READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 04-16-13--special--rec center GMP — reading text

Part 5 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-31712-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

10 00 - FRP Doors & Frames 5 08 11 13 - Steel Doors & Frames 8 08 14 16 - Flush Wood Doors 5 08 33 13 - Coiling Counter Doors 7 08 33 23 - Overhead Coiling Doors 7 O8 41 13 - Aluminum- Framed Entrances & Storefronts 12 08 71 00 - Door Hardware 10 O8 80 00 - Glazing 9 O8 83 00 - Mirrors 5 DIVISION 9 - FINISHES 09 22 16 - Non- Load- Bearing Steel Framing5 09 29 00 - Gypsum Board 5 71Page of 1 I Lord & Son Construction Inc. 3. 1. a Guaranteed Maximum Price City of Fort Walton Beach Recreation Complex 8 April 2013 Exhibit A 09 30 00 - Porcelain and Ceramic Tile 12 09 51 23 - Acoustical Tile Ceilings 8 09 58 00 - Drywall Suspension System 4 09 64 46 - Wood Athletic Flooring 6 09 65 19 - Resilient Flooring and Base 9 09 67 10 — Epoxy Floor Coating 5 09 68 13 - Modular Carpet Tile 5 09 84 33 - Sound Absorbing Wall Units 5 09 91 23 - Painting 11 DIVISION 10 - SPECIALTIES6 101100 - Visual Display Boards 6 10 14 00 - Signs, Interior 3 10 1401 - Signs, Exterior 3 10 20 00 - Louvers and Vents 5 m e 1021 33 - Toilet Compartments 5 N_ 10 22 33 - Accordion Folding Partition 6 10 28 00 - Toilet Accessories 104413 - Fire -ProtectionSpecialties 4 5 NaC0 10 50 50 - Metal Lockers 1056 13 - Metal Athletic Equipment & Storage Shelving 6 6 aNJo 10 75 00 - Flagpole 3 DIVISION 11 - EQUIPMENT 11 31 00 - Appliances 5 11 52 00 - Audio Visual Systems 17 11 52 13 - Projection Screens 4 11 66 23 - Athletic Equipment 8 DIVISION 12 - FURNISHINGS 12 21 13 - Horizontal Louver Blinds 5 12 66 00 - Telescoping Stands 6 12 93 00 - Site Furnishing 5 DIVISION 13 - SPECIAL CONSTRUCTION - NOT USED DIVISION 14 - CONVEYING EQUIPMENT - NOT USED 8IPage of I 1 y Packet Pg , Lord & Son Construction Inc. 3. 1. a Guaranteed Maximum Price City ofFort Walton Beach Recreation Complex 8 April 2013 Exhihit A DIVISION 21 - FIRE SUPPRESSION 21 15310 — Automatic Sprinkler Systems 9 DIVISION 22 - PLUMBING 22 07 00- Insulation for Plumbing Pie 3 22 11 13 - Portable Water Systems 6 22 13 16 - Soil, Waste and Vent Systems 6 22 42 00 - Plumbing Fixtures, Equipment, Trim & Schedule 8 DIVISION 23 - HVAC 23 00 00 - Mechanical General 9 23 05 01 - Codes and Standards 2 23 05 02 - Mechanical Related Work 5 2305 10 — Excavation and Backfill 2 23 05 53 - Mechanical Identification 4 2307 13 - Exterior Insulation for Ductwork 3 2307 17 - Insulation for HVAC Equipment and Piping 4 2321 01 - Condensate Drain System 4 2331 00 - HVAC Metal Ductwork 8 23 37 00 - Grilles, Registers, and Ceiling Diffusers 3 2381 26 - Split System Air Conditioning System 6 DIVISION 26 - ELECTRICAL 26 00 00 - Basic Electrical Materials & Methods . 2 26 05 19 - Conductors and Cables 4 2605 23 - Electrical Supports 4 26 05 26 - Grounding and Bonding 4 26 05 33 - Raceways and Boxes 7 26 05 53 - Electrical Identification 3 26 05 83 - Wiring Devices 4 26 09 23 - Lighting Control Devices 7 26 12 16 - Dry Type Transformers 600 V and Less .. 3 26 24 13 - Switchboards 4 26 24 16 - Panel boards 5 26 24 19 - Transfer Switches 5 26 28 16 - Enclosed Switches and Circuit Breakers 3 99 PagePage ofof 1 11.;.; PacketPacket P7971$P7971$ Lord & Son Construction Inc. 3. 1. a Guaranteed Maximum Price City of Fort Walton Beach Recreation Complex 8 April 2013 Exhibit A 26 41 23 - Sure Protective Devices 7 2651 00- Interior lighting 12 26 56 00 - Exterior lighting 4 26 56 68 - Sports lighting Systems 7 26 72 10 - Fire Alarm 10 DIVISION 27 - COMMUNICATIONS 27 10 00 - Communications Structured Cablin g System 13 274100 - Audio -Visuals stems 16 27 51 00 - Audio Systems 2 DIVISION 28 - ELECTRONIC SAFETY & SECURITY NOT USED DIVISION 31 - EARTHWORK 31 00 00 - Earthwork 6 am 31 00 05 - Infield Skin Surface 3 N_ 311100- Clearin and rubbing 2 C0 31 21 16 - Soil Treatment 2 a 31 37 1613 - Rubble Stone Rip Rap 1 A a DIVISION 32 - EXTERIOR IMPROVEMENTS J 32 05 33 - Landscape Maintenance 6 32 11 23 - Ag2regate Base Courses 3 32 12 00 - Flexible Paving 10 32 13 13 - Concrete Paving 13 32 14 00 - Unit Paving 2 32 17 23 - Pavement Markings 3 32 31 13 - Vinyl Coated Chain -link 4 32 31 14 - Nylon Backstop Netting 2 3284 24 - Irrigation 7 32 92 00 - Turf and Grasses 4 32 92 23 - Sodding 5 32 93 00 - Trees, Plants and Groundcover 7 DIVISI' ' '-' T ILITIES 33 OS 00 - Common Work Results for Utilities 8 33 11 13 - Public Water Utility Distribution Piping_ _ 8 IOjPage of 11 kekf+g. 19: x. Lord & Son Construction Inc. 3. 1. a Guaranteed Maximum Price City of Fort Walton Beach Recreation Complex 8 April 2013 Exhibit A 33 12 16 - Water Utility Distribution Valves 7 33 31 13 - Public Sanitary Utility Sewerage Piping 4 APPENDICES APPENDIX -A- Geotechnical Investigation - Recreation Building 17 APPENDIX -B- Geotechnical Investigation - Stormwater 23 APPENDIX -C - Hazardous Materials Survey 14 Addenda Issued by DC Architects as follows: Addendum One dated 26 March 2013 Addendum Two dated 2 April 2013 Addendum Three dated 4 April 2013 RFI answers from DC Architect as follows: 0 Response to RFI 001 through 012 dated 26 March 2013 a Response to RFI 002, 008, 013 dated 2 April 2013 m Response to RFI 013, 025, 027 dated 4 April

Download this text file with its original spacing ↓