READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — March 18, 2013 — Bid Award Recommendation — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 47-Bid Award Recommendation.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

State of Morida February 25, 2013 Mr. Richard Brannon, CPPB FCCM Purchasing Director Okaloosa County Board of County Commissioners 602 C North Pearl Street Crestview, Florida 32536 Re: Reeves Road Bridge Bid Recommendation for award Dear Mr. Brannon: The Okaloosa County Public Works Department has reviewed the bid received for the above referenced project. The bid provided is consistent with the request and will properly supply the materials for the Reeves Road Bridge Replacement Project. This project is funded as part of the approved FY2013 budget through account 3202 563490. A copy of the approved budget sheet is attached for reference. Public Works recommends acceptance of the bid from Conecuh Bridge & Engineering, Inc in the amount of $121,525.77 for the Reeves Road bridge design and materials. Should you have any questions please feel free to ask. C | i af 7 i } Jason T. Autrey, P.E. County Engineer Okaloosa County, FL Ce: John Hofstad, Public Works Director Clay Simmons, P.E., Road Division Manager 1759 S. Ferdon Blyd, Crestview, FL 32536 Office (850) 689-5772 Fax (850) 689-5786 SE-9 aed Okaloosa County Capital Improvement Program mae __ Fiscal Years 2013-2017 JROAD & BRIDGE CONSTRUCTION | FY Fund Amount Project Name Cat Narrative FY13 302 300,000 Roadway Striping I Apply/re-apply pavement markings. CGT FY13 302 100,000 Stormwater Pipe Lining I Annual pipe lining for failing roadway drainage pipes. CGT PY13 302 1,225,000 PJ Adams Grant Cash Match I Accumulating cash match for TRIP Grant for Ph | widening design for Ph I -Total cash match req $2.2M by FY14 (Estimated proposed const cost for Ph 1 widening $30M) CGT FYI3 302 50.000 Green Acres Blvd I Reclaim, repair base & resurface CGT FY13 302 100,000 MLK Blvd I Reclaim, repair base & resurface CGT (Total project cost $2M) FY13 302 100,000 PJ Adams/Antioch Road PD&E I Joint project with FDOT to determine possible alignment for future expansion. CGT Cash Carryforward FY13 302 1,000,000 Fairchild Road (North) I Pave trom Airport Road to asphalt. (Total project cost $2.5M) CGT Cash Carryforward FY13 302 900,000 Antioch Road I Rehabilitate existing roadway from Brodie Ln to Wilks Dr. CGT Cash Carryforward FYI3 302 1,435,000 Okaloosa Lane if Pave from Aplin Road to Serenity Lane. (Total project cost $2M) CGT Cash Carryforward FYI3 302 100.000 Materials - Millings I Stabilize dirt roads with millings. LOGT FY13 302 250,000 Foxwood Subdivision Phase I] I Install new in-ground filtration system & overlay roads. LOGT FY13 302 150,000 Gilmore Road I Pave road under Dusty Roads Exemption. LOGT FY13 302 100.000 —Kervin Road I Install drainage swales. LOGT FY13 302 100,000 Lighthouse Church Road I Elevate roadway & install stormwater improvements. LOGT FY13 302 165,000 — Robinson Road | Pave road under Dusty Roads Exemption. LOGT Pf FYI3 302 100.000 _ Stateline Road I Pave road under Dusty Roads Exemption. LOGT / / FY13 302 200,000 Bridge Conversion/Replacement ] Annual timber bridge conversion and bridge replacement. LOGT / jf PFYT3 302 200,000 = Open Graded Cold Mix Restoration I Stabilize open graded cold mix roads with various treatments. LOGT / FY13 302 275,000 = USDA Watershed (E.W.P) ] Grant Matches (Cash Carryforward) LOGT FPYT3 302 100,000 District One Overlay I Annual Allocation. Pavement Preservation Fund (302-3204) FY13 302 100.000 District Two Overlay I Annual Allocation. Pavement Preservation Fund (302-3204) FY13 302 100,000 District Three Overlay ] Annual Allocation. Pavement Preservation Fund (302-3204) PY13 302 100.006 District Four Overlay I Annual Allocation. Pavement Preservation Fund (302-3204) FY13 302 100.000 District Five Overlay I Annual Allocation. Pavement Preservation Fund (302-3204) TABULATION SHEET REEVES ROAD BRIDGE MATERIALS RFB DUE: FEBRUARY 21, 2013 @3:00 P.M. MAXIMUM DELIVERY BIDDER TOTAL BID PRICE TIME (DAYS) F & WCONSTRUCTION CO. INC. $141,500.00 60 CONECUH BRIDGE & ENG, INC. $121,525.77 10

Download this text file with its original spacing ↓