READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2011-14-amend comp fee schedule for engineering fees — reading text

Part 12 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-26372-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

0101 63 ( delivery, one dump, removal) CC 4 CY Dumpster Rental No Change Res 07 -15 09/ 05/ 43 each additional dump tMtM CC 71 ( delivery, one dump, removal) WW 6 CY Dumpster Rental No Change Res 07 -15 09/ 05/ 54 each additional dump rr 8 CY Dumpster Rental 80 ( delivery, one dump, removal) No Change Res 07 -15 091051 Cd 60 each additional dump EE UU tDtD r+ r+ QQ

Download this text file with its original spacing ↓