Wheeler St. Waynel Cir. Okahatchee Cir. 440 $ 5, 970
East Miracle Strip Alconese Ave. Brooks St. First St. 600 $ 8, 140
3, 250 $ 48, 060
2008/ 09 Ferry Park Stacy Cir. Okaloosa Rd. Okaloosa Rd. 900 $ 12, 150
Ferry Park Laurie Dr. Hollywood Blvd. Okaloosa Rd. 750 $ 10, 125
Choctawhatchee
Ferry Park Kepner Dr. Okaloosa Rd. Rd. 1, 700 $ 22, 950
3, 350 $ 45, 225
The total anticipated cost for both of these projects is approximately $ 1, 025, 000. Adding these two
to the
projects proposed debt issuance at this time coincides with the program objectives and makes
the best sense for the City. By adding the two projects, the City reduces a large annual expenditure
and spreads the cost of the improvements out over the useful life of the infrastructure. Using this
approach, future utility customers will pay their proportionate share of the improvements
throughout the 25- 30 year debt period. In addition, the proportionate share of the debt service for
these two projects is significandy less than the annual budgeted expenditures, thereby freeing money
for other capital projects or reducing the overall budget.
3
Recommendation:
Request authorization to include the next five years of sewer line rehabilitation and replacement of
2_1/ inch water lines capital improvement projects in the proposed Series 2005 Utility Revenue
4
Bonds as outlined in the backup report. The total amount of these projects is estimated at
1, 025, 000 and have a useful life of 25 years or greater. The addition of these projects is authorized
under the debt funding methodology previously approved by City Council through resolution 04- 33.
OJ- J- OS-
Date
2/ 3/ 0,S-
Date
Reviewed and Concur:
J rl
2{;
Manager Date
Attachments:
1. October 25, 2004 Staff Report
2. Resolution 04- 33
4
City of Fort Walton Beach
Memorandum
To: Joyce Shanahan, City Manager
From: i
Michael J. Burton, Finance Directorr-
Subject: Water and Wastewater Improvements - Intent to Debt Finance
Date: October 25, 2004
BACKGROUND:
The City of Fort Walton Beach owns and
operates water and sewer facilities for the benefit of its citizens
and to support economic' growth in southern Okaloosa
County. The City began development of its water
and sewer infrastructure in the early 1950s to service the needs of a small and centralized.
population hub
along San~ Rosa Sound. AB the area grew and corporate limits expanded,. the demand for additional
infrastructure increased. Today, the City' s water and sewer
utility services the demand of over 20, 000
people in a distribution network bounded by the City of Mary Esther to the west, Santa Rosa Sound to the
south, Choctawhatchee Bay to the east, and
unincorporated areas ofOkaloosa County t~ the north.
The City' s water and sewer facilities have not
undergone major expansion or renovation in more than 20
years. The last water well constructed (Well # 11) began service in 1982 and the wastewater treatment
plant opened for service in 1980. Other than routine maintenance and the addition of a reuse system,
there have been no substantial modifications to the
water: and sewer system. While growth projections
limit our need to expand water production and increase
sewage treatment capacity, the City must continue
to plan for future needs and address the concerns of an
aging infrastructure. Realizing this need, Council
directed staff to secure consulting services for
variousplani1ing, designing, and,engineering studies for the
City' s water and sewer infi'astructure. The FY 2004- 05 Capital Improvements Plan identified two major
projects:
Phase One - Water Transmission & Stora2:e
The City Council elected to reprioritize the
proposed water system improvements during a Special
Council Meeting held on September 5, 2000. Council
approved funding for the Water Transmission
and. Storage project during the November 28, 2000
regular Council Meeting. Currently, the
engineering and design work for this project is complete.
The Water Transmission and Storage
project is the most critical improvement needed for the City' s
water system at this time. The ability to move water from the City' s
largest productionzone in the
golf course area is vitally important in the event some or all of the coastal wells are lost to saltwater
intrusion. While we can produce the water needed from the well network in this area, we are
restricted in our ability to deliver water due to the
piping and storage restrictions previously noted.
