READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 01-24-12 regular — reading text
Part 7 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31235-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
MEMORANDUM
To: Robert T. Meams, City Manager
From: Jeff Peters, Recreational and Cultural Services Director
Date: January 24, 2012
Subject: Pre -Fabricated Restroom Facility
001 - 1010 -572- 6214 in FY 2011 - 12 for the replacement of the restroom facility at
Garners Beach Park.
33. The old restroom was demolished and removed from the site on January 6, 2012.
4. RECOMMENDATION:
4. 1. In accordance with the City' s Purchasing Polices & Procedures, Staff respectfully
requests City Council authorization to piggyback off of Leon County' s Restroom Facility ITB,
utilizing Boating Improvement Grants and funding budgeted in FY 2011 - 12, to purchase a
pre- fabricated restroom facility through CXT Concrete Buildings.
ATTACHMENTS:
2012 CZ Quotcl ( PDF)
cortcxpic ( PDF)
Diagram Specs ( PDF)
Cortcz Specsl ( PDF)
SIGNATURE BLOCK:
Completed 01/ 12/ 20124:44 PM
Jeff Peters
Completed 01/ 13/ 2012 8: 47 AM
Finance
Completed 01/ 13/ 20124:01 PM
Carole Jones
Completed 01/ 18/ 201211: 02 AM
City Manager
City Council Pending
Packet Pg. 30
8. 2.
Quote k: JCHA4000SI. 4
MailingIncorporated,
Address: an Co.
3808 North Sullivan Road Bltlg.
380 Bldg. ft7
Inc. an L. B. Foster Company Spokane Valley, WA 99216
Phone: ( 800) 696 -5766
Fax: ( 509) 928 -8220
To: City of Fort Walton Beach 01105/ 2012
Date:
132 Jet Drive
Fort Walton Beach, FL 32548
Attention: Jeffrey Peters
Phone: ( 850) 833 -9576
Fax: ( 850) 833 -9670
Per Building
Our quotation for the Cortez Flush Building building is as follows: 36, 522. 95
Cortez double flush toilet building with simulated rib metal roof and barn veri wall $
texture, two lone color, marine package, three 16 -guage galvanized steel doors and r
frames, vitreous china plumbing fixtures ( 2- lavatories, 2 -water closets), 2 - Fast Air hand
dryers, two 3 -roll toilet paper holders, two exhaust fans, three GFI outlets, three floor
drains, two se; mirrors, ADA grab bars, ADA signs, one hose bib in chase area, ADA re
frost free drinking fountain, motion controlled interior lights and photo cell controlled E
exterior lights. p
Freight
36,522.95 y
a
v
Freight FOB Destination. Price includes delivery, off -loading and setting the building on a Customer
mar
FOB:
prepared pad and utility stub in the Fort Walton, FL area. Final hook -up of utilities included. al8al
u
Terms: Net 30 with Credit Approval
a`
Shipment: Within 90 days ARO
se
Notes: Options: Split face block wall texture $ 2000. Programmable floor lock system $ 2400. Electric hastetl
rest -room $ 1550.
v
Sales tax not included o
Number of Units: _ Q
This quotation is subject to the conditions on the attached sheet and the L. B. FOSTER COMPANY NUN
terns hereof shall constitute the exclusive agreement of the parties and all p
N
cre flicang or additional terms In Buyer a purchase Order or any Other such
documents of Buyer shall have no force or effect By d
Jeff Chambers E
20 JChambers Ibfosteccom
Accepted this day of m
0.v (
Customer Name) Q
Packet Pg. 31
8. 2. a
Quote M: JCHA400013I
CONDITIONS OF SALE
1. Taxes
Prices exclude all FedemVStatalLOCaI taxes. Tax will be charged where applicable Ifcustomer is unable to provide proof of exemption.
Payment Terms
Payment to CXT by the purchaser shall be made net 30 days after the submission of the invoice to the purchaser. Interest at a rate equal to the lower
of (i) the highest rate permitted by law', or (ill 15% per month will be charged monthly on all upped invoices beginning me 35th day (includes 5 day
grace period) from the date of the invoice . Under no circumstances can a retention be taken and purchaser shall pay the full invoiced amount without
offset or reduction. These terms are available upon approval of credit If CXT intimates legal proceeding to collect any unpaid amount, purchaser shall
be liable for all of CXT's costs, expenses and attorneys fees associated with such litigation, including the fees and costs of any appeal.
Quotation Term
This offer is subject to acceptance within 60 days from the date of this quotation, After that time prices are subject to change without notice.
Drams
Prices do not include any documentation other than standard drawings, packing lists, and invoices, unless otherwise stated in quote. Special
documentation. reports, or submittals can be supplied at an additional cost. If additional engineering, engineering seals, state approvals, drawings, or
insignias are required additional charges may incur.
T
Delivery
Delivery will be scheduled immediately upon receipt of written customer approval of all building submittals building worksheets) and signed u.a
contmoupurchase order. In the event delivery of the buildings ordered istare not completed within 30 days of the agreed to schedule through no fault E
Of CXT, an invoice for the full contract value ( excluding shipping and installation costs) will be submitted for payment, the terms of which will be as per
item 2 in our quotation. Delivery and Installation charges will be invoiced at the time of delivery and installation. Should the delivery and installation O
costs increase due to changes in the delivery period, this Increase in cost will be added to the price originally quoted, and will be subject to the
contract payment terms. In the event that the delivery is delayed more than 45 days after the agreed to schedule and through no fault of CXT, then in
addition to the remedies above, a storage fee of' G % of contract price per month or pad of any month will be chargetl.
Fuel Costs
Fuel costs for crane and freight have been quoted at fuel prices furnished at the time of quotation. If at the time of delivery and installation these costs
Km9vUa
m
have risen, CXT reserves the right to adjust the freight and crane costs to reflect the fuel costs forma d at the time of delivery.
