CHANGE OWNER Oo
ORDER ARCHITECT oO
CONTRACTOR B
FIELD a
AlA DOCUMENT G701 (Modified) OTHER im)
PROJECT: New Office Addition at the Okaloosa
County Sheriffs Office in Shalimar CHANGE ORDER NUMBER: Four (4)
(name, addressy 50 2" Street DATE: 17 Nov 2014
Shalimar, FL 32579
TO CONTRACTOR: ARCHITECT'S PROJECT NO: 14007
{name, address)
Lord & Son Construction, inc. CONTRACT DATE: May 12, 2014
Post Office Box 1808
Fort Walton Beach, Fl. 32549 CONTRACT FOR: CM @ Risk Services
The Contract is changed as follows:
Deletion of cost for materials being purchased directly by Owner in accordance with attached breakdown,
which will be referenced on Application for Payment as Group 1.
Group 1 - Material (399,786.06)
Not valid until signed by the Owner and Contractor.
The original (Contract Sum) WaS.............0-cc:ccsessssrssesssssseseesasetrescenaenassssessenesnees $10,000.00
Net change by previously authorized Change Orders. ....ccscsecssoueeesen $1,472,114.00
The (Contract Sum) prior to this Change Order Was ...........ccccsccssserseenseesnesenceeatese $1,482,114,00
The (Contract Sum)) will be (decreased) by this Change Order in the amount of ($399,786.06)
$1,082,327.94
The new (Contract Sum) including this Change Order will be ...............:-cc:secesneseee
The Contract Time will be changed by: N/A
The date of Substantial Completion as of the date of this Change. Order therefore is: Per Contract
NOTE: This. summary does not reflect changes In the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized
by Construction Change Directive.
DAG Architects, Inc. Lord & Son Construction, Inc. Okaloosa County BOCC
Architect Contractor Owner
1223 Airport Road Post Office Box 1808 1804 Lewis Tumer Bivd., Ste. 100
Destin, FL 32544 Fort Walton Beach, FL 32549 Fort Walton Beach, FL 32547
Address a 7? yy iam Address
By. By, By,
Charles W. Clary lll, FAI Leven D. Lord Il Kelly Windes
Architect President Chairman
Date: lf /t Ul 4 Date: “i Wh, hh f Date:
AIA DOCUMENT G701 » CHANGE ORDER - 1987 EDITION « AIA - 1987 » THE AMERICAN INSTITUTE OF ARCHITECTS
1755 NEW YORK AVE, NW., WASHINGTON, DC. 20006 G701-1887 (Modified)
Okaloosa County
Sheriff's Office
41/17/2014
Payment Summary
LS. [County County | yangor Subcontractor / ree Pay App | _ Freight ' |) Sales Pay App Total with Tax PayApp |. Bing
PR# PO# Verdor # ra Freight) Line Item Amount : _ Tax Amount Line Item & Freight Line Item Change:
ee oe S Order:
LS-002 |21401776-2}21400293 | Kirby Bldg. Systems Lord & Son $211,250.00 CO4-A $4,752.00 $12,389.88 C02-2 $223,639.88 CO1-A 4
LS-003 |21401941 |21300731 |Mowrey Elevator Lord & Son $12,512.50 c04-B $0.00 $750.75 CO2-Z $13,263.25 co1-B 4
LS-004 21401961 |20800839 |Big Bend Rebar Lord & Son $22,085.00 C04-C $0.00 $1,325.10 C02:2 $23,410.10 CO2-G 4
LS-005 |21500090-1 |20300333 [Ferguson Enterprises Southern Plumbing & Gas $20,367.00 c04-D $0.00 $1,222.02 CO02-Z $21,589.02 c02-T 4
LS-006 }21500089-1|00015389 Fire Constrol Systems Harrington Electrical $6,395.00] CO4-E $0.00) $383.70 C02-Z2 $6,778.70 CO12-V 4
LS-007 |21500088-1 |002701 United Lighting & Supply | Harrington Electrical $26,500.00) CO4-F $0.00) $1,590.00 C02-Z $28,090.00 CO12-V 4
LS-008 |21500085-1 |002701 United Lighting & Supply | Harrington Electrical $6,950.00 C04-G $0.00 $417.00 CO2-Z $7,367.00 CO12-V 4
LS-009 |21500092-1]20800010 |Ready Mix USA Meso neete & $41,975.00] © CO4-H $1,575.00] $2,424.00) CO2.Z $44,309.00 |... CO2-F 4
LS-010 |21500147 |20300333 |Ferguson Enterprises H&T Contractors $17,691.56 CO4-I $0.00 $1,061.49 02-2 $18,753.05 c02-D 4
LS-011 |21500212-1 |012512 Warren Hollow Metal Doors|Lord & Son $34,060.00 CO4-J5 $0.00 $2,043.60 C02-2 $36,103.60 CO2-M 4
