April 15, 2014

Okaloosa County BOCC — April 15, 2014 — Action Item Printout

Okaloosa County Board of County Commissioners action item printout for the April 15, 2014 meeting. Official document preserved from the county IQM2 public portal, with a searchable OCR text layer.

FILED WITH

About this source

Action Item Printout from the Okaloosa County BOCC meeting of April 15, 2014 (IQM2 meeting #1197). Original portal label: Action Item Printout. Preserved as a historical public record; part of the meeting linked as a related source.

Original publication
Action Item Printout
Date
April 15, 2014
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Machine produced / unreviewed — machine-extracted, not yet human-corrected
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Action Item Printout (PDF)

Original PDF as published on the Okaloosa County IQM2 meeting portal.

PDF · 345.0 KB

Download ↓

Machine-extracted text — 128-Action Item Printout.pdf

Text extracted on 2026-10-31 from 128-Action Item Printout.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.

Text · 3.4 KB

Download ↓

Full text

Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: April 15, 2014 TO: Honorable Chairman and Members of the Board FROM: Jeff Littrell SUBJECT: Polyengineering Task Order 115 Revision 2 DEPARTMENT: Water and Sewer BCC DISTRICT: 1 STATEMENT OF ISSUE: OCWS staff requests BCC approval of Revision 2 to Polyengineering Task Order 115 which provides for design, bid preparation and construction management services for Del Cerro II public water supply well project. OCWS has requested the services of Polyengineering under Task Order 115 per the terms of Contract #C05-1175-WS. Revision 2 (attached) adds $27,592.00 in scope of work to the current Task Order amount, for a new Task Order total of $166,432.00. BACKGROUND: Polyengineering Task Order 115, for $128,702, was approved by the BCC in February 2012. Polyengineering’s overall scope of work is to furnish engineering design, bid documents, and construction phase services for a new public supply well, Del Cerro II. Layne Christensen Company was the low bidder of the project and is under contract with Okaloosa County for the construction of this project. During the construction of the test well, a lower than expected yield was observed and the water bearing formation was producing sand in sufficient quantities to be of concern. Extensive discussions and evaluations were made on whether to further pursue or abandon the project; this additional work was covered in Polyengineering Task Order 115, Revision 1 for $10,138.00. The economics of abandoning the project were found untenable and despite the problems observed with the test well, it was believed a permanent well could be developed through several possible avenues (i.e. gravel pack, above-ground filter, or below-ground filter). The permanent well has subsequently been drilled and results obtained that prove a gravel pack and screen/filter will be required. The Contractor has submitted a change order for this work (Change Order #3 on this same BCC Agenda). Because of future maintenance on a gravel packed well, the well head needs to be housed outside of the on site building to minimize future well rehab costs. For example, the well may need to be re-chlorinated or acidized about 10 years from now. Since the well head was originally designed to be inside the building, changes are necessary in the engineering and architecture plans to move the well head outside of the building. Moving the water supply well head outside the building will necessitate both a revision to the previously approved site plan and also the redesign of the building to be in line with an outside well head configuration. In addition to new architectural drawings, the electrical and mechanical drawings will also require revision. Also, the Contractor, via his Change Order #3, requests an additional 4-month time extension. Additional time/costs are allotted within this task order revision to continue administering the project and provide continued on-site observation. Task Order 115 Revision 2 adds $27,592.00 in scope of work as outlined above. OPTIONS: Approve or deny. RECOMMENDATIONS: OCWS requests BCC approval to authorize the Chairman to execute Polyengineering Task Order 115 Revision 2, adding $27,592.00, for a total not to exceed amount of $166,432.00 on the Task Order. RECOMMENDED BY: APPROVED BY: Ernie Padgett, County Administrator

Related sources

Citation & reuse

“Okaloosa County BOCC — April 15, 2014 — Action Item Printout.” April 15, 2014. Action Item Printout. Crypt of Echoes evidence ID LED-2026-b3d274ea1c724918ad7a5bfb38f386d5. https://cryptofechoes.com/evidence/LED-2026-b3d274ea1c724918ad7a5bfb38f386d5. Accessed [date].

Public record of Okaloosa County, Florida.

Technical archive record ↓