maintenance management program (MAXIMO).
6.4 Incorporate new equipment O/M hard copy and electronic documents associated with PROJECT into
exiting WWTP O/M manuals.
Work Task 7. Miscellaneous Evaluations, Analysis, and Conceptual Design Assistance
As authorized by the CLIENT’s Representative, CONSULTANT may be requested to provide professional
services for miscellaneous evaluations, analyses, and conceptual designs to support PROJECT components.
CLIENT and CONSULTANT shall develop and negotiate any work tasks assigned to CONSULTANT by
CLIENT in accordance with the CONSULTANTS current Master Service Agreement.
Work Task 8. Instrumentation and Control (l1&C) Programming and Integration
8.1 I&C Design Services
8.1.1 Instrumentation and Control (I&C) Design-Approximately 100% is anticipated for this engineering
discipline. Several existing I&C issues will be addressed during this project, including:
8.1.2 Design modifications and upgrades to the existing Plant Monitoring & Control System (PMCS) to
integrate the new processes and equipment into the PMCS. The goal would be to address any I&C
issues associated with the existing system including the required upgrades to the system server
hardware, software, and network infrastructure. The proposed upgrade shall provide a system that
consists of physical hardware server(s)/host(s) that run a virtual environment that shall be
configured to communicate with the primary control system network running at the main OCWS
office such that the plant data can be monitored and historized for long term archival. The purposed
system shall be configured to allow the plant to operate all necessary functions self-sufficiently
without requiring connections to remote networks to control, monitor, and operate the plant. (Note:
The system running at the main OCWS office is considered the primary control system network as this facility
provides the central control system catalog (Wonderware Galaxy) and all of the archived control system files
that are actively backed up on the system data back-up appliance.)..
8.1.3 The control system shall also be configured as a secondary/redundant control network that shall
allow the Wonderware SCADA application to be monitored and control in the loss of a network
connection from the main OCWS office. Therefore the Arbennie system shall be configured to run
not only the Wonderware objects and software required for the local plant, but shall include all
objects required to view the main SCADA application and Bob Sikes WWTP as well.
11
EXHIBIT A— OKALOOSA COUNTY WATER AND SEWER SYSTEM ARBENNIE PRITCHETT WRF 5 MGD EXPANSION
PROJECT MANAGEMENT & DESIGN CRITERIA PROFESSIONAL SERVICES
8.1.4
8.1.5
8.1.6
8.1.7
8.1.8
8.1.9
8.1.10
Design new Wonderware Archestra graphics to update all of the graphics associated with the
Arbennie WWTP. This shall include existing and proposed equipment and unit processes. In
addition, the graphics shall be Archestra graphics that shall be stored and cataloged in the new
consolidated OCWS Galaxy.
Prepare SCADA system operation support documentation and associated “how to” instructional
booklets for logic and graphical development of adding additional hardware and monitoring into the
CLIENT system. All system support documentation shall be cataloged and stored on the primary
control system network and links shall be provided such that user can easily access the standard
documents
Design upgrades to the existing PMCS hardware and software systems to replace the 2007 equipment
with new equipment. This process shall commence by performing a plant wide evaluation of the
existing systems to determine the current state of the PMCS hardware and software. The existing
servers and workstations at the facility shall be replaced with a virtual system architecture that shall
be provided, configured and installed to allow virtual servers to run the local Wonderware system
functions (object servers, data access objects app engines, view engines, etc.) and provide virtual
workstation sessions that are configured to be accessed by hardware thin clients or desktops that
function to provide the local interface to the graphical Wonderware system. In addition, all PLC
hardware shall be evaluated to determine if the devices should be replaced or upgraded during the
project. In the event that the hardware is not replaced the hardware operating system or firmware
shall be updated to the latest stable version such that all equipment is operating on the same
platform.
Design improvements to integrate and consolidate the CLIENT’s Wonderware distribution and
collection system SCADA and the PMCS for the Arbennie Pritchett WRF, Russell Stephenson WRF
and the Bob Sikes WRF. This shall include consolidating all the Wonderware systems in the central
virtual system that is housed at the OCWS central office. In addition local servers shall be installed at
each facility for the sole purpose of running the local instances of the object servers, app engines,
view engines, and other Wondeware components required for system functionality. All of these
objects shall be deployed and managed from the central repository installed at the main OCWS
Office.
Design and incorporate a Wonderware based solution to allow enterprise and mobile users to access
control system applications, reports, and custom dashboards. The intent is to provide a cohesive
Wonderware based solution that will enable CLIENT and other authorized personnel to access the
information and data from the Wonderware distribution and collection system SCADA and the
PMCS for the Arbennie Pritchett WRF, Russell Stephenson WRF and the Bob Sikes WRF using
multiple access sources and devices (smart phones, tablets, laptops and other computers) that are not
directly associated with the CLIENT’s network. Security will be built into the system to limit control
functions as well as access by unauthorized persons.
Design improvements to integrate and consolidate the CLIENT’s asset management and supporting
software systems from the Arbennie Pritchett WRF to the virtual server system installed at the central
OCWS. These supporting systems shall be migrated to the OCWS central office and shall be
upgraded to the latest available stable versions, and shall be included in the OCWS back-up and
archival scheme. Access to the supporting software applications shall be executed through local thin
clients that operate RDP sessions to connect to the centrally installed applications.
