READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 04-16-13--special--rec center GMP — reading text
Part 4 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31712-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
PLAN 03/ 06/ 2013
GRA GRADING PLAN 03/ 06/ 2013
GR -5 GRADING PLAN 03/ 06/ 2013
U -1 UTILITY PLAN 01/ 10/ 2013
U -2 UTILITY PLAN 03/ 06/ 2013
D -1 DETAILS 03/ 06/ 2013
D -2 DETAILS 03/ 06/ 2013
D -3 DETAILS 03/ 06/ 2013
D- 4 DETAILS 03/ 06/ 2013
D -5 DETAILS 03106/ 2013
S0. 1 GENERAL NOTES AND TYPICAL DETAILS 03/ 13/ 2013
S1. 0 PLAN & SECTIONS 03/ 13/ 2013
SiA PLAN & SECTIONS 03/ 1312013
A0. 1 OVERALL SITE PLAN 03/ 13/ 2013
am
A0. 2 PARTIAL SITE PLAN 03/ 13/ 2013
N_
A0. 3 PARTIAL SITE PLAN 03/ 1372013
A1. 0
LARGE CONCESSION STAND PLANS &
03/ 1312013
N00
ELEVATIONS
SMALL CONCESSION STAND PLANS &
All 03/ 13/ 2013
ELEVATIONS
ao
J
A1. 2 ACCESSORY SITE STRUCTURES 03/ 13/ 2013
A2. 0 INTERIOR ELEVATIONS 03/ 13/ 2013
WALL SECTIONS, DETAILS AND DOOR & SHUTTER
A3. 0 03/ 13/ 2013
TYPES
P -001 PLUMBING LEGENDS, SCHEDULES & SCHEDULES 03/ 06/ 2013
P -101 PLUMBING PLANS - SANITARY & WATER 03/ 0612013
P -102 PLUMBING PLANS - SANITARY & WATER 03/ 06/ 2013
P -300 PLUMBING RISERS - SANIARY & WATER 03/ 06/ 2013
P -500 PLUMBING DETAILS 03/ 06/ 2013
HVAC NOTES, ABBREVIATIONS, LEGENDS &
M -001 03/ 06/ 2013
DETAILS
M -101 HVAC CONCESSION STAND FLOOR PLAN 03/ 06/ 2013
E1. 0 LEGENDS, NOTES AND SCHEDULES 0311312013
E1. 1 TYPICAL POWER & COMMUNICATIONS 03/ 13/ 2013
E1. 2 BASEBALL FIELD LIGHTING POLE ELEVATIONS 03/ 13/ 2013
E1. 3 SOFTBALL FIELD LIGHTING POLE ELEVATIONS 03/ 1312013
ElA SOCCER FIELD LIGHTING POLE ELEVATIONS 03/ 13/ 2013
E2. 0 SITE PLAN - ELECTRICAL - WEST 03/ 13/2013
41Page of I I
Lord & Son Construction Inc. 31.
Guaranteed Maximum Price
City of Fort Walton Beach
Recreation Complex
8 April 2013
Exhibit A
Description Date
n
E2. 3
SITE PLAN- ELECTRICAL - EAST
SITE PLAN - SPORTLIGHT POLE ELECTRICAL
SITE PLAN - WALKWAY LIGHTING ELECTRICAL
03/ 13/ 2013
03/ 13/ 2013
03/ 13/ 2013
EXTERIOR ELECTRICAL FIELD EQUIPMENT
E3. 0 MOUNTING DETAIL 03113/ 2013
E31 ELECTRICAL PANEL SCHEDULE 03/ 13/ 2013
CONCESSION FLOOR PLANS - POWER&
E4. 0 03113/ 2013
LIGHTING
E5. 0 BASEBALL FIELD POLE REFLECTOR ELEVATIONS 03/ 13/ 2013
15. 1 SOFTBALL FIELD POLE REFLECTOR ELEVATIONS 03/ 13/ 2013
E5. 2 SOCCER FIELD POLE REFLECTOR ELEVATIONS 03/ 13/ 2013
E6. 0 EXISTING JET DRIVE BALLFIELDS 03/ 13/ 2013
E6. 1 POLE CONFIGURATION DETAIL 03/ 13/ 2013
EXTERIOR ELECTRICAL FIELD EQUIPMENT
E6. 2 03/ 13/ 2013
MOUNTING DETAIL mm
E7. 0 OVERALL SITE PLAN - PHOTOMETRIC STUDY 03/ 13/ 2013 NN
UuD)COJN
51Page51Page ofof IIII
acKrak'acKrak' Pg.Pg. 1414.: .:
Lord & Son Construction Inc. 3. 1. a
Guaranteed Maximum Price
City of Fort Walton Beach
Recreation Complex
8 April 2013
Exhibit A
Project Manual - Design Criteria Package " A" & " B"
For Construction Set
Prepared by DC Architects
Dated March 13, 2013
No. of
DIVISION 1 - GENERAL REQUIREMENTS Pages
01 00 40 - Testing Laboratory Services 2
01 01 50 - Abbreviations and Definitions 4
01 02 50 - Payment, Modification, & Completion Procedures 7
01 09 00 - References 14
01 10 00 - Summary 1
01 20 00 - Progress Documentation & Procedures 4
01 21 00 - Allowances 2
01 30 00 - Submittals 5
0140 00 - Quality Requirements 3
m
e
01 50 00 - Temporary Facilities and Controls 5 N_
01 52 40 - Construction Waste Management 5
016000 - Product Requirements
01 70 00 - Execution Requirements
7
4
N9C0
01 77 00 - Closeout Procedures 4
01 78 20 - Operation & Maintenance Data 6 noJ
01 80 00 - Project Record Documents 3
DIVISION 2 - EXISTING CONDITIONS
02 41 16 - Structure Demolition 4
DIVISION 3 - CONCRETE
03 30 00 - Cast -In -Place Concrete 10
DIVISION 4 - MASONRY
04 23 00 - Reinforced Unit Masonry 7
04 80 10 - Unit Masonry Assemblies 10
04 90 00 - Glass Unit Masonry 3
DIVISION 5 - METALS
05 12 00 - Structural Steel 4
05 21 00 - Steel Joists 3
6 Page of I I
et Pg. 10`x;"
Lord & Son Construction Inc. 31.
Guaranteed Maximum Price
City of Fort Walton Beach
Recreation Complex
8 April 2013
Exhibit A
05 31 00 - Steel Deck 3
05 40 00 - Cold- Formed Metal Framing 4
05 50 00 - Metal Fabrications 6
05 51 10 - Metal Stairs 5
DIVISION 6 - WOOD. PLASTICS & COMPOSITS
06 10 00 - Rough Carpentry 3
06 16 00 - Sheathing 2
O6 17 53 - Shop- Fabricated Wood Trusses 3
06 20 00 - Interior Architectural Woodwork 11
DIVISION 7 - THERMAL & MOISTURE PROTECTION
07 11 13 - Bituminous Dampproofing 2
07 13 26 - Self- Adhere Sheet WP roof peel & stick 4
0721 00 - Building Insulation 4
07 24 13 - Polymer EIFS 8 vmN
0741 13. 16 - Metal Roof Panels 5
C0
07 60 00 - Roof Flashing and Sheet Metal 2
Na
0771 00 - Roof Specialties 4
c0
07 72 00 - Roof Accessories 5
a0
J
0784 13 - Through Penetration Firestop Systems 4
0792 00 - Joint Sealants 3
DIVISION 8 - DOORS AND WINDOWS
O8
