J0
All Concrete Work for the new recreation center and the concessions buildings is
included.
All concrete to be a 28 day 3000 psi mix design with a slump of 3 to 5'
o Water /Cement ratio for concrete of .45 or . 40 is EXCLUDED.
Masonry
All masonry included for the new recreation center and the concessions buildings.
CMU to be c90 light weight type II ( fire ratings per ASTM E -119).
Brick: Modular size with an allowance of $350. 00 per thousand for materials.
Colored mortar at brick is EXCLUDED.
Pre -packaged Mortar mix is included.
Joint reinforcing to be 9 gauge Hot -dipped ladder with corners and tees.
Rigid insulation in cavity walls behind brick to be 1 Xz" Polyisocyanurate.
In -wall flashing to be 40 mil perm -a- barrier or equal.
Copper or metal flashings in masonry are EXCLUDED.
Mortar net weeps included.
3000 psi concrete masonry fill included.
I I P a g e of 4
Pac gtPg. 26
Lord & Son Construction Inc. 3. 1. a
Guaranteed Maximum Price
City of Fort Walton Beach
Recreation Complex
8 April 2013
Exhibit C
Metals
All structural and miscellaneous steel is included.
Mechanical Mezzanine ladder is included as prime painted steel.
Metal deck gauge is quoted in accordance with the framing plans and not as shown on
General Notes Sheet SO. I.
Aluminum ladders are EXCLUDED.
Carpentry
Wood wall blocking is included as required for construction.
Plastic Laminate cabinets and tops are included.
Solid Surface window sills are included.
Trophy case is included.
Rough Carpentry work included as indicated.
Roofing and Waterproofing
Underslab vapor barrier to be 10 mil visqueen with taped seams. The system noted in
specification section 07 26 50 is EXCLUDED.
We EXCLUDE the Air & Vapor Barrier System noted in specification section 07 27 00 N
Air and Vapor Barrier System.
N0a
Metal roofing and metal soffit panels are included.
5' Felt Faced Rigid Board Insulation
Ice and Water Shield Underlayment
0
J
Gutters and Down spouts
All Trims Related to Metal Roofing
Sealants
Foil Faced insulation is EXCLUDED.
EIFS System included as indicated.
High Impact fiberglass mesh is EXCLUDED.
o Fluid applied Waterproof membrane and Air Barrier as manufactured by the
EIFS system manufacturer is included behind the EIFS applied to CMU
substrate.
DoorslFrameslW i ndows
We included all aluminum framed entrances and storefronts, glazing and mirrors.
All hardware will be manufacturers standard tested hardware.
Testing, mock -ups and /or P. E. Stamp are not included.
Field Testing is not included.
We include all hollow metal, wood doors, finish hardware as shown.
Modification of hardware for some doors may be necessary to meet windstorm
requirements.
2Page of 4"
Packet.Pg: 2T; _..
Lord & Sou Construction Inc.
Guaranteed Maximum Price
F 3.1. a
City of Fort Walton Beach
Recreation Complex
8 April 2013
Exhibit C
Finishes
We include gypsum board systems stud as indicated.
VCT, Carpet and Hard Tile included.
Epoxy flooring and base included as indicated on finish schedule.
We include acoustical ceilings as shown.
We include acoustical wall panels at the gymnasium.
Wood floors are included as shown.
We include paint per plans and specifications except painting of EIFS system which
has a finish coat with the El FS system.
Specialties
Toilet accessories are included.
Site Furnishings are included.
Toilet Partitions to be floor mounted overhead braced powder coated steel.
Fire extinguishers and cabinets are included.
Marker Boards and tack boards are included.
Projection Screens to be 45 x 80 Matt White, tab tensioned screens are EXCLUDED
as they are not available in specified model, so the non tab tensioned screens are
being included.
We include one flagpole.
We include 5 tier metal lockers.
Accordion folding partition is included.
Metal Athletic equipment and storage shelving is included.
Equipment
GE Stainless Appliances are included.
Athletic Equipment is included.
o Scoreboards are excluded in accordance with addenda.
Racquetball Court System including glass wall system, side and front wall systems,
ceilings and wood floor as manufactured and installed by The Court Company are
included.
We exclude any engineered stamped drawings or engineering for the basketball
backstop system.
Furnishings
Window Blinds are included.
Fixed Bleachers are included.
Telescoping Bleachers are included.
3 1 P a g e of 4 ,
Lord & Son Construction Inc. 3. 1. a
Guaranteed Maximum Price
City of Fort Walton Beach
Recreation Complex
8 April 2013
Exhibit C
Conveying Equipment
Not applicable
x
Fire Protection a
Complete Fire protection sprinkler system is included including design, PE Seal and o
Permit.
Proposal is based on an adequate water supply to the system and no fire pump will be
required. d
0d
Plumbing
Plumbing permit is included as shown. o
Water, drain and gas connections to equipment furnished by others ( all equipment g2
furnished & installed by others).
Gas piping from meter to the gas water heater & the exterior gas grill at the Recreation o
Center. Below grade material will be polyethylene with tracer wire & buried indicating
tape. Above grade to be black iron with threaded fittings. Gas regulators at the water ca
heater & grill are included.
nn
N0
HVAC c
Complete HVAC System as indicated is included.
Factory start ups are included. 0
Certified test and balance is included.
Electrical
Electrical system as indicated is included.
Sitework
Sitework is included.
o Pond liners
o Storm drainage
o Ball field construction
o Fencing included as an allowance
o Sidewalks
o Benches /tables
We exclude any as -built or certification surveys.
Termite protection is included at all buildings.
Landscaping, sodding and irrigation are included as an allowance.
41Page of 4
3. 1. a
Exhibit D
Completion Schedule N
UNJCOv0G
P8Ff 8t Pg. 30
Lc J
0
L
I
CI
m ot
al
Nil m
XX
via
a
a
L9
a
VE6CO0
vv
UU
U
O:O:
a0a0
lI,ih a0`a0`
F ww
00
b I 3 I
c
L
4--------------- 1-
d I
V I I
a
i
C1313 sz
a
R
mf
o`o
N
3.3. t.t. aa
s
G`G`
LL
s
vv
uu
QQ
LordLord
& & Son:Son:Constraction,Constraction, Inc.Inc.
1'1'