there is no financial impact to the City.
4. RECOMMENDATION:
4. 1. Pursuant to City of Fort Walton Beach Code of Ordinances, Volume Il, Chapter 4,
Section 4. 01, Paragraph 4.01. 025 and the Purchasing Policies and Procedures, Staff
requests City Council authorization to reject all proposals for Request for Proposals No.
11 -005 for Water Tank Maintenance Program and authorization for Staff to reissue the
RFP.
ATTACHMENTS:
RFP 11 - 005 WATER TANK MAINTENANCE (PDF)
RFP 11 - 005 Addendum 1 ( PDF)
RFP 11 - 005 Addendum 2 ( PDF)
RFP 11 - 005 Addendum 3 ( PDF)
SIGNATURE BLOCK:
Michael Beedie Completed 12/ 29/ 2010 8: 55 AM
Finance Completed 12/ 29/ 2010 11: 11 AM
Carole Jones Completed 01/ 03/ 2011 8: 50 AM
City Manager Completed 12/ 30/ 2010 12: 46 PM
City Council Pending
REQUEST FOR PROPOSALS
FOR THE CITY OF FORT WALTON BEACH
RFP 11 -005
WATER TANK MAINTENANCE PROGRAM
Issued By:
Purchasing Department
143 Hollywood Blvd. NW
Fort Walton Beach, Florida 32548
850) 833 -9523
Fax ( 850) 833 -9643
Website: http: / www.fwb.org
/
Date of Issue: October 26, 2010
REQUEST FOR PROPOSALS # 11 - 005
Water Storage Tank Asset Management Program
1. PURPOSE:
The City of Fort Walton Beach intends to enter into a multiple year professional maintenance and
asset management contract for eight (8) water storage tanks that provide a combined 3. 535 million
gallon capacity. This contract will include engineering and inspection services, rehabilitation, repair,
10) year period. It is
repainting, washout, and all preventative maintenance services for a ten (
anticipated that contract will be issued for an initial five (5) year period with one additional five (5)
year extension available upon mutual agreement and satisfactory performance.
Capacity in Built
Location Type
Gallons
Hughes Street Ground Concrete 1351000 1950?
Nicholson Street Elevated Pedestal 5001000 2006
Holmes Boulevard Elevated Legged 2001000 1958
Holmes Boulevard Ground Steel Dome 250, 000 1958
Anchors Street Elevated Legged 5001000 1976
Hill Avenue Ground Concrete 110005000 1983
Golf Course Elevated Legged 2005000 1971
Park View Road Elevated Pedestal 750, 000 2006
All proposals will be publicly opened and the list ofproposers read aloud in the Main Conference Room at
City Hall, 107 Miracle Strip Pkwy. SW, at the time specified and will be made available for public
inspection within ten ( 10) days after the proposal opening or when an award decision is made, whichever
is earlier.
Proposals MUST be received by the City by the due date and time set forth above. Questions regarding
submission of Proposals may be directed to:
William Worlds CPPB,
Purchasing Agent
fwbpurch(afwb.org or 850- 833 -9523
2
4.a
2. TIMELINE OF ACTIVITIES:
October 26, 2010 Issue Request for Proposal on Florida Bid System Website:
www.floridabidsystem.com. ( Registration required)
November 4, 2010 Mandatory Pre -proposal Meeting to be held at 10: 00
AM CST at the Purchasing Division Office, at 143
Hollywood Blvd. NW.
November 18, 2010 Proposals Due at 2: 30 PM CST at City Clerks Office, 107
Miracle Strip Parkway SW
November 23, 2010 Selection Committee Meets at 10: 00 AM CST at 143 Hollywood
Blvd. NW (Interviews optional)
December 14, 2010 Recommendation of Award to City Council
3. MINIMUM QUALIFICATIONS
a. Must demonstrate a minimum of five ( 5) years experience in Water Storage Tank
Asset Management Programs.
