Okaloosa County BOCC — January 6, 2015 — Agreement, Attachments and Exhibit — reading text
Part 4 of 6. These parts divide the reading text for browsing; they are not the source document's page numbers.
Agreement, Attachments and Exhibit — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Date:
Bob Ballard, DEP Grant Manager
FEID No.: 59-6000765
Approved as to form and legality:
DEP Attorney
List of attachments/exhibits included as part of this Agreement:
Letter/
Specify Type Number Description (include number of pages)
Attachment A Project Work Plan (3 Pages)
Attachment B Disbursement Request Package (3 Pages)
Attachment C Contract Payment Requirements (1 Page)
Attachment D Progress Report Form (1 Page)
Attachment E Reserved
Attachment F Reserved
Attachment G Special Audit Requirements (5 Pages)
Revised 7/14
DEP Agreement No. LP46041, Page 12 of 12
ATTACHMENT A
PROJECT WORK PLAN
OKALOOSA COUNTY
LP46041
Project Title: Lake Pippin Area Sanitary Improvements
Project Location:
Niceville, Florida, Okaloosa County
Lake Pippin Development: 30°27'27.40"N / 86°24'12.48"W
North Lakeshore Development: 30°27'33.08"N / 86°24'36.27"W
Water Bodies Impacted: Gulf of Mexico, Choctawhatchee Bay & Pippin Lake
Project Background:
The Lake Pippin area is one of the larger outstanding coastline residential areas not on public
sewer in Okaloosa County and is located directly on the north shore of Choctawhatchee Bay.
This area in Okaloosa County Water and Sewer’s (OCWS) service area, and residents are
connected to OCWS’ public water system. There are approximately 125 homes with septic tanks
and drain fields. The elimination of older septic tank systems has long been recommended due
to the introduction of wastewater microbes and pathogens into the environment. These
organisms have short circuited the treatment process in the leach field and are directly being
introduced into the environment. This is particularly evident in communities that lie beside
coastal waters that are subjected to high ground water and tidal flushing. This project will
provide immediate removal of a potential source of pollution that is adjacent to coastal beaches
and bayous; increase overall water quality and promote sea grass health. Ecosystem services
related to human usage will also be increased as well as help reduce the public health risk.
Coastal eutrophication has long been documented to have negative effects on near-shore
ecosystems. The elimination of raw sewage entering the ground in these areas will serve to
reduce pollutant runoff into both the Choctawhatchee Bay and Gulf Mexico.
Project Description:
The overall project will include the construction of a new sanitary sewer collection system for the
Lake Pippin and North Lakeshore developments that are currently served by residential septic
tanks. Specific tasks associated with this funding includes land/easements acquisition, alternatives
evaluations, project design & management, and construction. This is a $4M project with DEP
funding in the amount of $2M. The remaining $2M is unfunded and will be applied for in the
future. With this $2M DEP funding, we plan to complete all the “soft costs” of the project,
construct the backbone or foundational infrastructure of the collection system (such as large lift
stations, transmission mains, and treatment capacity), and construct a portion of the collection
system needed for the 125 residential lots/homes.
Revised 7/14
DEP Agreement LP46041, Attachment A, Page 1 of 3
Task 1: Engineering Evaluation Services
Deliverable: Copy of contract and final summary report.
Timeline for completion: September 30, 2018
Budget Information:
Contractual: Professional Services $30,000
Performance Standard: The DEP Grant Manager will review periodic requests for funds for the
deliverables to ensure they are eligible for reimbursement.
Task 2: Land and/or Easement Acquisition
Deliverable: Copy of appraisals, deeds, easements, titles, and legal descriptions.
Timeline for completion: September 30, 2018
Budget Information:
Land: 100,000
Performance Standard: The DEP Grant Manager will review periodic requests for funds for the
deliverables to ensure they are eligible for reimbursement.
Task 3: Engineering Design and Technical Services During Construction
Deliverable: Copy of contract, plans and specifications, DEP permit, and engineer’s
disbursement requests.
Timeline for completion: September 30, 2018
Budget Information:
Contractual: Professional Services $250,000
Performance Standard: The DEP Grant Manager will review periodic requests for funds for the
deliverables to ensure they are eligible for reimbursement.
Task 4: Construction
Task 4a: WRF construction expansion/capacity expansion charges
Deliverable: Copy of contracts, bid tabulations or design/build request for proposals,
contractor’s schedule of values with supporting documentation, and photos of completed work.
