series of meetings with County staff and the FDEP, a plan emerged that could expedite the
cleanup process to the benefit of all parties.
As the County, in cooperation with FDEP, looks to remediate the impacts to Dr. Hsu’s property
the attached settlement agreement is proposed. The agreement outlines the responsibilities of
each party to satisfy the remediation effort as efficiently as possible. To date, virtually all costs
associated with the environmental restoration efforts have been borne by the State through
Petroleum Cleanup Programs managed by FDEP.
The agreement sets forth the responsibilities between Dr. Hsu, FDEP and Okaloosa County that
are intended to expedite the clean-up effort. FDEP will coordinate and fund the soil remediation
effort and provide partial payment to Dr. Hsu for the loss of the building. The remaining balance
of the loss of building will be paid for by Okaloosa County over a three year period; the total due
to Dr. Hsu from the County is $550,000. In exchange for the expedited remediation and
repayment for the loss of the building, Dr. Hsu will agree to settle all claims with the County that
have arisen or could arise related to contamination.
OPTIONS: Approve/disapprove execution of the attached settlement agreement with Dr. Paul S.
Hsu.
RECOMMENDATIONS: Approve execution of the attached settlement agreement with Dr.
Paul S. Hsu.
RECOMMENDED BY:
APPROVED BY:
James D. Curry, County Administrator
Packet Pg. 469
9.7.b.a
SETTLEMENT AGREEMENT AND RELEASE
This Settlement Agreement and Release (the “Settlement Agreement”) is
entered into this ____ day of _______________, 2013, by and between Paul S.
Hsu and Majes Hsu, his wife, (the “Property Owners”) and Okaloosa County,
Florida, a political subdivision of the State of Florida (the “County”).
Attachment: Settlement Agreement (1320 : Remediation Settlement Agreement Approval)
RECITALS
WHEREAS, the Property Owners are the owners of certain real property
located at 70 Ready Avenue, Fort Walton Beach, Okaloosa County, Florida as
more particularly described in Attachment A (the “Property”); and
WHEREAS, the Property was contaminated by petroleum or some other
contaminate which had originated from a source occurring off of the Property
itself; and
WHEREAS, it is alleged that the source of the contaminate was property
owned by Okaloosa County; and
WHEREAS, as a result of the contamination, the Property was placed on
the state-funded priority cleanup list of the Florida Department of Environmental
Protection (FDEP Facility ID 468623645) and designated for remediation; and
WHEREAS, the Property Owner, the County and the Florida Department of
Environmental Protection (the “FDEP”) have been working together to address
remediation issues relating to the Property; and
WHEREAS, various options have been considered as to the remediation of
the Property and summarized in a document entitled “Remediation Options Cost
Comparison for Off-Site Contamination,” attached hereto as Attachment B; and
WHEREAS, the Parties to this Settlement Agreement and the FDEP have
agreed to remediation Option 3 which requires the demolition of the building on
the Property and remediation by removal of chemically impacted media (i.e., soil
and groundwater) from the site; and
WHEREAS, the site will be fine-graded to match the existing site
1
Packet Pg. 470
9.7.b.a
conditions of the adjacent non-disturbed areas, using clean fill and overburden
removed from the site prior to remediation activities, once impacted media have
been removed and confirmation of compliance procedures are complete; and
WHEREAS, to facilitate the selection of remediation Option 3 by the
FDEP, additional compensation is required to be contributed to allow the State of
Florida to select this remediation Option; and
Attachment: Settlement Agreement (1320 : Remediation Settlement Agreement Approval)
WHEREAS, to facilitate the selection of remediation Option 3, the Parties
to this Settlement Agreement seek to provide for the additional compensation and
to resolve any remaining issues as to liability relating to the contamination of the
Property; and
WHEREAS, the Property Owner and the County, in consideration of this
additional compensation, desire to fully and finally settle all claims that have arisen
or could arise related to the contamination on the Property resulting from the
contamination (the “Claim”).
NOW THEREFORE, in consideration for the mutual promises contained
herein, the Parties agree as follows:
ARTICLE I: RECITALS
1.1 The recitals set forth above are true and correct and are incorporated as
essential terms of this Settlement Agreement.
