READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — March 18, 2014 — 301-3120 Fund — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 65-301-3120 Fund.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

SUNGARD PENTAMATION, INC. PAGE NUMBER: 1 DATE: 02/25/2014 OKALOOSA COUNTY BOCC AUDIT21 TIME: 14:29:26 EXPENDITURE AUDIT TRAIL SELECTION CRITERIA: orgn.fund=’301’ and orgn.orgn3=’3120’ ACCOUNTING PERIODS: 1/14 THRU 5/14 SORTED BY: FUND,DEPARTMENT TOTL,DEPARTMENT,ACCOUNT TOTALED ON: FUND,DEPARTMENT TOTL,DEPARTMENT PAGE BREAKS ON: FUND,DEPARTMENT TOTL FUND − 301 − CAPITAL PROJECTS FUND DEPARTMENT − 3120 − CAP OUTLAY PROJ−PUBSAFETY ACCOUNT CUMULATIVE DATE T/C ENCUMBRANC REFERENCE VENDOR BUDGET EXPENDITURES ENCUMBRANCES DESCRIPTION BALANCE 301−520−521−3120−3120 − CAP OUTLAY PROJ−PUBSAFETY 546620 RM−FACILITIES .00 .00 .00 BEGINNING BALANCE 01/08/14 11−4 30,830.00 BT−14−17 TOTAL RM−FACILITIES 30,830.00 .00 .00 30,830.00 562244 JAIL−REPLACE ROOF .00 .00 .00 BEGINNING BALANCE 09/30/13 11−1 225,000.00 POSTED FROM BUDGET SYSTEM TOTAL JAIL−REPLACE ROOF 225,000.00 .00 .00 225,000.00 562245 JAIL−REPLACE CHILLER .00 .00 .00 BEGINNING BALANCE 09/30/13 11−1 225,000.00 POSTED FROM BUDGET SYSTEM 02/20/14 21−5 1403237 21201551 HALIFAX MEDIA GR 222.83 .00 2021729 LEG5600 TOTAL JAIL−REPLACE CHILLER 225,000.00 222.83 .00 224,777.17 562247 SHERIFF−BRACKIN ST ROOF .00 .00 .00 BEGINNING BALANCE 09/30/13 11−1 110,000.00 POSTED FROM BUDGET SYSTEM TOTAL SHERIFF−BRACKIN ST ROOF 110,000.00 .00 .00 110,000.00 562248 SHERIFF−CAMPUS RENOVATION .00 .00 .00 BEGINNING BALANCE 09/30/13 11−1 27,000.00 POSTED FROM BUDGET SYSTEM 01/08/14 13−4 −27,000.00 BT−14−17 TOTAL SHERIFF−CAMPUS RENOVATION .00 .00 .00 .00 TOTAL DEPARTMENT − CAP OUTLAY PROJ−PUBSAFET 590,830.00 222.83 .00 590,607.17 TOTAL DEPARTMENT TOTL − CAP OUTLAY PROJ−PUB 590,830.00 222.83 .00 590,607.17 TOTAL FUND − CAPITAL PROJECTS FUND 590,830.00 222.83 .00 590,607.17 TOTAL REPORT 590,830.00 222.83 .00 590,607.17 * THERE IS A NOTE ASSOCIATED WITH THIS TRANSACTION

Download this text file with its original spacing ↓