About this source
RS&H TO #15 for Exit Lane from the Okaloosa County BOCC meeting of January 7, 2014 (IQM2 meeting #1186). Original portal label: RS&H TO #15 for Exit Lane. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- RS&H TO #15 for Exit Lane
- Date
- January 7, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Machine-extracted text — 11-RS_H TO _15 for Exit Lane.pdf
Text extracted on 2026-10-31 from 11-RS_H TO _15 for Exit Lane.pdf using optical character recognition (ocrmypdf/tesseract). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 6.0 KB
Download ↓RS&H TO #15 for Exit Lane (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 2.9 MB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
CONTRACT & LEASE INTERNAL COORDINATION SHEET
Contract/Lease Number:_C09-1737-AP Tracking Number:
Contractor/Lessee Name: RS&H Grant Funded: YES _—§ NO_X_
Purpose: Coordinate and Approve Construction Phase Service To#/5 for the Security
Checkpoint Exit Lane Controls System
Date/Term: NIP anticipated Jan 20, 2014 1. EX] GREATER THAN $50,000
Total contract time 120 days
Amount: $77,322.00 2. L] GREATER THAN $25,000
Department: Airport VPS 3. L] $25,000 OR LESS
Dept. Monitor Name: Sunil Harman
Document has been reviewed and includes any attachments or exhibits.
Purchasing Review
Date: _ {2-2 lay,
Risk Management Review
Appraved as written:
Date:
Risk Manager or designee
County Attorney Review
Approved as written:
Date:
County Attorney
Following Okaloosa comivongove
Contract & Grant
Document has been received:
Date:
Contracts & Grants Manager
TASK ORDER APPROVAL FORM
CONTRACT #: CO9-1737-AP
TASK ORDER #: i)
TASK ORDER AMOUNT: $77,322
OFFERED BY CONSULTANT:
Reynolds, Smith and Hills, Inc.
FIRM’S NAME
a Walz
IeNNCW, S PRINTED NAME
SIGNAJURE
Vice President — Aviation
December 16, 2013
TITLE
RECOMMENDED FOR APPROVAL
(Department Director)
Ls
aa ee
(ireclor of i Mepoots
TITLE
Vo AO-V
DATE
COUNTY ADMINISTRAT@R (if applicable)
2 /26/o3
DATE
DATE
APPROVED BY OKALOOSA COUNTY
(Per Purchasing Manual)
e $25,000 or less approved by Purchasing
Director
e Between $25,001 and $50,000 approved by
Purchasing Director and County
Administrator
e In excess of $50,000-approved by the Board.
PURCHASING DIRECTOR
pruetijh
DATE
CHAIRMAN (if applicable)
DATE
RS&H Project No. 201-0940-011
RS&H Contract No. CO9-1737-AP
Task OrderNo. ‘15
Date: December 16, 2013
Task Order
Northwest Florida Regional Airport, Okaloosa County, Florida
Security Checkpoint Exit Lane Controls System
Construction Phase Services
Reynolds Smith and Hills, Inc. a Florida Corporation (hereinafter “CONSULTANT”) agrees to
perform and complete the following services (hereinafter “Services”) for the Okaloosa County
Board of County Commissioners (hereinafter “COUNTY”), in accordance with the terms and
conditions of the Agreement for Professional Architectural, Engineering, and Aviation Planning
Services, dated 07 July, 2009, all of which terms and conditions are incorporated herein by
reference.
1. Task Location: Northwest Florida Regional Airport, Okaloosa County, Florida.
2. Task Name: Security Checkpoint Exit Lane Controls System — Construction Phase Services.
3. Task Description/Scope of Services: Construction Phase Services as detailed in
Attachment “A”
4. Compensation: Lump Sum Fee of $77,322.00
5. Schedule: Notice to Proceed anticipated January 20, 2014. Total Contract time is 120
calendar days.
6. Deliverables: N/A.
7. Other Considerations: None at this time.
ATTACHMENT ‘A’
NORTHWEST FLORIDA REGIONAL
AIRPORT
OKALOOSA COUNTY BOARD OF
COMMISSIONERS
Northwest Florida Regional Airport
Security Checkpoint Exit Lane Controls System
Construction Phase Services
ATTACHMENT “A” - SCOPE OF WORK
Security Checkpoint Exit Lane Controls System Construction Phase Services
A. PROJECT DESCRIPTION
Due to anticipated changes in TSA rules, Northwest Florida Regional Airport has
identified a need to develop a technology solution to monitor the exit lanes located at
the security check point in the terminal facility. Currently the Exit Lane where arriving
passengers exit at the security check point at the first level of the terminal is manned
by a TSA officer to prevent unauthorized entry to the sterile area of the concourse
facility.
TSA does not have a list of approved system manufacturers for the function. TSA will
typically test the system after installation and accept it based on their testing and
performance criteria at the time. The testing method and criteria may vary from location
and local TSA authority approving the installation.
Working with the airport staff and the TSA, RS&H designed a solution using technology
to monitor the exit lane at the SSCP. Okaloosa County accepted bids on this design
and is intending to award the project. RS&H will, through this Task Order, provide
Construction Phase support for the project.
B. | BASIC SERVICES - Construction Phase Support:
RS&H will attend the pre-construction meeting and provide nightly on-site project
representation for the four week period anticipated for construction activities at the
airport, project management support at each weekly construction progress meeting
and basic construction phase services including contractor submittal reviews,
contractor inquiries/responses, completion, closeout and as-built review.
G. IMPLEMENTATION SCHEDULE
e Anticipate NTP to Contractor in January 2014.
D. MEETINGS AND DELIVERABLES
RS&H will attend one (1) pre-construction meeting, twelve (12) weekly
progress/construction meetings, one (1) project closeout meeting.
RS8&H will update the design drawings with contractor provided as-built information and
deliver to NW Florida Regional Airport.
The scope of serviced provided in this proposal is limited to the specific work items enclosed
herein. Alterations to the project scope, project approach, project schedule, project sequencing,
and discovery of unforeseen circumstances, revisions to bid package format or content, or other
revisions may be cause for additional services to be provided under this agreement and for
corresponding adjustments to the lump sum project fee.
Okaloosa County, Florida Construction Phase Services
Northwest Florida Regional Airport December 16, 2013
Security Checkpoint Exit Lane Controls System Page 4
BSH OKALOOSA COUNTY AIRPORTS SYSTEM
OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS
Attachment B - Project Costs
NORTHWEST FLORIDA REGIONAL AIRPORT
PASSENGER EXIT LANE CONTROL SYSTEM
CONSTRUCTION PHASE SERVICES
BASIC SERVICES
SUMMARY
Totals
Task 3.1 Construction Administration
Basic Services $13,770
Task 3.2 Periodic Site Visits/Weekly Site Visits
Basic Services $42,196
Task 3.3 Resident Project Representative (RPR) - 4 Weeks
Basic Services $21,356
BASIC SERVICES - TOTAL $77,322
GRAND TOTAL LUMP SUM FEE $77,322