READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — October 21, 2014 — Change Order for GMP 10-21-2014 — reading text

Part 1 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 76-Change Order for GMP 10-21-2014.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

eG bar a8 Se Se? Ee MY INDLTY u ORDER ARCHITECT Oo CONTRACTOR a FIELD a AIA DOCUMENT G701 (Modified) OTHER Qo PROJECT: Shalimar Courthouse Annex Repurpose CHANGE ORDER NUMBER: Five (5) (name, address) 1250 Eglin Parkway DATE 6 October 2014 Shalimar, FL 32579 TO CONTRACTOR: ARCHITECT'S PROJECT NO: 12009 (name, address) Lord & Son Construction, Inc. CONTRACT DATE: October 16, 2012 Post Office Box 1808 Fort Walton Beach, FL 32549 CONTRACT FOR: CM @ Risk Services The Contract is changed as follows: Adjustment to contract for Approved GMP amount (see attached Change Order 5 Breakdown and relevant portions of previous Change Orders 1, 2, 3 and 4). Not valid until signed by the Owner and Contractor. The original (Contract Sum) was $904,667.00 Net change by previously authorized Change Orders..........ccscseseeren $4,933,273.44 The (Contract Sum) prior to this Change Order Was ......c:cscesccsccsecsssesessscscereeseeees $5,837,940.44 The (Contract Sum)) will be (increased) by this Change Order in the amount of $6,237,084.60 The new (Contract Sum) including this Change Order will be ......ccccccscsscssecseeseeees $12,075,025.04 The Contract Time will be changed by: N/A The date of Substantial Completion as of the date of this Change Order therefore is: Per Contract NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. DAG Architects, Inc. Lord & Son Construction, inc. Okaloosa County BOCC Architect Contractor Owner 1223 Airport Road Post Office Box 1808 1804 Lewis Turner Blvd., Ste. 100 Destin, FL 32541 Fort Walton Beach, FL 32549 Fort Walton Beach, FL 32547 ZN a} L TM Lye A Na. Address —— By. Bi By Charles W. Clary Ill, faa Leven D. Lord II Kelly Windes Architect i) /} President if Chairman Date: IG 7, [EZ Date: /0- C f Date: AIA DOCUMENT G70? CHANGE ORDER « 1987 EDITION = AIA - 1987 » THE AMERICAN INSTITUTE OF ARCHITECTS 1755 NEW YORK AVE, NW., WASHINGTON, DC. 20006 G701-1987 (Modified) Okaloosa County Administration Building Contract C12-1995-FM Change Order 5 Breakdown for Contract Adjustment per Approved GMP Preconstruction Services (includes Architect Construction Administration and CM Construction Fee) New Design Budget (CO 2) New CM Build Budget (CO 2) Total New Design and CM Build Budget Less Architect Construction Administration (CO 2) Less CM Construction Fee (CO 2) Total Preconstruction Budget Approved Construction GMP Less Est. Sales Tax Savings Adjusted GMP Budget - Approved Additional Scope - Asbestos Abatement - CO 1 Additional Scope - Asbestos Abatement Portion - CO 4 Additional Scope - Bond for Asbestos - CO 4 Total Additional Scope - Asbestos Total for ail work - Precon, GMP, Asbestos Preconstruction Budget GMP Budget Asbestos Scope Addition Total for all work Less Currently Funded Amount Total Adjustment for Approved GMP -CO5 $817,597.00 $645,950.00 $1,463,547.00 ($150,841.71) ($508,500.00) $804,205.29 $11,262,329.00 ($168,935.00) $11,093,394.00 $170,854.54 $6,506.15 $65.06 $177,425.75 $804,205.29 $11,093,394.00 $177,425.75 $12,075,025.04 ($5,837,940.44) $6,237,084.60 State of FL Certified General Contracior #CG C008942 State of FL. Certified General Contractor #OG CO57094 | CONSTRUCTION, State of AL Certiled General Contractor #12776 ING. State of GA Certified General Contractor #@CCOC02537 CONSTRUCTION MANAGER / GENERAL CONTRACTOR State of MS Geriitied General Contractor #087714-MC Trusted Performance ... Lasting Value Administration Building for Okaloosa County G.M.P. Proposal - Project Narrative Summary: On November 5, 2013, we were tasked with designing and building an office building for numerous county service agencies, many of which are currently in private, tented space. Original square