Timeline for completion: September 30, 2018
Budget Information:
Contractual: Construction $400,000
Performance Standard: The DEP Grant Manager will review periodic requests for funds for the
deliverables to ensure they are eligible for reimbursement.
Task 4b: Collection system construction
Deliverable: Copy of contracts, bid tabulations, contractor’s schedule of values with supporting
documentation, and photos of completed work.
Timeline for completion: September 30, 2018
Budget Information:
Contractual: Construction $250,000
Performance Standard: The DEP Grant Manager will review periodic requests for funds for the
deliverables to ensure they are eligible for reimbursement.
Revised 7/14
DEP Agreement LP46041, Attachment A, Page 2 of 3
Task 4c: Collection system construction performed by County staff
Deliverable: Time cards showing employees’ hourly rates including fringe, invoices for
purchased materials and equipment, equipment time and rates, and photos of completed work
Timeline for completion: September 30, 2018
Budget Information:
Salaries: $180,000
Fringe Benefits: $90,000
Materials/Other Expenses: $700,000
Performance Standard: The DEP Grant Manager will review periodic requests for funds for the
deliverables to ensure they are eligible for reimbursement.
Total Budget by Task: The tasks identified here should agree with the tasks identified and
described above. Identify the tasks as follows: 1a, 1b, etc.
Local Funds and Source
Tasks DEP Funding Local Funds Source of Funds
Engineering Evaluation
1 Services $30,000
Land and/or Easement
2 Acquisition $100,000
Engineering Design and
Technical Services During
3 Construction $250,000
WRF expansion/capacity
4a expansion charges $400,000
Collection system
4b construction $250,000
Collection system
construction performed by
County staff:
Salaries $180,000
Fringe Benefits $90,000
4c Materials $700,000
Total: $2,000,000
Project Total: $4,000,000 (Additional funding to be applied for)
The FY2014-15 GAA did not require a match for these projects.
Revised 7/14
DEP Agreement LP46041, Attachment A, Page 3 of 3
ATTACHMENT B
Disbursement Request Package
Legislative Projects (LP) Grants
1. Grantee/Recipient Okaloosa County
2. Project Number LP46041 Date of Request
3. Disbursement Request Number Required Match %
4. Type of Request: Partial Final
5. Federal Employer Identification Number
6. Task/Deliverable No.
7. Mail EFT Send Remittance to:
Disbursement Details
(cumulative amounts rounded to the nearest dollar)
Amount this Total
NOTE: Can only claim expenses in approved budget. Request Cumulative
1. Salaries
2. Fringe Benefits
3. Contractual Services
4. Supplies/Other Expenses
5. Land
6. Total
7. Disbursements previously requested
8. Amount Requested for Disbursement (line 6 minus 7)
** SUBMIT ONE ORIGINAL COPY OF THIS FORM AND SUPPORTING DOCUMENTATION FOR
EACH DELIVERABLE TO: **
Florida Department of Environmental Protection
State Revolving Fund Management MS 3505
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
or email your request to:
SRF_Reporting@dep.state.fl.us
DEP Agreement No. LP46041, Attachment B, Page 1 of 3
Grant Manager’s Certification
of Disbursement Request
I, ,
(name of Grantee’s Grant Manager designated in the Agreement)
on behalf of , do hereby certify that:
(name of Grantee/Recipient)
1. The disbursement amount requested on Page 1 of this form is for allowable costs for the project described
in Attachment A of the Agreement;
2. All costs included in the amount requested have been satisfactorily purchased, performed, received, and
applied toward completing the project; such costs are documented by invoices or other appropriate
documentation as required in paragraph 3D;
3. The Grantee has paid such costs under the terms and provisions of contracts relating directly to the
project; and the Grantee is not in default of any terms or provisions of the contracts;
4. If funds were advanced, all funds received to date have been applied toward completing the project; and
5. All permits and approvals required for the construction which is underway have been obtained.
( Signature of Grant Manager)
(Date)
DEP Agreement No. LP46041, Attachment B, Page 2 of 3
Engineer’s Certification
of Disbursement Request
ONLY SUBMIT IF CONSTRUCTION IS PART OF THE PROJECT
I, , being the Professional Engineer retained by
(name of Professional Engineer)
, am responsible for overseeing construction of the
(name of Grantee/Recipient)
project described in the Agreement and do hereby certify that:
1. Equipment, materials, labor, and services represented by the construction invoices have been satisfactorily
purchased or received and applied to the project in accordance with construction contract documents filed
with and previously approved by the Department of