$399,786.06 $6,327.00 $23,607.54 $423,393.60
Total Submitted for Payment
Page 1
“ef : _ e-
PURCHASE
OKALOOSA COUNTY ORDER NO... 22402776-2
BOARD OF COUNTY COMMISSIONERS gE YO. 1
. SEND. ALL INVOICES TO: FLORIDA SALES TAX EXEMPT
OKALOOSA COUNTY FINANCE DEPARTMENT #85-8013105818C-2
302 N Wilson Street, Suite 203 FEDERAL TAX IDENTIFIC .
amas ‘ATIO}
Crestview, FL 32536 us9-6000765
|
21400293 : FAX: 850-875-8003 OKALOOSA COUNTY
ASSOCIATED BUILDING SYSTEMS, INC FACILITY MAINTENANCE
D/B/A KIRBY BUILDING. SYSTEMS LLC 5489 OLD BETHEL ROAD
124 KIRBY DRIVE/ PO BOX 390 CRESTVIEW FL 32536
PORTLAND TN 37148
ATTN: PAM
ORDER DATE; 08/14/14 suver NATHAN : REQ # R1401961 Reg. paTe:08/21/14
TERMS: NET 30 DAYS For: DESTINATION DESC:.. SHERIFF'S BLDG.
OKALOOSA COUNTY CONTRACT # C14-2184-FM.
OL 1.00 EA PRE-ENGINEERED METAL BLDG. 206498.0000 206,498.00
wm Pree ht ( Al}, 250.°°
DEPT NO. ACCOUNT AMOUNT PROJECT CODE] PAGE TOTAL “R06; 79S 00
3160 562224 -00
3160 562224 206,498.00 LS-002
Aq Bid
2. Ltn Col-A ty Coy-A ; COa-z AUTHORIZED/AP! CRED SIGNATURE
<a
) PURCHASE ORDER CHANGE REQUEST
Project: Okaloosa County Sheriff's Office Addition
Contract #: C14-2184-FM ;
Owner: Okaloosa County Board of County Commissioners
rby Building Systems.
PO Box 390, 124 Kirby Drive . 21400293 1 21401776
Portiand, TN 37148 ,
Attn: Robert Hodges
Change Order 1 per attached Change Order Confirmation 1,253 .00
dated 24 June 14
$205,245 .00
0.00 .00
7,253.00
206,498.00
a ae 475]2.°
Subcontractor: Lord & Son Construction, Inc. ; 2 IL, SO. 90
19 David Street.
Fort Walton Beach, FL 32547.
850-863-5158 (P)-
850-862-4904 (F)
dave@lordandson.com
LD Signature Lord & Son Construction, Inc. Signature
] Wine Zhowns afes| [anid Abussiclerah Geel 4
Facllity Maintenance Director Rurchasing Manager
Donel L. emed__ Zan fedbveal-
“Print Name Print Name
esaney one KIRBY Pe fet
veer oaoe
a 7 # PP NW
88/28/2814 66: 36 8082333460 KIRBY BUILDING SYS PRE @1
CHANGE ORDER CONFIRMATION
PORTLAND, THATIGG fm
| TOr DAVE BURLESON aT? ae
Bobert Hodges
PROM: Robert _ 40880: K1GH0279A
RATE Sauna ™
PROECY: SHERIFF OFFICE ChanION CRIDER NC: 4
nuLoeR: LORD & SON CONSTRUCTION ING — —
AnoRges: PO BOX 1808 - GIGCRNAL CONTRACT Prati:
a . GH, FL 32649 — ramnouse.og) eriom
Fax #: Geer ee CHANG, AbD { DENUCT
>
*
‘The width of BUILDING FONE Is 41-4” out to cut ste! line.