footage requirements ranged from 60,000 to 75,000 SF. We were also directed to separate the Sheriff's administration component from the county's main administration groups, as it was determined that over $1 million in county funds could be saved by better utilization of Sheriff's personnel and providing a lower cost facility adjacent to the existing Sheriff's office in Shalimar. Our team revisited all the user groups, confirmed their current space and function requirements, and discussed their needs for possible future growth. At each step in the process, we met with the designated county work group to discuss budget and construction materials and systems. The goal has always been to provide the highest quality, low maintenance materials at the lowest cost possible. After several alternatives were-reviewed_it was determined that a three story tower for the constitutional offices (tax collector and property appraiser) was the most efficient use of space. Several departments, such as |.T. and Growth Management, would occupy the third floor of the tower. A separate wing with ample meeting space to house the Board of Commissioners and the Supervisor of Elections was designed into the building layout. This overall layout produces over 63,500 square feet of floor space on less than half the area of the previous complex, while allowing over 40,000 SF of area for additional parking. The core of the building is structural stee! with steel studs and masonry cladding. The roof is standing seam metal and the glazing has Solarban glass in anodized aluminum frames. The two elevators provide the hoisting capabilities, and three stairwells provide life safety egress. The county work group was very integrated with the direction of which the county department should locate where and the type of building materials and building systems developed to provide the highest quality for the budget. We are quite pleased to present this G.M.P. proposal at a cost of $11,093,394 that 19 David Street + Fort Walton Beach, Florida 32547 =~) 4 ren P.O, Box 1808 + Fort Walton Beach, Florida 32549 850-863-5158 + FAX 850-862-4904 i Ou info@lordandson.com Assoclated Bullders www.lordandson.com and Contractors, Inc. North Flerida Chapter ‘Specializing in Commercial Construction Since 1975 50% Estimate Budget for the 50% Design Drawings - Building $ 10,341,385.00 Estimated Slaes Tax Savings (1.5%) $ (155,121.00) Subtotal Building Construction Cost $ 10,186,264.00 Sitework / Utilities $ 821,896.00 Demolition / Temporary Fence $ 162,885.00 Landscaping / Irrigation / Wood Fence $ 150,446.00 Sidewalks / Unit Pavers $ 58,410.00 Architectural and Engineer Fees $ 151,890.00 Total Project Construction Cost $ 11,382,574,00 Allowances 100% G.M.P, GMP 100% Drawings and Specification $ 11,262,329,00 Estimated Sales Tax Savings (1.5%) $ (168,935.00) Adjusted Project Construction Cost $ 14,093,394,00 c TIFIED AND TRUE COPY MAY/30/2014 CHANGE ORDER FORM bate: 4/22/2014 Contract No, _C12-1995-FM Change Order No. 14-01 Owner: _ OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS Contractor____Lord & Son Construction, Inc, » 7). 1, GHANGETO CONTRACT PRIC oo —BESCRIPTION — oon Original Contract Price: 904,667.00 Net change by previously authorized Change Orclers: 0.00 Present Contract Price: 904,667.00 This Change Order will (add /dleduct): 170,854.54 New Contract Price: 1,075,521.54 — CHANGETO CONTRACTIIME DECRRTON———_—-._ ——sarroruucor bas Original Contract Time: TBD TBD Original Substantial Completion Date: TBD Net change by previously authorized Change Orders: NIA This Change Order will (add/deduct): NIA New Contract Time: NIA New Substantial Completion Date: NA APPROVALS REQUESTED ovis an Mawa PROJECT OWNER: This Change Orcier is an amendment to the Canfract/A Owner, anid all other contract provisions shall remain in amended in writing, signed by both parties, DATE: 4,| zalzaid 44/20 DATE:___ 4/22/2014 DATE: cfrshu t DATE: % gieement