Okaloosa County BOCC — August 19, 2014 — Letter from Developer/Engineer Including Estimates of Construction — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 127-Letter from Developer_Engineer Including Estimates of Construction.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

ENGINEERING - ENVIRONMENTAL | SURVEYING YH CHOCTAW ENGINEERING, INC. Mr. Jason Autrey, P.E. 7 August 2014 Okaloosa County Public Works 1759 South Ferdon Boulevard Crestview, FL 32536 Re: Townplace Suites CEI No. 2002-426-H Infrastructure Bond Request Dear Mr. Auttrrey, On behalf of WIN-FWB Investors, LLC, Choctaw Engineering, Inc. is providing this letter requesting the Okaloosa County Board of County Commissioners to accept a performance bond in order to provide enough time to perform the relocation of a force main and construct the turn lane for the subject project. The bond amount was based upon the attached estimates for the proposed work. The proposed improvements shall be completed within six months of acceptance of the bond by the County. Ifyou have any questions or request further information contact us at (850) 862-661 1. Sincerely, Choctaw Engineering, Inc. \ / U/ Mark C, Siner, P.E. President 112 Truxton Avenue, Fort Walton Beach, Florida 32547 Phone: (850) 862-6611 Fax: (850) 863-8059 E-mail: cei@choctaweng.com 02426-let2.wpd FORCE MAIN RELOCATION Quantity Unit Cost/Unit Cost 16" Ductile lron Pipe 250|LF $140.00 | $35,000.00 16" Gate Valve 2|SY $1,500.00 | $3,000.00 16" x 14" Reducer 2|TN $1,000.00 | $2,000.00 Line Stops ALS $10,000.00 | $10,000.00 Subtotal $50,000.00 FDOT TURN LANE Quantity Unit Cost/Unit Cost Concrete Curb, Driveway and Sidewalk Demo 2|load $600.00 | $1,200.00 1" Asphalt Wearing Surface 30]TN $102.00 | $3,060.00 Tack Coat 465/SY $0.70 $325.50 3" Asphalt Structural Course 85]TN $102.00 | $8,670.00 Prime Coat 465|SY $0.70 $325.50 8" FDOT Limerock Base 465|SY $11.00 | $5,115.00 12" Type "B" Stabilized Subgrade 500|SY $4.00 | $2,000.00 Type "F" Curb 425)LF $17.50 | $7,437.50 4" Concrete Sidewalk 1550|SF $4.20 | $6,510.00 Maintenance of Traffic AJLS $2,200.00 | $2,200.00 Remove Existing Striping (Grinding) ALS $1,100.00 | $1,100.00 Striping & Signage TLS $8,600.00 | $8,600.00 Modify Existing Drainage Structure 1jLs $2,450.00 | $2,450.00 Subtotal $48,993.50