‘The length of BUILDING ONE In 191-6 474” out im out steel ling,
The bay spackig of BUILDING HONG be 25-5 410, 2670", (2)@ 27-0", & 20-8 10",
‘The width of BUILDING #2 is 26°.0" autte outatea! Brie.
‘The fengtts of EIUILDING #2 le 10°C" out to out steal ine,
The width of BUILDING #3 in 21'.0" outta out eteet ine,
| ‘The length of BUILDING 42 ie 10°0" outte out atee tine,
All wind column spacings (on all three hullelings) bs Kirby's option.
‘The elevator shalt wilt be in an 8° OMU wall.
Gantinued on Page 2
* =
j
| Shipmort after this date may inaur art locranke in the contract priod, Batore change wal be Unplemented, thes chang
order nust be signed by the buyer, Delivery indicated abown ‘Or may not apply to cee: matedlais, if involved,
PRC MAY
AFFECTED
Jan More =
/—Krom: Hodges, Robert (KBSTN) <rhodges@kirbybuildingsystems.com>
vent Wednesday, August 20, 2014 1:19 PM
To: Jan More
Subject: RE: Job Number: K14N0272 Job Name: SHERIFF OFFICE (21)
Importance: . High
Jan,
Please seé the below chart. | will call you in a few minutes.
§ 209,997.00 _| original contract amount with freight
S (4,752.00) freight amount
$. 205,245.00 _| contract amount without freight
$ .. 1,253.00 change order #one.amount
updated contract amount without
$ 206,498.00 | freight | >
5 47/5200 freight amount
§ 211,250.00 _ | updated contract amount with freight
fhank you,
~-Robert Hodges / Customer Service Representative
Kirby Building Systems a Nucor Company /P.0. Box 390, 124 Kirby Drive Portland, TN 37148
615-745-6034 / Cell: 615-745-9KBS (9KBS) / Skype: rhodges.csr / rhodges@kirbybuildingsystems.com
o
OKALOOSA COUNTY PURCHASE
: ° ORDER NO 21401941
BOARD OF COUNTY COMMISSIONERS DROE NO. 4
SEND ALL INVOICES TO: FLORIDA SALES TAX EXEMPT
OKALOOSA. COUNTY FINANCE DEPARTMENT #85-8013105818C-2
302.N Wilson Street, Suite 203 FEDERAL TAX IDENTIFICATION
Crestview, FL 32536 : +#50-6000765
21300731 OKALOOSA. COUNTY
MOWREY ELEVATOR CO OF FL INC FACILITY MAINTENANCE
4518 LAFAYETTE ST 5489 OLD BETHEL ROAD
MARIANNA FL 32446 CRESTVIEW FL 32536
ATTN:
orper vate: 09/16/14 suver’ NATHAN: REGQ# Ri402149 ‘Rug. pare: 09/29/14
teRMs:. NET 30 DAYS Fos DESTINATION bES:. SHERIFF OFFICE
Lord & Son’s Corstruction
Project# 1403
Contract# Cl4-2184-FM
OL 1.00 EA PISTON 4379.3800 4,379.38
02 1.00 EBA CAR FRAME, PLATFORM, GUIDE RAIL, RAIL 3128.1200 3,128.12
BRACKETS
03 1.00 HA PUMP UNIT. 2502.5000 2,502.50
04 1.00 EA ENTRANCES 2251.2500 1,251.25
05 1.00 EA CAB, DOORS, CONTROLLER 1251.2500 1,252.25
San > sy} j v ‘,
mi
DEPT NO. ACCOUNT, AMOUNT PROJECT CODE PAGE TOTAL $§12,512.5
3160 562224 12,512.50 IS-(b%
Re
Bl,
fy ke HUEY
!
\
. 7 Je Col-B, Co4-B ; Cop- = AUTHORIZED/APPROVED SIGNATURE
— Purchase Requisition
for ODP Materials
Date: 8/12/2014 . PR #: LS-003 POH...
