Okaloosa County BOCC — December 4, 2012 — reading text
Part 27 of 71. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Service Area
plants in working order.
An automatic transfer
emergency generator is
needed at Lift Station #1 to
prevent sewage overflow
Hurricane and Tropical
Emergency into Santa Rosa Sound in City of Fort Walton City of Fort Walton City of Fort Walton Beach - Water & City of Fort
10 1999 Storm; and Severe yes $37,000.00 X 3 months Existing Y
Generators case of power failure. An Beach Beach Sewer Dept. Walton Beach
Storm
additional portable
generator is needed to
accommodate other Lift
Stations within the City.
E-1 Packet Pg. 127
Okaloosa County 8.3.a
2011 LMS
Appendex E
YEAR MITIGATION GOALS MATCH (if AGENCY RESPONSIBLE FOR ESTIMATED PROJECT STATUS IF DEFERRED, TIMEFRAME FOR MiTIGATE NEW OR HMGP
PRIORITY NAME OF PROJECT PROJECT DESCRIPTION HAZARDS MITIGATED FUNDING SOURCE JURISDICTION BENEFICIARY
SUBMITTED ACHIEVED Applicable) IMPLEMENTATION COST WHY COMPLETION EXISTING? ELIGIBLE
NEW COMPLETED DELETED DEFERRED
Storm proof lift stations
4,8,9,10,14,15, & 17.
elevate tops of wet wells,
Hurricane & Tropical
valve boxes, relocation of
Flood Proofing Lift Storm; Flood; Land City of Valparaiso - Water & Sewer City of
11 2010 emergency power supplies, yes City of Valparaiso City of Valparaiso $600,000.00 X 3 months Existing Y
Stations Erosion; Severe Storms; Dept. Valparaiso
and storm hardening
and Beach Erosion
controls. To include
bulkheads and/or retaining
walls
Attachment: 2012 Project List (1304 : Annual LMS Letter to Division of Emergency Management)
Restoration of Restoration of wetlands in
Hurricane & Tropical
wetlands in Glenwood Glenwood Park and Town of Cinco Town of Cinco Town of Cinco
12 2010 Storm: Flood; Storm yes Town of Cinco Bayou - Public Works $15,000.00 X 1 year Existing Y
Park and upgrade the upgrade the park's Bayou Bayou Bayou
Surge
drainage system drainage system
Sewer pump Station Location is unstable and
City of Niceville - Water & Sewer
13 13 protective 2010 susceptible to erosion and Land Erosion yes City of Niceville City of Niceville $ 10,000.00 X 90 days Existing City of Niceville Y
Dept.
measures washing.
The Coleman Lake outfall
runs under Main Street in
the City of Destin through a
structurally deficient
earthen dam. Based on Dam Safety; Hurricane
Dunes of Destin Lake
14 2010 increasing frequency and & Tropical Storm; Flood; yes City of Destin City of Destin City of Destin - Public Works $600,000.00 X 3 months Existing City of Destin Y
Drainage Project
depths of potholes at the and Severe Storms
outfall location, it is
eveident that the structure
is leaking and could lead to
failure
Hurricane and Tropical
Culvert is to small to
15 85-A Culvert Crossing 1999 Storm; Flood; and yes City of Laurel Hill City of Laurel Hill City of Laurel Hill - Public Works Dept. $30,000.00 X No Funding 120 days Existing City of Laurel Hill Y
accommodate stormwater
Severe Storms
There are several
properties, including
concrete masonry unit
houses built with slab on
grade, which flood during Flood; Hurricane &
Repetitive Loss Existing Building
storm events. Due to this Tropical Storm; Severe City of Fort Walton City of Fort Walton