READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2011-14-amend comp fee schedule for engineering fees — reading text

Part 3 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-26372-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

IL N N d V d r A 5 D 08 0 C L d C UJ FJ E dd R Q 11TNf_PF.RMTT FFF.R ( RPC. 3. 02. 05)* A surcharge will be collected in accordance with and for the purposes stated in F. S. 468. 631 and F. S. 553. 721. Res. 2010 -25 09/ 21 General Fees Contractors Registration 40. 25 No Change Res 2008 -15 04/ 01 22. 50 No Change Res. 2010 -25 09/ 21 Building permit processing fee 25. 75 per submittal SFD Revisions to approved permit, per submittal 51. 50 per submittal MF No Change Res 2008 -15 04/ 07 77.25 per submittal Corn Penalty for commencement prior to permitting (Sec. 300% of permit fee or $250, whichever is greater No Change Res 07 -15 09/ 05, 3. 01. 05) Change of contractor, transfer of permit Prorate balance of work No Change Res 2003 -01 1/ 28 Sec. 3. 01. 12) Expired permit ( Sec. 3. 01. 08) Re- issuance requires fee to be paid No Change Res 07 -15 09/ 05, r r Conditional; no work has commenced and permit Refund of permit fee ( Sec. 3. 01. 10) No Change Res 07 -15 09/ 05, r has not expired; requires written notice to the BO N Construction Permit Fees C O No permit required for cosmetic work only, such O as carpet, tile, painting, landscaping, etc. No Change 500 or less Exceptions include any structural change or any Res 07 -15 09/ 05, C H work that requires an inspection per the FBC. E) 39. 00 for the first thousand, plus $ 6. 60 for each 501 to $ 50, 000 additional thousand or fraction thereof, to and No Change Res. 2010 -25 09/ 21 cc Permit based on value including $50, 000 N of work, includes labor, 360. 55 for first $50, 000 plus $5. 25 for each materials, site work, 50, 001 to $ 100, 000 additional thousand or fraction thereof to and No Change Res. 2010 -25 09/ 21 r' and design fees including $ 100, 000 623. 00 for the first $ 100, 000 plus $ 4. 00 for each 100, 001 to $ 500, 000 additional thousand or fraction thereof to and No Change Res. 2010 -25 09/ 21 G including $500, 000 Nd 2, 219. 00 for the first $500, 000 plus $ 2. 75 for No Change Res. 2010 -25 09/ 21 = 500, 001 and up each additional thousand or fraction thereof @ No Change Res 2009 -35 09/ 01 Plan check fee 50% ofbuilding fee ( Sec. 3. 02. 06) V 206. 00 No Change Res 2008 -15 04/ 01 GI Threshold building transmittallprocessing fee/ ICC 3 113. 50 No Change Res 2008 -15 04/ 0. Moving Fee Demolition Fee 59. 50 plus $9. 45 per 2, 000 sq ft above 20, 000 sq

Download this text file with its original spacing ↓