ARTICLE II: PARTIES’ RESPONSIBILITIES
2.1 FINANCIAL COMPENSATION FOR BUILDING FROM THE COUNTY
A. The County shall pay to the Property Owners compensation in the amount of
Five Hundred Fifty Thousand Dollars ($550,000) as full and complete
compensation for any loss resulting from the demolition of the building on
the Property and for any damage that may have resulted to the Property.
B. Such compensation shall be paid to the Property Owner by the County in
three annual payments under the following schedule:
2
Packet Pg. 471
9.7.b.a
1. An initial payment of One Hundred Eighty-five Thousand Dollars
($185,000) payable within sixty (60) days of the approval of
remediation Option 3 by the FDEP and under the terms set forth
herein (the “Initial Payment”).
2. A second payment of One Hundred Eighty-Five Thousand Dollars
($185,000) made payable within one (1) year of the date of the
Attachment: Settlement Agreement (1320 : Remediation Settlement Agreement Approval)
Initial Payment.
3. A third and final payment of One Hundred Eighty Thousand
Dollars ($180,000) made payable within two (2) years of the date
of the Initial Payment.
C. The terms and conditions of this Settlement Agreement are contingent upon
the approval of remediation Option 3 by the FDEP and its agreement to a
remediation strategy and process substantially as set forth in Section 2.2
below.
2.2 REMEDIATION STRATEGY
A. Remediation Selection. This Settlement Agreement is contingent upon the
selection of remediation Option 3 as the preferred remediation for the
Property by the FDEP and its agreement to a remediation strategy and
process substantially as set forth below.
B. Building Demolition. The building on the Property will be demolished as
part of the remediation strategy.
C. State Compensation. The State of Florida, through FDEP, will request
funding in a total amount of $250,000, which, if granted, will be paid to the
Property Owners for compensation for the loss of the building.
D. Relocation of tenants. The relocation of any and all tenants, materials and/or
equipment that are not an integral component of the building and the cost
associated with that relocation will be the responsibility of the Property
Owners.
3
Packet Pg. 472
9.7.b.a
E. Utilities. Property Owners will be responsible for disconnecting all utilities
to the building.
F. Demolition and disposal of the building and slab. The FDEP will be
responsible for the demolition of the building, slab and adjacent ancillary
improvements (e.g., parking lot) and disposal of this debris in order to
accommodate remediation activities.
Attachment: Settlement Agreement (1320 : Remediation Settlement Agreement Approval)
G. Excavation and staging of clean overburden. The FDEP will provide or
ensure the excavation and verification monitoring of the clean overburden.
The County will provide an appropriate staging area for the clean
overburden, if necessary.
H. Excavation of contaminated soil. The FDEP will provide or ensure that
contaminated soil is properly excavated, transported, and treated or
disposed. If the FDEP determines it necessary, the County will provide the
treatment area.
I. Backfill excavation with clean soil. The FDEP will provide or ensure the
excavated area is properly backfilled with clean soil. Additionally, the
backfill will be compacted to prevent erosion.
J. Contaminated groundwater. The FDEP will provide or ensure that
contaminated groundwater that is extracted is treated and properly disposed.
K. Heavy Equipment. The County would assist in providing heavy equipment,
such as Loaders, Excavators, Backhoes and the like, if available, to assist in
the demolition and disposal of the building and slab, excavation and staging
of clean and contaminated soils, and backfill and grading.
L. Sampling and Analysis. Samples collected to evaluate or verify remediation
objectives will be the responsibility of the FDEP. Monitoring costs to verify
long-term remediation effectiveness will also be FDEP’s responsibility.
M. Remediation and site close-out documentation. All documentation related to
the planning, design, construction, monitoring and close-out of the site will
be the responsibility of the FDEP.
4
Packet Pg. 473
9.7.b.a
N. Remediation Timeline. The County will make a good faith effort to
facilitate the remediation process so that the site will be ready for
construction by April 15, 2013, to the extent that will be consistent with the
procedures and processes of the State and County.
ARTICLE III: RELEASE
Attachment: Settlement Agreement (1320 : Remediation Settlement Agreement Approval)
3.1 Upon the FDEP’s approval of remediation Option 3, the Property Owner
shall execute a release substantially in the form of the Release attached hereto as
Attachment C (the “Release”). The Release shall release, acquit, satisfy, and
discharge the County from all past and present claims relating to the Claim and to
the Property and