February 18, 2014

Okaloosa County BOCC — February 18, 2014 — Widening of US 98 Project Information Sheet

Okaloosa County Board of County Commissioners widening of us 98 project information sheet for the February 18, 2014 meeting. Official document preserved from the county IQM2 public portal, with a searchable OCR text layer.

FILED WITH

About this source

Widening of US 98 Project Information Sheet from the Okaloosa County BOCC meeting of February 18, 2014 (IQM2 meeting #1190). Original portal label: Widening of US 98 Project Information Sheet. Preserved as a historical public record; part of the meeting linked as a related source.

Original publication
Widening of US 98 Project Information Sheet
Date
February 18, 2014
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Machine produced / unreviewed — machine-extracted, not yet human-corrected
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Machine-extracted text — 118-Widening of US 98 Project Information Sheet.pdf

Text extracted on 2026-10-31 from 118-Widening of US 98 Project Information Sheet.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.

Text · 3.9 KB

Download ↓

Widening of US 98 Project Information Sheet (PDF)

Original PDF as published on the Okaloosa County IQM2 meeting portal.

PDF · 9.4 KB

Download ↓

Full text

Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.

Project to Widen US 98 Tang-O-Mar Drive to Airport Road Project Description The Florida Department of Transportation is currently in the design phase of a plan to widen two sections of US 98 to six lanes. One section reaches from Tang-O-Mar Drive in the Sandestin area to the Walton-Okaloosa County Line and the other is from the Walton-Okaloosa County Line to Airport Road in Destin. This project will improve and beautify the roadway providing: • 26 to 30-foot wide curb & gutter center medians landscaped with trees and other plantings • Five to eight-foot wide sidewalks on both sides of the roadway separated from the curb by landscaped areas when possible • Four-foot wide bike lanes on both sides of the roadway Project Status Okaloosa County Section • Design Phase 90% Complete; Expected Completion May 2014 • Current FDOT Cost Estimates: Roadway Construction - $30 million; ROW - $1.2 million Walton County Section • Design Phase 60% Complete; Expected Completion December 2014 • Current FDOT Cost Estimate: Roadway Construction - $31 million; ROW - $6.5 million • #1 Project on Okaloosa-Walton TPO Table 4: FY 15-19 SIS Project Priorities List Benefits of the Project With traffic congestion rapidly worsening in these areas, the need for this project is great. This project benefits both our permanent residents and our visitors as it will: • Improve commerce between Walton and Okaloosa Counties • Enhance the connectivity of people to jobs and services, businesses to suppliers and customers, visitors to destinations and students to schools • Create a safer environment for vehicular traffic, cyclists and pedestrians • Improve evacuation times during disaster events • Create jobs • Improve the multimodal aspect of the roadway • Decrease fuel consumption • Lessen pollution from vehicle exhaust produced while idling • Make this an attractive corridor 1 Project to Widen US 98 Tang-O-Mar Drive to Airport Road Timeframe Design is scheduled to be complete by December of 2014, but construction of the project is currently unfunded. We have a short-term opportunity to lobby for funding as Senator Don Gaetz is serving his last year as Senate President next year. As the Senate goes into the 2014 Legislative Session in early March, we have the leadership in place for a short time that can help get this done for our communities. Our goal is to obtain funding for a fall 2015 construction start date for both sections of the project. Action Plan • Gather resolutions from municipal bodies and organizations (Will provide a template) – Immediate and ongoing • Gather letters of support from Walton and Destin Chamber members and other local businesses (Will provide a template) – Meeting with Chamber presidents, Boards and Governmental Affairs Committee ongoing • Meet with FDOT District 3 Secretary Tommy Barfield to discuss prioritization of the project and verify cost figures – Met January 6, 2014; FDOT is supportive of advancing the funding timeframe for this project. • Educate legislators around the state and the Governor’s office about the project – Mid- December - February • Provide public forums to educate community members and address concerns – February 13 and February 20 • Request a resolution supporting the project from the Okaloosa-Walton TPO Board – February 20, 2014, 3:00 p.m. at Destin City Hall Annex • Send all resolutions and letters of support to Senator Gaetz – Late February 2

Related sources

Citation & reuse

“Okaloosa County BOCC — February 18, 2014 — Widening of US 98 Project Information Sheet.” February 18, 2014. Widening of US 98 Project Information Sheet. Crypt of Echoes evidence ID LED-2026-b337cd7028064543acd9ddab0c0a8d1e. https://cryptofechoes.com/evidence/LED-2026-b337cd7028064543acd9ddab0c0a8d1e. Accessed [date].

Public record of Okaloosa County, Florida.

Technical archive record ↓