4. SCOPE OF SERVICES
The City of Fort Walton Beach is requesting proposals for asset management services from firms
with extensive experience in Water Tank Asset Management Programs. In general, the firm would
provide all engineering and inspection services specific to the maintenance ofthe eight (8) existing
water storage tanks including inspection, repair, perpetual maintenance, rehabilitation, washout,
preventative maintenance, proactive asset management and painting services for a ten ( 10) year
period. There shall be one contract agreement for each water tank. The initial timeframe for each
tank contract shall be limited to five ( 5) years at which time the contract may be extended for an
additional five (5)
year period upon mutual agreement and satisfactory performance. Any contract
may be terminated by the City with thirty (30) days written notice to the firm. All contract fees and
payments shall be mutually agreed to and be specified in the contracts. The firms will provide an
annual schedule of activities and related costs per tank per the above guidelines for a ten ( 10) year
period. The annual cost does not have to be the same for each year of the agreement.
The services to be provided by the selected firm shall include, but not be limited to, the following:
1.
Furnish any and all services, including inspection, engineering, and construction services,
needed to ensure the vessel is in a sound, watertight, condition and complete working order
according to design specifications and in compliance with all State of Florida requirements,
including but not limited to steel replacement, steel parts, foundation repair, expansion
joints, water level indicators, sway rod adjustments, tank overflows, manhole covers, valves,
gaskets, and other component parts ofthe vessel or vessel tower. The firm shall warranty all
work throughout the duration of the agreement.
2. Inspect the vessel at least once within any twelve -month period to ensure that the structure is
in a sound watertight condition and provide the city with a comprehensive report of
K
inspection and proposed corrective actions ( if any) within thirty ( 30) days from date of
inspection. Complete corrective action shall be performed by the firm within a designated
period of time dependent upon the action and weather conditions.
3. Completely pressure wash (washout) the vessel interior at least one time within any two -year
period and remove all mud, silt, and other accumulations that might be harmful to the vessel
or its contents. After washout is completed, thoroughly inspect and disinfect the vessel in
accordance with ANSI /AWWA C652 utilizing disinfection spray method # 2 and return the
vessel to service.
4. At a minimum, the required structural and coating integrity inspection shall be carried out by
personnel under the responsible charge of a professional engineer licensed in the State of
Florida on the first, fifth, and ninth year of the contract and shall comply with the
requirements of Chapter 62- 555. 350 of the Florida Administrative Code. The inspection
report shall be signed and sealed by the professional engineer.
5. A complete interior and exterior renovation of all steel tanks shall be completed twice within
the 10 -year contract period and a complete exterior renovation of all concrete tanks shall be
completed once within the 10 -year contract period. The painting process shall include all
work necessary to properly prepare the surface of the vessel to accept the new paint.
Standard lettering or logos on the vessel, similar to existing, shall be included in the exterior
painting cost. The need for interior painting shall be determined by the thickness of the
existing liner and its protective condition. The need for exterior painting shall be determined
by the appearance and protective condition of the existing paint.
6. Install or repair anti -climb devices on the access ladder to each vessel to prevent
unauthorized persons from climbing the vessel.
7. Install locks on the roofhatches and anti -climb devices to prevent unauthorized persons from
entering the vessel.
8. Install or repair navigation lights on elevated tanks to make the vessel visible to aircraft at
night.
9. Provide the City' s Water Operations Division with a minimum advance notice ofthirty (30)
working days in advance of performing any services that will result in removing a vessel
from service.
10. All rules and regulations ofthe State of Florida, and all applicable ANSI /AWWA Standards
will be strictly adhered to. Additionally, a method for determining the future repainting
schedule should be addressed for the vessel.
11. All permits, approvals, etc., required by the State of Florida and the local municipality will
be the responsibility of the successful contractor.
12. The firm shall warranty all work throughout the duration of the agreement and for a
period of one ( 1) year following the end of the final contract period.
5. QUALIFICATION CONTENT
M
8. 4a
To standardize responses and simplify the comparison and evaluation of the responses, all
statements must be organized in the manner set forth below, separated into sections, and
appropriately labeled. All information and materials requested shall be provided in the proposal
under a single cover.
a. Business Organization —The full name and address of the firm. The branch office (if
any) that will perform the services described herein shall also be stated. The Principal -
in- Charge of the branch office shall be identified. A statement shall be included from the
firm to the best of its knowledge, that there are no circumstances that shall cause a
conflict
of interest in performing services for the City of Ft. Walton Beach.
b. Technical Approach and Scope of Work —The responding firm shall state its
understanding of the project as outlined in the Scope of Services above. The approach
in rendering the services