READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2011-14-amend comp fee schedule for engineering fees — reading text

Part 6 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-26372-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Service Certification Fee Residential: Minimum Deposit 50. 00 No Change Res 1999 -04 4/ 27 10% of water service payments received No Change Ord 1773 09/ 23/ Utility Tax Commercial: Minimum Deposit 75 or 3 x minimum bill No Change Res 1999 -04 4/ 27 10% of water service payments received No Change Ord 1773 09/ 23/ Utility Tax Residential and Hydrant Meter Deposit 1, 000. 00 No Change Res 2009 -7 02 /10, u7 Commercial: Hydrant Meter Installation 25. 00 No Change Res 2009 -35 09/ 09/ 09 Construction Water Deposit 35. 00 No Change J P01 E Mf al 10. 00 No Change Res 2009 -35 09/ 09/ 09 Cleaning Water Deposit 5. 00 No Change Res 2009 -35 09/ 01 Cleaning Water Turn On/ Off Fee rater Service Connection Fees ( includes water meter and meter box) Diameter Inside City Outside City 3/ 4 inch or smaller 700 $ 840 No Change Res. 2010 -25 09/ 21 1 inch 800 $ 960 No Change Res. 2010 -25 09/ 21 1, 050 $ 1, 260 No Change Res. 2010 -25 09/ 21 1 1/ 2 inch 2 inches 1, 300 $ 1, 560 No Change Res. 2010 -25 09/ 21 3inches 3, 450 $ 4, 140 No Change Res. 2010 -25 09/ 21 4 inches 5, 100 $ 6, 120 No Change Res. 2010 -25 09/ 21 6inches 8, 100 $ 9, 720 No Change Res, 2010 -25 09/ 21 At Cost - but not less than Over 8 inches No Change Res. 2010 -25 09/ 21 9, 050 $ 10, 860 Multiple taps ( excludes water meter) 550 per unit, plus cost of water meter No Change Res. 2010 -25 09/ 21 Water Line Extensions At cost No Change Res 1999 -04 4/ 27 N Cinco Bayou Inside City costs, plus 25% No Change Res 1999 -04 4/ 27 C G Hater Meter Installation Fees ( With Existine Tao) 3/ 4 inch or smaller $ 150. 00 Res 2011 -14 06/ 1, 1 inch $ 200.00 Res 2011 -14 06/ 1, N 1 1/ 2 inch 4$ 00. 00 Res 2011 -14 06/ 1, a/ 4) 2 inches $ 500. 00 Res 2011 - 14 06/ 1, 2.500. 00 3 inches $ Res 2011 - 14 06/ 1, CD 4 inches K000.00 Res 2011 -14 06/ 1, tV r 6 inches V 000. 00 Res 2011 - 14 06/ 1, .. r Over 8 inches 8$000. . 00 Res 2011 - 14 06/ 1, r dove / Replace Meter Fees Move Meter Fee 350. 00 No Change Res 2009 -7 02/ 10 T Replace 3/ 4 inch or smaller Meter Fee 250. 00 No Change Res. 2010 -25 09/ 2! Replace 1 inch Meter Fee 275. 00 No Change Res. 2010 -25 09/ 2! M Replace 1 1/ 2 inch Meter Fee 500. 00 No Change Res 2009 -7 02/ 10 a No Change Replace 2 inch Meter Fee 750. 00 Res 2009 -7 02/ 10 = tG Replace Meter Box Fee $ 50. 00 No Change Res 2009 -7 02/ 10 teplace Meter Valve Fees ( Damaeed by Customer) d Replace I inch Meter Valve $ 150. 00 Res 2011 - 14 06/ 1, Replace 1 1/ 2 inch Meter Valve $ 200. 00 Res 2011 - 14 06/ 1, Replace 2 inch Meter Valve 3$00. 00 Res 2011 - 14 06/ 1, Replace 3 inch Meter Valve 4$ 00. 00 Res 2011 - 14 06/ 1, y Replace 4 inch Meter Valve $ 500.00 Res 2011 - 14 06/ 1, 1, 000.00 d Replace 6 inch & larger Meter Valv $ Res 2011 -14 06/ 1, 1L N Sanitary Sewer Connection Fees Flat ,- fee* - single family residential 900 per unit No Change Res. 2010 -25 09/21 V Front Footage* - exceeds 100 feet wide 9. 00 per front foot No Change Res. 2010 -25 09/ 21 900 per 4,000 sq ft No Change Res. 2010 -25 09/ 21 Commercial* - for every 4,000 sq ft of building Fee is determined by whichever calculation is greater >% Private Lift Station Registration Fee 50. 00 No Change Res 2003 -23 9/ 23 No Change Late Fee - failure to register within 90 days 50. 00 Res 2003 -23 9/ 23 08 Stormwater Management Fee tT

Download this text file with its original spacing ↓