August 2, 2016

Okaloosa County BOCC — August 2, 2016 — Response to Report of Clerk’s Inspector General on the Production and Printing of the Okaloosa County Visitor’s Guide

Response to Report of Clerk’s Inspector General on the Production and Printing of the Okaloosa County Visitor’s Guide in the August 2, 2016 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-generated OCR reading text.

FILED WITH

About this source

Preserved among the August 2, 2016 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1346). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used ; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Response to Report of Clerk’s Inspector General on the Production and Printing of the Okaloosa County Visitor’s Guide
Date
August 2, 2016
Publisher
Okaloosa County Board of County Commissioners
Where to find it
8
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source identity and meeting date checked. OCR text has not received independent human proofreading; consult the scan for names, numbers and uncertain characters.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Response to Report of Clerk’s Inspector General on the Production and Printing of the Okaloosa County Visitor’s Guide — extracted reading text

Machine OCR from page images of the unchanged preserved PDF with source page boundaries retained. Not independently human proofread; consult the original scan for uncertain characters.

Text · 21.4 KB · 8

Download ↓

Response to Report of Clerk’s Inspector General on the Production and Printing of the Okaloosa County Visitor’s Guide — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 3.4 MB · 8

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Response to Report of Clerk’s Inspector General on the Production and Printing of the Okaloosa County Visitor’s Guide — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

OKALOOSA COUNTY’S RESPONSE TO THE REPORT ON REVIEW OF THE PRODUCTION AND PRINTING OF OKALOOSA COUNTY’S 2015 VISITOR’S GUIDE The County is in receipt of the Report on Review of the Production and Printing of Okaloosa County’s 2015 Visitor’s Guide (the “Report”) prepared by the Clerk of Court Inspector General. Please find the County’s response to the findings and recommendation contained in the Report. Review Committee and the Sunshine Law FINDING: Board appointed review committees, such as the one established to review RFQ submissions, make recommendations to the Board and as such are conducting the public’s business, subject to Florida’s Sunshine law. In discussions with the Purchasing Department Manager, she indicated that the meeting of the Board appointed evaluation committee was not advertised and minutes were not kept. This is contrary to both the Board approved Purchasing Policy and Florida Sunshine law. RECOMMENDATION: We recommended the Purchasing Department ensure that meetings of the evaluation committee are conducted in accordance with County policy and the Sunshine Law by providing notice of the meeting, opening it to the public and taking minutes. RESPONSE %&Gmm%wgees—wflh%lflfleeemfimmefl—Thls was an isolated incident and the Pure izesCounty agrees that review committee meetings must comply with the Sunshine Law and County Purchasing Manual. In this instance, minutes of the review committee meeting were taken, but misplacedwere misplaced. Although—theThe Purchasing Department historically maintained logs of solicitations submitted to the County and did so in this case. However,~ such logs failed to include a-time-entryan entry indicating the time of receipt of the response. The Purchasing Department has since created a more detailed log, which now requires the signature of a Purchasing Department employee, the vendor submitting the solicitation, and the time the submittal is received by the County. Bid Award and Permission to Negotiate FINDING: The TDD director placed an item on the agenda for the Board meeting held July 1, 2014, regarding the recommendation of the selection committee. While the Board Purchasing Policy permits the requesting department to prepare an executive summary of a proposed purchase that defines the scope of work and justification, it is silent as to who should present the results of the selection committee’s ranking. RECOMMENDATION: We recommend that procurement matters be presented by the Purchasing Department, especially in a case where the department director is a member of the selection committee. This point gets to the heart of the issue of independence and transparency in county procurement matters both in perception and fact. We recommend the county policy be clarified as related to who presents a recommendation to the board. RESPONSE: The-County-generally-agrees-with-thisrecommendation—However-dDepending on the complexity of the goods/services being procured, the Board has-generally believeds that it may be more appropriate for the requesting department, as the subject-matter expert, to submit and present the request to the Board._This allows the individual with the most detailed and specific knowledge of the goods or services being procured to be available to responds to any inquiries. No Contact Clause FINDING: The No Contact provision in the RFQ is different than that contained in the Board’s Purchasing Policy and is unclear as to when the no contact period commences. We noted an email between a prospective bidder and the TDD director (a member of the bid evaluation committee). In that email the bidder is requesting to submit the bid two days after the bid deadline. The TDD director responded to the bidder by email and instructed the vendor to submit the proposal late. While such correspondence between a member of the evaluation team and a prospective bidder does not violate the policy as written, we believe that it does not fulfill the intent of the policy. The ven

Download this text file with its original spacing ↓

Read all text · 2 parts →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — August 2, 2016 — Response to Report of Clerk’s Inspector General on the Production and Printing of the Okaloosa County Visitor’s Guide.” August 2, 2016. Response to Report of Clerk’s Inspector General on the Production and Printing of the Okaloosa County Visitor’s Guide. Crypt of Echoes evidence ID LED-2026-b733dfa05876446584ada0a865680194. http://127.0.0.1:58097/evidence/LED-2026-b733dfa05876446584ada0a865680194. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Response to Report of Clerk’s Inspector General on the Production and Printing of the Okaloosa County Visitor’s Guide, meeting materials for August 2, 2016. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=11990&MeetingID=1346

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