TASK ORDER APPROVAL FORM
PONTRACT #: C-O5-1117-WS
: 7 ; foe > . ~~ _ es ney oo ae 7 Nerd ‘3 Fox y, oO iy
[ASK ORDER #: @.S Key 3 TASK ORDER AMOUNT: $994, 962, rae
. ev = - °
as , Less «SS Fa Far
Pofrmein t 4 ¢ gtaced
rea.ter 2.1 &
i. _
LD, Or fo pe”
£5 56,Sllo, ! 5
OFFERED BY CONSULTANT:
see HexF PUSS
Gator Boring & Trenching, Inc.
KJOKA'TC KIARAL
PRM OS INAME
Lennie Andrews
REPRESENLATIVE'S PRINTED NAME
SIGNATURE
General Manager G- 4/-J 0/5
TITLE DATE
RECOMMENDED FOR APPROVAL APPROVED BY OKALOOSA COUNTY
(Department Director) (Per Purchasing Manual)
e Between $25,001 and $50,000 approved by
Purchasing Director and County Administrator
SIGNATURE VY PURCHASING DIRECTOR
D root 0s
e In excess of $50,000 approved by the Board.
TITLE DATE
q[s/ 201
DATE
COUNTY ADMINISTRATOR (if applicable) CHAIRMAN (if applicable}
DATE DATE
TASK ORDER _ 63 eevision3 C-05-1117-WS
THIS TASK ORDER IS ISSUED PURSUANT TO THE AGREEMENT FOR MISCELLANEOUS SUBSURFACE UTILITY BORES DATED OCTOBER 12, 2004,
BETWEEN THE COUNTY OF OKALOOSA COUNTY, FLORIDA AND GATOR BORING & TRENCHING, INC., WHICH IS INCORPORATED HEREIN BY THIS
REFERENCE, WITH RESPECT TO
Scope of Basic Services
for
Okaloosa County Water and Sewer System
Miscellaneous Subsurface Utility Bores
Article A. Purpose:
The purpose of this Task Order is to authorize and direct the CONTRACTOR (Gator Boring & Trenching, Inc.) to
proceed with construction services for providing subsurface utility boring and utility installations services for the
Okaloosa County Water and Sewer Department (OWNER). The activities that are included are described
in“ Article B. Scope of Services.”
Article B. Scope of Services:
The CONTRACTOR agrees to perform technical and construction related services in accordance with contract
C05-1117-WS2-149, dated October 12, 2004 that has been identified for Okaloosa County Water and Sewer System
Subsurface Utility Bore Projects (PROJECT), as requested by the Owner's representative. The services that the
CONTRACTOR agrees to furnish as part of this Task Order include, but are not limited to locating, verifying the
location, excavation, material, boring, backfill, compaction, site restoration, erosion control, traffic control, record
documentation and other associated work as referenced in the contract specifications. Specific work, material
type, material quantities, completion time(s) associated with this tasks that have been verified by the Owner’s
representative are presented in “Attachment(s)” to this task order.
Article C. Compensation Provisions:
Job Name: Eglin Main & Plew FM and Pump Station Improvements
Directional Bore & Place 1,880/If 24”DIPS, DR11, HDPE Force Main (3 bores) @$160.20/If =$301,176.00
Supply 6 MJ transition couplings @ $3,327.22 per pair = 9,981.66
Directional Bore and Place 215/lf 2” HDPE duct (1 bore) @$ 9.73/If = $ 2,091.95
Directional Bore and Place 826/lf 16” DIPS, DR11, HDPE, Force Main (4 bores) @$ 93.81/If = $77,487.06
Supply 6 MJ transition couplings @ $2,111.80 per pair =$ 6,335.40
Jack & Bore 300/lf, 36” Steel Casing (2 bores, 85’, 215’) @ $378.11/lf =$113,433.00
Jack & Bore 130/If, 24” Steel Casing (1 bore) @$223.53/If =$ 29,058.90
TOTAL: = $539,563.97
Stored Materials: 0.5% reduction in contract price for payment for materials TOTAL = $536,866.15
As compensation for providing the services described within this Task Order, the OWNER shall pay the
CONTRACTOR in accordance with Article 2 of the October 12, 2004, Agreement, based on the Contractor’s Bid
Proposal Sheets for the actual work completed and accepted by the OWNER on the Project
Article D. Period of Service:
The schedule for the Project(s) within this Task Order shall be in accordance with Article 4 of the October 12, 2004
Agreement and is as follows:
Work should be completed within a timely manner from the date of commencement.
EGLIN MAIN & PLEW FM REVS 1