(To be completed by Lord & Son) (To be completed. by. Qwner)
faoiect Name: Okaloosa County Sheriff's Office Addition Ship To Address:
‘\NBject No.: 1403 Contract #: C14-2184-FM 50 2nd Street
VENDOR -PLEASE SEE PR-PAGE 2 FOR FURTHER INFORMATION Shalimar, FL 32579
Delivery Date: TBD
Owner Information -
Name: Okaloosa County Board of County Commissioners Phone: 850-689-5790
Address: 1804 Lewis Turner Blvd. Suite 100 Fax: 850-689-5630
Fort Waltn Beach, FL 32547
Contact: Don Turner, Director of Facilities Maintenance Email: facinfo@co.okaloosa.fl.us
Construction Manager (Contractor) Information
|Name: Lord & Son Construction, Inc. Phone: 850-863-5158
Address: 19 David Street Fax: 850-862-4904
Fort Walton Beach, FL 32547
Contact: Dave Burleson Email: dave@lordandson.com
Subcontractor Information
Name: Lord & Son Construction, Inc. : Phone: 850-863-5158
Address: 19 David Street Fax: 850-862-4904
4 Fort Walton Beach, FL 32547
oe Dave Burleson Email: dave@lordandson.com
Vendor Information ’
Name: Mowrey Elevator Phone: 850-526-4111
Address: 4518 Lafayette Street Fax: 850-482-2482
Marianna, FL 32446
Contact: Shannon Young Email: shannon@mowreyelevator.com
Owner direct purchases shall not relieve the subcontractor of delivery schedule or any other contract requirements under any circumstances. Receipt
and acceptance of materials will remain the responsibility of the subcontractor. The ODP program is for tax savings purposes ONLY.
Special Instructions or Directions
BRIEF DESCRIPTION OF MATERIALS TOTAL AMOUNT
Holeless Hydraulic Elevator PO Amount $12,512.50
Associated Sales Tax (6%) $750.75
Freight $0.00
Total with Tax & Freight $13,263.25
(Attach detailed material price list or vendor/supplier quote which equals PO Amount shown here)
Subcontractor’s Authorized Signature: Kaw = Mire
Printed Name:
Lord & Son's Authorized Signature:
Printed Name: Dave Burleson.
; jd
PURCHASE
i ; OKALOOSA COUNTY ORDER NO, 22402962
BOARD OF COUNTY COMMISSIONERS OnE HO. 1
: SEND ALL INVOICES TO: FLORIDA SALES TAX EXEMPT
! OKALOOSA COUNTY FINANCE DEPARTMENT 85-8013 105818C-2
I 302 N Wilson Street, Suite 203 FEDERAL-TAX IDENTIFICATION
Crestview, FL 32536 #50-5000765
|
20800839 FAX: 850-875-8003 OKALOOSA. COUNTY
i BIG BEND REBAR, INC. FACILITY MAINTENANCE
i ONE CORPORATE COURT 5489 OLD BETHEL ROAD
i
‘ QUINCY FL 32351 CRESTVIEW FL 32536
ATTN:
| orperpaTe: 09/19/14 svver NATHAN REQ.#: R1402156 reopare: 10/01/14
Terms: NET 30. DAYS Fos: DESTINATION : DESG:
UNEP P
Sheriff Admin Building-50 2nd Street, Shalimar
Owner Direct Purchase
Quote#14-411B
Project#1403
04
; *“@ontract# C14-2184-FM
6. o1 1,00 EA CONCRETE REINFORCED STEEL , 19995.0000 19,995.00
So PACKAGE-APPROX
: 23.25 TON ,
02 1.00 EA. MASONRY REINFORCED STEEL 1290.0000 1,290.00
PACKAGE-APPROXIMATELY 1.5 TONS :
03 1.00 EA DELIVERY FUEL SURCHARGE 200.0000 200.00
04 15.00 EA 6X6-W2.9/W2.9 WELDED WIRE FABRIC 40.0000 600.00
DEPT NO. ACCOUNT AMOUNT PROJECT CODE PAGE TOTAL $ 22,085.00
3160 $62224 22,085.00 eebag 4
| i
a il
ae po
= Atipe Coase CO¢-C Coa-z2 AUTHORIZED/APPROVED SIGNATURE
? >
C ] Printed Name:
Purchase Requisition
for