year
Saved millions
Total Cost
38, 800 /yr
Savings
Include additional activities as an addendum.
GREENHOUSE GAS REDUCTION
Activity Metric Tons Carbon Reduced
Street light retrofit 189 metric tons per year
Gym light retrofit 5 1. 1 metric tons per year
Total Carbon
Reduced ( metric 240. 1 metric tons per year
tons
Include additional activities as an addendum.
SPECIAL • DESIGNATION( S)
Identify any Special Community
Designation( s) and provide documentation for
None
any Special Community Designation claimed
as an addendum.
CERTIFYING OFFICIAL
Certifying Official's Signature
If signed by a person designated by the local
governing body, a copy of the resolution must be
included.
Certifying Official' s Name (printed): Robert Mearns
Title: City Manager
Organization: City of Fort Walton Beach
38-
PROJECT NARRATIVE
B. PROJECT 13ACKGROUND:
The City of Fort Walton Beach desires to retrofit 1, 000 existing high pressure sodium street lights in the
City with energy efficient LED fixtures and replace 90 inefficient lighting fixtures in three City gymnasiums
with energy efficient T -5 fluorescent lamps. The City of Fort Walton Beach spends approximately
1, 200,000 in electricity energy costs with over % of this being spent on street lighting. Advances in solid
state lighting in the past twenty years have resulted in new more energy efficient options for street
lighting. LED fixtures have been shown to reduce energy usage by 50% and provide other benefits such
as better quality lighting and reduced maintenance. The T -5 fluorescent lamps will reduce electricity
consumption by about 40% over the current lighting technology in the gyms. In addition, the City would
like to complete an energy efficiency and conservation strategy as well as accomplish certain tasks to
obtain the Florida Green Local Government designation. Job creation will come primarily through
manufacturers, but also retailers through increased marketing, training, and sales activity that is
generated. Indirect and induce benefits are seen through economic multipliers as individuals and
businesses have reduced utility bills. Lighting applications account for a large portion of energy usage
therefore we can make the biggest impact on energy consumption by using more energy efficient lighting.
Implementing this project will save 300, 000 kWh /yr for street lighting, 81, 000 kWh /yr for gymnasium
lighting, and save the City $ 38,800/yr in lighting energy costs. Gulf Power Co. has been working with the
City over the past year on the prospect of LED lighting fixtures and has recently developed an approved
rate for an LED fixture that can be used by the City.
Team Profile- Gulf Power Co.'s Lighting Manager is a certified Professional Engineer and will be
responsible for organizing and executing the removal of old street lights and installing the new street
lights. Gulf Power crews will perform the work and have been thoroughly trained in proper installation of
street lights. City of Fort Walton Beach staff including the Environmental Specialist, City Engineer, and
the Facilities Operations Manager will be primarily responsible for administering the project. The
Environmental Specialist has experience with administering environmental grants. The City Engineer is a
certified Professional Engineer that directs the City's Public Services and Utilities Departments and is
responsible for the oversight of all city public works projects. The Operations Manager has been
responsible for the City's street lights and other electrical /maintenance duties for 25
