READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 04-16-13--special--rec center GMP — reading text
Part 5 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31712-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
10 00 - FRP Doors & Frames 5
08 11 13 - Steel Doors & Frames 8
08 14 16 - Flush Wood Doors 5
08 33 13 - Coiling Counter Doors 7
08 33 23 - Overhead Coiling Doors 7
O8 41 13 - Aluminum- Framed Entrances & Storefronts 12
08 71 00 - Door Hardware 10
O8 80 00 - Glazing 9
O8 83 00 - Mirrors 5
DIVISION 9 - FINISHES
09 22 16 - Non- Load- Bearing Steel Framing5
09 29 00 - Gypsum Board 5
71Page of 1 I
Lord & Son Construction Inc. 3. 1. a
Guaranteed Maximum Price
City of Fort Walton Beach
Recreation Complex
8 April 2013
Exhibit A
09 30 00 - Porcelain and Ceramic Tile 12
09 51 23 - Acoustical Tile Ceilings 8
09 58 00 - Drywall Suspension System 4
09 64 46 - Wood Athletic Flooring 6
09 65 19 - Resilient Flooring and Base 9
09 67 10 — Epoxy Floor Coating 5
09 68 13 - Modular Carpet Tile 5
09 84 33 - Sound Absorbing Wall Units 5
09 91 23 - Painting 11
DIVISION 10 - SPECIALTIES6
101100 - Visual Display Boards 6
10 14 00 - Signs, Interior 3
10 1401 - Signs, Exterior 3
10 20 00 - Louvers and Vents 5
m
e
1021 33 - Toilet Compartments 5 N_
10 22 33 - Accordion Folding Partition 6
10 28 00 - Toilet Accessories
104413 - Fire -ProtectionSpecialties 4
5
NaC0
10 50 50 - Metal Lockers
1056 13 - Metal Athletic Equipment & Storage Shelving
6
6
aNJo
10 75 00 - Flagpole 3
DIVISION 11 - EQUIPMENT
11 31 00 - Appliances 5
11 52 00 - Audio Visual Systems 17
11 52 13 - Projection Screens 4
11 66 23 - Athletic Equipment 8
DIVISION 12 - FURNISHINGS
12 21 13 - Horizontal Louver Blinds 5
12 66 00 - Telescoping Stands 6
12 93 00 - Site Furnishing 5
DIVISION 13 - SPECIAL CONSTRUCTION - NOT USED
DIVISION 14 - CONVEYING EQUIPMENT - NOT USED
8IPage of I 1
y
Packet Pg ,
Lord & Son Construction Inc. 3. 1. a
Guaranteed Maximum Price
City ofFort Walton Beach
Recreation Complex
8 April 2013
Exhihit A
DIVISION 21 - FIRE SUPPRESSION
21 15310 — Automatic Sprinkler Systems 9
DIVISION 22 - PLUMBING
22 07 00- Insulation for Plumbing Pie 3
22 11 13 - Portable Water Systems 6
22 13 16 - Soil, Waste and Vent Systems 6
22 42 00 - Plumbing Fixtures, Equipment, Trim & Schedule 8
DIVISION 23 - HVAC
23 00 00 - Mechanical General 9
23 05 01 - Codes and Standards 2
23 05 02 - Mechanical Related Work 5
2305 10 — Excavation and Backfill 2
23 05 53 - Mechanical Identification 4
2307 13 - Exterior Insulation for Ductwork 3
2307 17 - Insulation for HVAC Equipment and Piping 4
2321 01 - Condensate Drain System 4
2331 00 - HVAC Metal Ductwork 8
23 37 00 - Grilles, Registers, and Ceiling Diffusers 3
2381 26 - Split System Air Conditioning System 6
DIVISION 26 - ELECTRICAL
26 00 00 - Basic Electrical Materials & Methods . 2
26 05 19 - Conductors and Cables 4
2605 23 - Electrical Supports 4
26 05 26 - Grounding and Bonding 4
26 05 33 - Raceways and Boxes 7
26 05 53 - Electrical Identification 3
26 05 83 - Wiring Devices 4
26 09 23 - Lighting Control Devices 7
26 12 16 - Dry Type Transformers 600 V and Less .. 3
26 24 13 - Switchboards 4
26 24 16 - Panel boards 5
26 24 19 - Transfer Switches 5
26 28 16 - Enclosed Switches and Circuit Breakers 3
99 PagePage ofof 1 11.;.;
PacketPacket P7971$P7971$
Lord & Son Construction Inc. 3. 1. a
Guaranteed Maximum Price
City of Fort Walton Beach
Recreation Complex
8 April 2013
Exhibit A
26 41 23 - Sure Protective Devices 7
2651 00- Interior lighting 12
26 56 00 - Exterior lighting 4
26 56 68 - Sports lighting Systems 7
26 72 10 - Fire Alarm 10
DIVISION 27 - COMMUNICATIONS
27 10 00 - Communications Structured Cablin g System 13
274100 - Audio -Visuals stems 16
27 51 00 - Audio Systems 2
DIVISION 28 - ELECTRONIC SAFETY & SECURITY NOT USED
DIVISION 31 - EARTHWORK
31 00 00 - Earthwork 6
am
31 00 05 - Infield Skin Surface 3 N_
311100- Clearin and rubbing 2
C0
31 21 16 - Soil Treatment 2
a
31 37 1613 - Rubble Stone Rip Rap 1 A
a
DIVISION 32 - EXTERIOR IMPROVEMENTS J
32 05 33 - Landscape Maintenance 6
32 11 23 - Ag2regate Base Courses 3
32 12 00 - Flexible Paving 10
32 13 13 - Concrete Paving 13
32 14 00 - Unit Paving 2
32 17 23 - Pavement Markings 3
32 31 13 - Vinyl Coated Chain -link 4
32 31 14 - Nylon Backstop Netting 2
3284 24 - Irrigation 7
32 92 00 - Turf and Grasses 4
32 92 23 - Sodding 5
32 93 00 - Trees, Plants and Groundcover 7
DIVISI' ' '-' T ILITIES
33 OS 00 - Common Work Results for Utilities 8
33 11 13 - Public Water Utility Distribution Piping_ _ 8
IOjPage of 11
kekf+g. 19: x.
Lord & Son Construction Inc. 3. 1. a
Guaranteed Maximum Price
City of Fort Walton Beach
Recreation Complex
8 April 2013
Exhibit A
33 12 16 - Water Utility Distribution Valves 7
33 31 13 - Public Sanitary Utility Sewerage Piping 4
APPENDICES
APPENDIX -A- Geotechnical Investigation - Recreation Building 17
APPENDIX -B- Geotechnical Investigation - Stormwater 23
APPENDIX -C - Hazardous Materials Survey 14
Addenda Issued by DC Architects as follows:
Addendum One dated 26 March 2013
Addendum Two dated 2 April 2013
Addendum Three dated 4 April 2013
RFI answers from DC Architect as follows:
0
Response to RFI 001 through 012 dated 26 March 2013
a
Response to RFI 002, 008, 013 dated 2 April 2013 m
Response to RFI 013, 025, 027 dated 4 April