Additional limitations in elevated storage capacity will occur once the elevated
storage tank located at
Well # 3 is converted to a reuse water storage tank as
part of the HurlburtJFWB Reuse Water Line
project scheduled to begin later this year. The Water Transmission and Storage project will correct
these deficiencies as well as enable the City to move more water from north to south if there is a need
in the future to develop the sand and gravel
aquifer as an alternative supply. Lastly, the two existing
downtown elevated storage tanks must be removed from service or renovated.
The Water Transmission and Storage project will improve the system by accommodating more
elevated storage in both the north ~ d south zones and by providing redundancy in the distribution
piping between the two areas. The proposed 18" water main linking the north zone with the south
zone will provide this needed
redundancy and allow the continued movement of water should we lose
the existing 16" water, line along Cinco Bayou Bridge to catas1rophic failure. Lastly, the proposed
project will eliminate two aging and smaller elevated water storage tanks in the downtown area which
will be replaced by a new pedestal type elevated tank with increased storage capacity. Currently, we
have ' delayed the needed maintenance to the two older tanks in anticipation of their expected
replacement.
Fabre Engineering' s ( FEl)construction cost estimate for this project is approximately $ 3, 001, 200
which does not include a contingency factor or non- construction related costs. The estimated cost for
the total project including a 5% contingency plus non- construction related costs is approximately
3, 251, 260. .
Phase Two - Wastewater Treatment Plant UD2rades
The City' s wastewater facility was built in 19,80 to replace an aging facility. Since 1996, the City has
invested nearly $ 1, 000, 000 in its 1reatment facility through a series of Capital Improvement
Programs. This investment was required in order to maintain operations and environmental
compliance with the FDEP. If major renovations are not undertaken in the next few years, the facility
will require a similar investment in order to sustain operations. The City' s wastewater treatrilent
facility is aging and the secondary 1reatment process contiIiues to experience mechanical failures
which severely hamper the facility' s reliability. During the May 28, 2002 Gity Council Meeting, ,
Council awarded a Wastewater Treatment Plant ( WWTP) Facilities Plan to the engineering firm of
Hartman & Associates Incorporated (HAI). The Facilities Plan was a comprehensive evaluation of
the City' s wastewater facility and provided recommendations ,for improvement and renovation. The
WWTP Facilities Plan was completed in April 2003 and was presented to Council during the April
29, 2003 Council Workshop. Subsequent adoption of the final Facilities Plan by Council followed
during the May 13, 2003 regular Council Meeting.
Based on Council' s formal adoption of the Facilities Plan, 'our goal is to
replace the aging secondary
process with a new Oxidation Ditch 1reatment facility. In addition, the plan calls for renovating the
existing ancillary equipment for a total plant rehabilitation and renovation package. Together, these
tr;leasureswill reduce a growing operation and maintenance budget for the facility and aid in reducing
annual capital outlay ,expenditures. As a side benefit, the proposed facility
places the City in a better
position for meeting more stringent discharge standards being considered by the Environmental
Protection Agency and the FDEP.
Current estimates place the cost to dismantle the exisfug1reatment system (Rotating Biological
Contactors) and construct a new Oxidation Ditch facility at approximately $ 4, 793, 750. This estimate
includes approximately $ 531, 250 in renovations to ancillary equipment. However, these estimates
are considered rough approximations since actual engineering and design work is not yet complete.
DISCUSSION:
The preliminary cost estimate of these projects is approximately $ 8, 045, 010. Staff is also exploring the
feasibility of investing an additional $ 1, 000,000 ( over a three to five year period) for ongoing inflow and
infiltration improvements. The planned funding methodology is long-term debt over a twenty- five or
thirty year period. In addition, certain bond covenants may require the establishment of a cash reserve
fund, estimated in the $450, 000-$ 500, 000 range.
Page 2
The design work is complete for the water improvements and is ready to bid. The City' s