beiween Contractar and the ull force and effect unless sgecticaly CERTIFIED A TRU AND CORRECT COPY DON W. HOWARD CLERK CIRCUIT CQUAT BY__.. NG DEPUTY CLERK ac pate Lnaty..30,.02 OL ATA’ pocument 6701/ema" - 1992 Change Order - Construction Manager-Adviser Edition PROJECT (Namie arnd acktress): CHANGE ORDER NUMBER: 001 OWNER: XJ Shalimar Courthouse Annex Repurpose INITIATION DATE: 04/1 5/2014 CONSTRUCTION MANAGER: Now known as: Okaloosa County ARCHITECT: Administration Building CONTRACTOR: [] Shalimar. Ft, FIELD: CJ TO CONTRACTOR (Name and address): PROJECT NUMBERS: 12009 / 1217 OTHER: [-} Lord & Son Construction. ine. CONTRACT DATE: 10/16/2012 19 David Street CONTRACT FOR: General Fort Walton Beach, FL 32547 Construction THE CONTRACT IS CHANGED AS FOLLOWs: Additions to orginal contract Scope (see attached Change Order | Breakdown and Exhibits A & B) The original Contract Sum was $ 904,667.00 Net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 904,667.00 The Contra Sum will be increased by this Change Order in the amount of $ 170,854.54 The new Contract Sum including this Chunge Order will be $ 1.075,521.54 The Contrast Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore fs NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. NOT VALID UNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR. Lord & Son Construction, Inc. DAG Architects, Inc. CONSTRUCTION MANAGER (Firm name} ARCHITECT (Firm name} 19 David Street fFort Walton Beach, FL 32§47 1223 Alnpafpont Destin 37541 EA A Ma | Z. G/L BY (Signature! BY (Sighariire) id WE D. Lord tz Charles W, Clary IIL, FAIA (Typed name) DATE: 4/23/2014 (Typed name) DATE: 4/29/2014 Okaloosa County Board of County Commissioners CONTRACTOR (Firm Hang) OWNER (Firat name) 1804 Lewis Turner Bid. Stge oh Alon Walton Beach, FL, 32547 ADDRESS ADDRESS... wf BY (Signature) BY (Signange, (/vped name) DATE: As Document G701/GMa™ ~ 1992, Copyright @ 1992 by The American Institue of Architects. AH rights reserved. WANING: This AIA” Docunentig protected hy byright Law ang hiternational Treatles, Unuathiorized ruproduction or dgtribution of this ANY Dour, Or any gartion of it. may 4 vaaull in gave: Hanet criminal panaltios, and will be prosecutad Le the muximum axtent possible under the Jaw. This document was produced by AIA software al 13:45:28 on 04/22/2014 under Order No.§773738723_1 which expires on 01/15/2015, and is not for resale. User Notes: (1496330608) Change Order 1 - Breakdown Additional work to remove asbestos-containing materials from existing structures at the existing Shalimar Courthouse Complex, as directed by the County Administrator. i. ARES Contracting Inc. Exhibit A dated 4/10/2014 $144,890.93 2, Southern Earth Sciences Exhibit B dated 3/11/2014 $13,050.00 3. Lord & Son Supervision Exhibit C dated 4/ 11/2014 $11,370.00 Subtotal] $169,310.93 Bond ,009117 $1,543,61 ne taal Total Change Order 1 $170,854.54 CHANGE ORDER FORM Date: A, es) Ca Contract No.: CVe-4OQg EM Change Order No.: 6) ‘Z Owner: __ OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS Contractor__Low Ay & Se / DACY DESCRIPIIO Seen AMOUNT Original Contract Price: = Yo4 ‘ blo] SO Nef change by previously authorized Change Orders: m eras) { Keke) A ‘ 54 Present Contract Price: * f StS f Sel. 54 This Change Order will (add/deduct): * 5 SS BES : 98 New Coniract Price: & I (84,49 ‘ 54 ANGE TO. CONTRACT TIM : Ze DESCRIPTION : : Origingl Contract Time: WW \ CQ “ Compl dues Kd Se) Original Substantial Completion Date: Avast (5 StS Net change by previously authorized Change Orders: . : This Change Order will (add/deduct): NY New Conjract Time: Noes ws) ‘ ealS New Substantial Completion Date: SEN \ yes WS APPROVALS REQUESTED BY: Daxtelbst un pate: Al@o(za\a. + ‘ PROJECT ENGINEER: DATE: } CONTRACTOR FZ pate eZ PP OWNER: thal COLA. Counks va hata K utero, SOLY This Change Order is an amendment to the Contract/Agisement befween

Download this text file with its original spacing ↓