Evaluation and design of the Server Room infrastructure improvements at Arbennie Pritchett WWTP
and the Bob Sikes WWTP. Through preliminary evaluation at each of these facilities, it has been
noted that there are major concerns with the areas in which the critical computer and network
infrastructure is housed. Below is a summary of the key issues that were determined at each site:
8.1.10.1 At Bob Sikes the existing server rack is installed in a common area that lacks environmental
conditioning as well as appropriate physical security measures to mitigate undesired physical access
to the server and network equipment. The suggested method to resolve this issue would be to
relocate the server and network equipment to a secure room at the facility and upgrade this location
12
EXHIBIT A— OKALOOSA COUNTY WATER AND SEWER SYSTEM ARBENNIE PRITCHETT WRF 5 MGD EXPANSION
PROJECT MANAGEMENT & DESIGN CRITERIA PROFESSIONAL SERVICES
with the proper environmental conditioning equipment to maintain the interior conditions within the
optimum operating range for the installed equipment.
8.1.10.2 At the Arbennie Pritchett WWTP there have been instances where the server room has experienced
8.1.11
8.1.12
leaks in the roof above the server racks housing the critical system components. The areas above the
equipment shall be examined thoroughly and any discovered issues shall be corrected. In addition, if
it is determined that the equipment has been installed under a roof penetration required for roof
mounted equipment, then the server equipment shall be relocated to an area that is not directly under
an area that may leak again in the future.
Evaluate and migrate the Preventative Maintenance and Asset Management systems currently
installed at Arbennie to the BCC network and virtual infrastructure. The intent would be to move
these applications for data security and disaster recovery purposes. In order to provide SCADA
system data between the SCADA and BCC network the PCMS shall be configured with a secure data
tunnel between the two systems along with a database container installed on the BCC network to
allow asset information to be harvested and displayed on the BCC network. In addition, the two
management applications (Maximo and Hach WIMS) should be evaluated for current utilization and
it should be determined if these applications should be utilized in the future, or should these
functions be moved to the currently owner Sunguard Technology solution.
All hardware and software costs associated with the I&C Design shall be paid for by the CLIENT and
may be supplied by either the CLIENT or the D/B Team, as directed by the CLIENT.
KRERE End RREER
EXHIBIT B— OKALOOSA COUNTY WATER AND SEWER SYSTEM ARBENNIE PRITCHETT WRF 5 MGD EXPANSION
PM & DCP COMPENSATION & HOURLY PER DEIM RATE SCHEDULE AND DIRECT EXPENSES
Exhibit B—Compensation and Hourly Per Diem Rate
Schedule and Standard Rates for Direct Expenses
for Owner’s Representative and Design Criteria
Professional Services for the Arbennie Pritchett WRF
9 MGD Expansion Design Build Project
The purpose of this document is to describe Constantine Engineering, Inc.’s compensation and
hourly per diem rate schedule of charges.
Compensation
As compensation for providing the services described in Exhibit A—Scope of Basic Services for
Owner's Representative and Design Criteria Professional Services for the Arbennie Pritchett WRF 5
MGD Expansion Design Build Project, CLIENT shall pay CONSULTANT in accordance with the
Agreement based on either a percent complete for identified Lump Sum (LS) task or rate based for
Time and Material (T&M) task. T&M task will be billed based on the hourly per-diem rate schedule
per employee grade, as defined in Table 1, for the actual time worked on the Project.
CONSULTANT ’s standard Direct Expense rates will be identified and will be reimbursed as defined
in Table 2.
The Hourly Per Diem Rates are 1/8th of the tabulated per diem rate for a normal 8-hour workday.
Table 1. Hourly Per Diem Rate Schedule
Hourly Per Hourly Per
Diem Rate Diem Rate
Classification ($) Classification ($)
Principal 175.00 CADD Designer 71.00
Senior Reviewer/Consultant 175.00 CADD Technician 69.00
Program Manager 175.00 Construction Contract Administrator | 157.00
Senior Project Manager 180.00 Construction Manager 131.00
Project Manager 159.00 Construction Inspector 76.00
Senior Professional Engineer 164.00 Construction Tech 66.00
Professional Engineer 116.00 Field Tech 2 76.00
Engineering Intern II 91.00 Field Tech 1 65.00
Engineering Intern | 82.00 Clerical/Administrative 49,00
Senior Environmental Scientist 127.00 2 Man Line Verification Field Team | $183.00
Environmental Scientist 90.00 1-Man GPR/Locations Crew $140.00 @)
Senior GIS/Database Programmer 95.00 2-Man Manhole Inspection Crew $159.00 @)
GIS Technician 95.00 1-Man GPS Crew $117.00 (4)
Senior CADD Designer 73.00
(1) Note this rate includes the costs for vacuum excavation verification and sub-meter global positioning
system (GPS) with satellite differential real-time correction equipment, and expendables, excluding orange
buttons for permanent markers.
EXHIBIT B— OKALOOSA COUNTY WATER AND SEWER SYSTEM ARBENNIE PRITCHETT WRF 5 MGD EXPANSION
PM & DCP COMPENSATION & HOURLY PER DEIM RATE SCHEDULE AND DIRECT EXPENSES
@) Note this rate includes the costs for ground penetrating radar (GPR) location equipment; sub-meter GPS
with satellite differential real-time correction equipment, and