READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2011-14-amend comp fee schedule for engineering fees — reading text
Part 3 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-26372-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
IL
N
N
d
V
d
r
A
5
D
08
0
C
L
d
C
UJ
FJ
E
dd
R
Q
11TNf_PF.RMTT FFF.R ( RPC. 3. 02. 05)*
A surcharge will be collected in accordance with and for the purposes stated in F. S. 468. 631 and F. S. 553. 721. Res. 2010 -25 09/ 21
General Fees
Contractors Registration 40. 25 No Change Res 2008 -15 04/ 01
22. 50 No Change Res. 2010 -25 09/ 21
Building permit processing fee
25. 75 per submittal SFD
Revisions to approved permit, per submittal 51. 50 per submittal MF No Change Res 2008 -15 04/ 07
77.25 per submittal Corn
Penalty for commencement prior to permitting (Sec. 300% of permit fee or $250, whichever is greater No Change Res 07 -15 09/ 05,
3. 01. 05)
Change of contractor, transfer of permit
Prorate balance of work No Change Res 2003 -01 1/ 28
Sec. 3. 01. 12)
Expired permit ( Sec. 3. 01. 08) Re- issuance requires fee to be paid No Change Res 07 -15 09/ 05, r
r
Conditional; no work has commenced and permit
Refund of permit fee ( Sec. 3. 01. 10) No Change Res 07 -15 09/ 05, r
has not expired; requires written notice to the BO N
Construction Permit Fees C
O
No permit required for cosmetic work only, such
O
as carpet, tile, painting, landscaping, etc. No Change
500 or less
Exceptions include any structural change or any
Res 07 -15 09/ 05, C
H
work that requires an inspection per the FBC.
E)
39. 00 for the first thousand, plus $ 6. 60 for each
501 to $ 50, 000 additional thousand or fraction thereof, to and No Change Res. 2010 -25 09/ 21 cc
Permit based on value including $50, 000 N
of work, includes labor,
360. 55 for first $50, 000 plus $5. 25 for each
materials, site work,
50, 001 to $ 100, 000 additional thousand or fraction thereof to and No Change Res. 2010 -25 09/ 21 r'
and design fees
including $ 100, 000
623. 00 for the first $ 100, 000 plus $ 4. 00 for each
100, 001 to $ 500, 000 additional thousand or fraction thereof to and No Change Res. 2010 -25 09/ 21 G
including $500, 000
Nd
2, 219. 00 for the first $500, 000 plus $ 2. 75 for
No Change Res. 2010 -25 09/ 21 =
500, 001 and up each additional thousand or fraction thereof
@
No Change Res 2009 -35 09/ 01
Plan check fee 50% ofbuilding fee ( Sec. 3. 02. 06)
V
206. 00 No Change Res 2008 -15 04/ 01 GI
Threshold building transmittallprocessing fee/ ICC
3
113. 50 No Change Res 2008 -15 04/ 0.
Moving Fee
Demolition Fee
59. 50 plus $9. 45 per 2, 000 sq ft above 20, 000 sq
