2013
J0
I11Page of 11
F- 3- 1- 7
Exhibit B
Allowance Items
Na
CF
ao
J
Lord & Son Construction Inc. 3. 1. a
Guaranteed Maximum Price
City of Fort Walton Beach
Recreation Complex
8 April 2013
Exhibit B
Allowance Items
These allowances are included in the GMP amount and are listed on the Itemized Cost
Breakdown provided in Exhibit C.
A. PRE -LOAD SITE 3, 950. 00
B. VOICE OVER IP 20, 000. 00
C. MATERIALS TESTING 15, 000. 00
D. INFIELD MIX 100, 000. 00
E. LANDSCAPE & IRRIGATION 245, 000. 00
F. FENCING 320, 000. 00
I I P a g e of 1
3. t. a
Exhibit C
Assumptions and
Clarifications
amNN_
NU9CJO
Packet Pg. 23
3. 1. a
LORD & SON CONSTRUCTION, INC.
FORT WALTON BEACH RECREATIONAL COMPLEX
GUARANTEED MAXIMUM PRICE BREAKDOWN
APRIL 8, 2013
DESCRIPTION OF WORK TOTALS
26, 240
FINAL CLEANING
3, 950
PRELOAD SITE ALLOWANCE
20, 000
VOICE OVER IP ALLOWANCE
15, 000
TESTING ALLOWANCE
100, 000
INFIELD MIX ALLOWANCE
245, 000
LADSCAPE AND IRRIGATION ALLOWANCE
65, 990
BUILDING DEMO / ASBESTOS ABATEMENT
320, 000
FENCING ALLOWANCE
155, 505
TEMP JOB REQUIREMENTS
1, 545, 415
SITEWORK
em
CONCRETE
288, 600
r
777, 717
MASONRY
METALS
262, 603
Nc0an
GENERALTRADES
537, 700
aJ0
38, 488
CASEWORK
347, 713
THERMAL AND MOISTURE PROTECTION
60, 708
EIFS SYSTEM
OVERHEAD COILING DOORS I SHUTERS 34, 200
107, 600
STOREFRONT / WINDOWS /GLASS /MIRROR
96, 260
GYP BOARD/ ACOUSTICAL CEILINGS
12, 418
CERAMIC TILE
89, 047
WOOD SPORTS FLOOR
68, 749
RESILIENT FLOORING / CARPET
46, 766
PAINTING
21, 314
EPDXY FLOORING
29, 885
TELESCOPING STANDS
Page 1 of 2 24
Pack;;
3
LORD 8, SON CONSTRUCTION, INC.
FORT WALTON BEACH RECREATIONAL COMPLEX
GUARANTEED MAXIMUM PRICE BREAKDOWN
APRIL 8, 2013
ATHLETIC EQUIPMENT 43, 201
80, 275
RACQUETBALL COURT
MECHANICAL 42, 800
MECHANICAL 176, 400
652, 520
MECHANICAL
ELECTRICAUCOMMUNICATIONS 1, 058, 700
SUBTOTAL 7, 370, 763
INSURANCE
CONTINGENCY 129, 004
BUILDERS RISK BY OWNER
SUBTOTAL 7, 499, 767
PRECONSTRUCTION FEE 41, 250
FEE / GENERAL CONDITIONS
SUBTOTAL
497, 952
8, 038, 969
NN_N_amamN
BUILDING PERMIT
N00
aN0oCJ9
9C
ADD FOR BOND 52, 631 aN
8, 091, 600
SUBTOTAL Jo
DEDUCT FOR TAX SAVINGS 105, 000)
TOTAL BASE BID COST 7, 986,600
11PTION
ADD OVERLAY OF PARKING LOT 61,61, 000000
ADDADD LIGHTLIGHT RELOCATION RELOCATION FORFOR JETJET STADIUMSTADIUM 16, 000
UPGRADE UPGRADE GYMGYM FLOORFLOOR MATERIALSMATERIALS 6,6, 400400
TOTAL GMP INCLUDING OPTIONS 8,8, 070,070, 000000
ALTERNATE ALTERNATE ADDADD NOTNOT INLCUDEDINLCUDED ININ ABOVEABOVE
BUILDINGBUILDING PRELOADPRELOAD
$ $ 98,98, 800.800. 0000
PagePage 22 ofof 22
PacketPacket Pg:,Pg:,
Lord & Son Construction Inc. 3. t. a
Guaranteed Maximum Price
City of Fort Walton Beach
Recreation Complex
8 April 2013
Exhibit C
Assumptions and Clarifications
General Conditions
Building permit is excluded.
Duration of construction will be 420 calendar days starting after receipt of building
permit or Notice to Proceed whichever occurs later.
Design Fees are excluded.
Utility company fees are excluded.
Tap and impact fees are excluded.
Builder' s Risk insurance is excluded. ( This is to be provided by owner.)
We include a 1. 75% contractor' s contingency in the estimated costs. Any portion of
the contingency not used would be refunded through a deductive contract change
order at the end of the project.
The following Allowances have been included
Building Furniture— NOT INCLUDED
Voice over IP - $ 20, 000. 00
Site Investigation for Preload - $ 3, 950. 00
mN
Materials Testing- $ 15, 000. 00
Landscape, Sod and Irrigation - $ 245, 000. 00
0
Fencing - $ 320, 000. 00
Infield Soil Mixture - $ 100, 000. 00
wa
Concrete