READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2011-14-amend comp fee schedule for engineering fees — reading text

Part 4 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-26372-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

ft or fraction thereof No Change Res. 2010 -25 09/21 V N Additional Inspection Fee 38. 00 No Change Res. 2010 -25 09/ 21 d First - $ 38. 00 LL Second - $ 38. 00 No Change Re- Inspection ** Fee Third and more - $ 115. 50 Res. 2010 -25 09/ 21 d 0 Reinspection means the building inspector returns to the job site to review corrected work denied on the previous inspection for the same violation. Certificate of Occupancy 38. 00 No Change Res. 2010 -25 09/ 21 41 Certificate of Completion 38. 00 No Change Res. 2010 -25 09/ 21 A 270. 50 No Change Res. 2010 -25 09/ 21 Temporary Certificate of Occupancy Mechanical Permits and Inspection Permit Fee Base 39. 00 No Change Res. 2010 -25 09/ 21 15. 00 for the first $ 1, 000 or fraction thereof of I Inspection of heating, ventilation, ductwork, air the valuation of installation plus $ 2. 75 for each No Change Res. 2010 -25 09/ 21 i conditioning and refrigeration systems additional $ 1, 000 or fraction thereof d Inspecting repairs, alterations, and additions on 5. 80 plus $ 3. 45 for each additional $ 1, 000 or No Change Res. 2010 -25 09/ 21 •_ C Iv existing systems fraction thereof Inspecting Boilers W Boiler Inspections 40. 00 No Change Res. 2010 -25 09/ 21 C Reinspection of a heating, ventilation, air First - $ 38. 00 tv conditioning or refrigeration system, or boiler Second - $ 38. 00 No Change Res. 2010 -25 09/ 21 E inspection (reinspection same as above) Third and more - $ 115. 50 V Inspection for permitting temporary operation of First - $ 38. 00 Second - $ 38. 00 No Change Res. 2010 -25 09/ 21 Q heating, ventilating, refrigeration, or air condition system ( reinspection same as above) Third and more - $ 115. 50 Reduced by 50% housing, unless permit is for Rehabilitation of substandard minimum of $5. 00. Repairs, alterations and No Change Res 2003 -01 1/ 28 additions to an existing system under $ 500. 00 Plumbing and Gas Permits Base Permit Fee 39. 00 No Change Res. 2010 -25 09/ 21 Plus, per plumbing fixture, floor drain or trap, 3. 45 No Change Res. 2010 -25 09/ 21 including water and drainage pipe Plus, per sewer connection 12. 00 No Change Res. 2010 -25 09/ 21 Plus, per water heater and/ or vent 3. 15 No Change Res. 2010 -25 09/ 28/ 10 For installation, alteration or repair of water piping No Change 6. 05 ua ' gE E and/ or water treating equipment 0 , r, n , W 6. 05 No Change Res. 2010 -25 09/ 28/ 10 For repair /alteration of drainage or vent piping $ For vacuum breakers or backflow protective devices 1 to 5 - $ 3. 15 No Change Res. 2010 -25 09/ 21 subsequent to the installation of the piping or over 5, each - $ 2.05 equipment served First - $ 38. 00 Reinspection for faulty materials, equipment Second - $ 38. 00 No Change Res. 2010 -25 09/ 21 apparatus or workmanship Third and more - $ 115. 50 Electrical Permits Base Permit Fee 39. 00 No Change Res. 2010 -25 09/ 21 Plus, per circuit 1. 85 No Change Res. 2010 -25 09/ 21 18. 50 No Change Res. 2010 -25 09/ 21 Temporary pole First - $ 38. 00 Reinspection for faulty materials, equipment, Second - $ 38. 00 No Change Res. 2010 -25 09/ 21 apparatus or workmanship Third and more - $ 115. 50 r Rehabilitation of substandard Reduced by 50% housing minimum of $3. 00 No Change Res 2003 -01 1/ 28 N Early Power Fee 38. 00 No Change Res. 2010 -25 09/ 21 r_ G Code Enforcement Board r No Change Res 2003 -01 1/ 28 Fines

Download this text file with its original spacing ↓