READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 08-23-05 — reading text
Part 6 of 27. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-10068-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
prepared by a professional
landscape architect or nurseryman
must be submitted and approved by CDS staff. The plan must include the
required
perimeter buffer along the east property line. The plan must comply with all
applicable regulations in Sections 20- 1836 through 20- 1834 of the LDC, including
design for an irrigation system with a well.
e. The plans must address all applicable items submitted
by Public Works/ Engineering,
Building Inspections and Fire Department staff in memorandums distributed at the
June 22, 205 DRC meeting as follows:
Public Works/ Enaineerina Comments:
1. What happens to the " water filling station" in the new parking lot?
2. Vehicular ingress and egress must be designed from Chestnut Avenue
right-of-
way. The exit drive to the alley cannot be the only point of
egress from the
property. It can be used as a secondary exit, but the City will not be responsible
for making improvements to the alley and maintaining its use as a
private drive.
3. An 8" water main is available in the east right-of-way of Chestnut Avenue, behind
the street.
4. According to office drawings, here is a 4" sewer service available approximately
138 feet south of the manhole in Chestnut Avenue at the north end of the
property. Location of this sewer tap must be field verified.
5. Show the proposed water and sewer service lines to the new
buildings; identify
the size taps and meter. Water meter to be in the right-of-
way; backflow
preventer to be on private property.
6. Stormwater management plan must meet the City' s stormwater regulations
Article VII of the Land Development Code). Stormwater runoff from the 2 lots
being developed must be treated, including runoff from the gravel parking areas.
7. Notice must be filed with FDEP for the stormwater management plan prior to the
City' s approval for a building permit.
8. Water and sewer impact fees will apply to new development. Developer must
complete an ERC Determination Form based on table provided in the impact fee
ordinance or estimated water and sewer flows.
9. Water and sewer connection fees will be determined when the final utility plan
has been submitted and approved.
10. Must meet FDEP environmental regulations and FDOT standards for sediment
and soil erosion control.
230 8/ 9/ 05
SITE PLAN APPROVAL- KilLINGSWORTH ( CONT)
Buildina Inspection Comments:
1. Title page shall correspond with Section 104 FBC.
2. Fire separation required between " garage" and " business" portion. The rating
will be dependant upon exact usage of " garage." No penetrations allowed.
3. Depending upon type of construction, a fire wall mayor may not be required on
exterior wall neatest to property line.
4. Provide mezzanine layout including emergency lighting and exit lights.
5. Provide water fountain.
6. Note on plans an as built survey will be required after slab inspection.
7. Show on plans insulation on water heater lines within 8' of water heater and a
switched disconnect at unit.
8. Soil compaction test required.
9. Backflow preventor required- check with AI Jordan at 833- 9630 for type. A final
inspection by him will be required- please note on plans.
10. Provide handrail on stairs.
11. Provide safe loads on mezzanine area.
12. Note on plans air conditioning units shall be secured to a concrete base.
13. Provide product approvals.
14. Provide impact glass on windows/doors.
15. Provide emergency lighting in handicapped restroom
16. Termite treatments required (two) copies to this office.
17. Water hammer arrestors required- note on plans.
18. Any floor drains shall require trap primers.
19. If garage area is to repair vehicles, oil- separators required.
Fire Department Comments:
1. 6- inch numbers shall be placed on the address side of the building and on main
entrance of commercial occupancies.
2. lock box shall be installed with keys for occupancy.
f. A note must be added to the site plan documents that states " A future driveway
connection and/ or shared access may be required to be provided between this
project and the abutting property to the north if it is redeveloped."
2. Prior to a Certificate of Occupancy any utility easements required by the City
granting
must be executed.
Mr. Campbell seconded motion and it carried unanimously with Holmes, Patterson, Campbell,
Tucker, Pullen, Hartwell, and Minich in favor.
REQUEST FOR BRIEFING ON PARKING REQUIREMENTS
the area
Request by Council M ember Wayne Pullen for a briefing on parking requirements in
South, the West, Hollywood Blvd on the
bounded by Santa Rosa Sound on the Eglin Parkway on
North; and by Bay Drive on the East. Further, request Council direction for staff to review the Special
Parking District recommend alternatives to the CRA and MPB and propose mechanisms
Regulations,
to accommodate the parking needs within these areas.
The City Manager advised that Staff would like direction from Council regarding the 70% occupancy
ratio in the Special Parking District as required by the resolution; since the 70% has not yet been met,
and parking is becoming more congested in this area. She suggested now is the time to possibly
area to
develop different requirements, if necessary, or explore options with the downtown
accommodate additional public/ private parking space options, including a parking garage.
and the
Missy McKim, CDS Director, agreed that the District needs to be evaluated since the needs
economic feasibility of the area has changed since the resolution was adopted.
Mr. Minich moved to direct Staff to conduct a study on the Special Parking District regulations
and their recommendations to the CRA and MPB. Mr. Tucker seconded motion.
present
8/ 9/ 05 231
PARKING REQUIREMENTS ( CONT)
Dr. Pullen amended the motion to conduct the
study in 60 days. Mr. Patterson seconded the
amendment.
The City Manager explained that 60
days is not a realistic requirement because of Staff's competing
priorities, including providing information for the MPB on the height/data study due in 60
that the parking study could be accomplished
days, and
by the end of the calendar year.
The Mayor called for the vote on the amendment to conduct the
study in 60 days and it failed by a
vote of 2 to 5 with Patterson and Pullen in favor and Holmes,
Campbell, Tucker, Hartwell, and Minich
opposed.
The Mayor called for the vote on the motion to direct Staff to
conduct a study on the Special
Parking District regulations and present their recommendations to the CRA and MPB and it
carried unanimously with Holmes, Patterson,
Campbell, Tucker, Pullen, Hartwell, and Minich
in favor.
REQUEST FOR BRIEFING ON PIRATES BAY
Request by Council Member Wayne Pullen for a briefing on the status of the stipulated agreement
with the City of Fort Walton Beach and Pirate' s
Bay Community Association, Inc. Further,
consideration of a request by Mark Reynolds, President of Pirate' s
Bay Community Association, Inc.
to extend time to comply with item number 8 of the
stipulated agreement between the City of Fort
Walton Beach and the Pirate' s Bay
Community Association, Inc. until August 31, 2005, to provide a
site plan, drawn to scale,
demonstrating the required parking requirements have been met according
to the formula specified in the agreement. The
City Attorney concurs with this request.
The City Manager reported that Pirate' s
Bay has not met all of the requirements of the stipulation
agreement but they are being worked on. She advised before an occupational license can be applied
for, the City needs approval of the site
plan for parking, and the City is giving Pirate' s Bay until
August 31, 2005, to comply with the requirement for parking.
The City Attorney advised that although she concurs with the actions
by Staff, she did not expect this
issue to come before Council after Council the
approved Stipulation between the homeowner' s
association and the City. It should only be information to the Council; otherwise,
any action on the
item by the Council would circumvent the Code Enforcement Board action
and the intent of the
stipulation.
HISTORIC SITES BOARD APPOINTMENT
Consideration of appointment to the Historic Sites Board.
Mr. Tucker moved to appoint Kirby Locklear, 13 Windsor Lane, Fort
Walton Beach, to the
Historic Sites and Structures Advisory Board for an
unexpired term until December 10, 2008.
Mr. Campbell seconded
