Fort Walton Beach Council agenda — 05-25-2010 Regular — reading text
Part 9 of 31. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-25162-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Provide stormwater treatment for 8 medium density residential acres of drainage area
within the Gap Creek Basin that directly impacts the water quality of Cinco Bayou and
Choctawhatchee Bay.
2. Reduce the nonpoint source pollutant loading of nutrients, suspended solids, heavy metals,
and other urban non -point source pollutants into the Choctawhatchee Bay system. Restore
and protect the natural biological communities, recreational and aesthetic qualities of this
diverse resource for future generations.
3. Provide additional storage and attenuation of stormwater to help reduce non -point source
pollution in an industrial area that has a potential for significant pollutant loading related this
type of land use activities in the watershed. Attenuation of flow will also provide flood relief
for downstream areas near Gap Creek.
4. Increase public awareness of the value of area water resources, the importance of
preventing non -point source pollution, and best management practices for pollution
prevention.
PROJECT DESCRIPTION:
The proposed stormwater retrofit pollution reduction project will consist of a drilled down residential
community pollution education outreach program and a treatment retrofit including the following
components:
Bay Street Bioretention
The existing . 1 acre retention area designed as a dry pond does not perform as designed and
holds water for prolonged periods of time. Proposed improvements include bottom filtration for
solids removal with lateral conveyance to Gap creek, bio retention construction, and plant
selection that will optimize nutrient uptake, and increase evapotranspiration. Proper plant
selection will assure that the project is aesthetically pleasing and will garner public support and
protection.
2. Burnette Avenue Bioretention
Proposed improvements
The existing depressed gravel area provides negligible treatment.
include removing the gravel, increasing the depression and providing bottom filtration for solids
removal with lateral conveyance to Gap Creek. Similar to Bay Street, Bio retention construction,
and plant selection will optimize nutrient uptake and increase evapotranspiration. Proper plant
selection will assure that the project is aesthetically pleasing and will garner public support and
protection.
29_
3. Public Outreach and Education
CBA is a local community based organization dedicated to protecting the Choctawhatchee Bay
system.
They provide public education about environmental stewardship and organize public
involvement related to trash clean up events and restoration projects on and around the bay.
CBA often partners with the City to help publicize the City' s projects and other programs
directed at reducing nonpoint source pollution to the bay and other conservation measures to
reduce pollution and protect natural resources.
CBA will be a partner on this project to increase public awareness of the value of area water
resources, the importance of preventing non -point source pollution, and best management
practices for pollution prevention.They will provide public outreach specific to the immediate
residential community and educational press releases about the project. A "volunteer event( s)"
will be coordinated by CBA during the project for volunteers to participate with helping plant
native vegetation in the littoral zones of the facilty and /or provide trash cleanup around the
project site and in the watershed.
As the construction of the facility nears completion, the City and CBA will partner to provide an
on site program for the residents. This program will be developed to inform attendees of the
purpose for the construction project, provide information about the Gap Creek Watershed and
the path that contributing runoff takes once it leaves their home, and provide information
regarding efforts each household can take to enact water quality improvements.
ICIIII
ESTIMATED POLLUTANT LOAD REDUCTION:
Other Other
BMPs Installed
7SS TPN Sediment ... BOD k
8oretentton kgl,.
yr kgfYr' k9 /yr kg /yr k9 /yr s
H Pre -Project 287,000 2, 197 13, 114 52, 232
a
Post -Project 280, 000 2, 194 12, 922 51, 000
M, Load
2 7, 000 3 192 1, 232
Reduction
0
a. 2%
Reduction 2% 1% 1%
CMther Other
TNT=
TSS TP Sedimen# gOp= l r k I r
kgrYr kglyr kq yr
/ kg /yr kg /Yr .':
N
Pre -Project
V
M
Post -Project
M Load
Reduction
6
a
Reduction
th er er
TSS t' TN 8. d! mient gOD k I r k I r
kg y
/r kglyr is
kglyr kg /yr kg /yr
a
Pre -Project
cv
5 Post -Project
a Load
Reduction
5
Reduction
Other Other
TSS TP TN 3ed nent BOD
70fiAL 0.
N Pre -Project
M
Post- Project
Load
Reduction
0
a F0/1 Reduction
77. :, Pf
MODELMODEL USED:USED:
TheThe pollutantpollutant loadload reductionreduction waswas estimatedestimated usingusing thethe SpreadsheetSpreadsheet ToolTool forfor thethe Estimation Estimation ofof
( ( STEPL),STEPL), versionversion 4.4. 1.1.
Pollutant Pollutant LoadLoad TheThe estimatedestimated combinedcombined BMPBMP efficiencyefficiency forfor thethe treatmenttreatment
train,train, includingincluding thethe proposedproposed sandsand filter,filter, thethe meanderingmeandering vegetated vegetated swale,swale, andand thethe proposedproposed
detentiondetention pond,pond, waswas calculatedcalculated usingusing thethe BMPBMP Calculator Calculator includedincluded inin STEPLSTEPL 4.4. 11 andand thenthen enteredentered
intointo thethe STEPLSTEPL spreadsheetspreadsheet calculator.calculator.
LANDLAND OWNERSHIP OWNERSHIP STATUS:STATUS:
31-31-
The property required for the construction of the vegetated swale and the dry detention pond are
within existing City Rights of Way.
TASK NARRATIVE:
Task 1: Construction Plans and Permitting
Permitting and construction plans will be developed for the proposed improvements. Plans will
meet NPDES, ERP and local permitting requirements and will include plans for wetland plantings.
Task 2: Construction
After permits have been received, the projects will be bid and construction of the treatment train
will be completed. Inspections by City personnel and the Northwest Florida Water Management
District will insure that the improvements are built according to plans and specifications and meet
permit and grant requirements.
Task 3: Public Education
CBA and the City will organize an on site education program for the residents located in the
contributing area. This program will be developed to inform the residents of the purpose for the
construction project, provide information about the Gap Creek Watershed and the path that
contributing runoff takes once it leaves their home, and provide information regarding efforts each
individual can take to enact water quality improvements. Educational signage will be provided to
inform the public about the water quality aspects of wetlands, the value of area water resources,
the importance of preventing non -point source pollution, and best management practices for
stormwater treatment.
Task 4: Monitoring
A detailed monitoring plan will be developed and submitted for review after grant award. Base flow
and storm event monitoring upstream and downstream of the proposed BMPs will be implemented
to demonstrate the effectiveness of these practices at reducing pollutant loads and protecting the
downstream water bodies.
Task 5: Grant Administration and Reporting
This task will include submittal of quarterly and annual reports on project activities. The City will be
the lead entity responsible for drafting and submitting the reports. The NWFWMD will provide
input and review for all reporting. All reports will be delivered to the FDEP project manager for the
319 grant program.
A draft report will be delivered to FDEP for the project describing the construction phase, post -
construction monitoring activities and evaluation of the effectiveness of the BMPs. The pollutant
efficiency removal measured by the post construction monitoring will be evaluated to determine the
effectiveness of the BMPs and qualitative and quantitative water quality impacts to the receiving
water bodies including Gap Creek, Cinco Bayou and Choctawhatchee Bay. After review and
comment by FDEP, a final project report will be provided. A Quality Assurance Project Plan
QAPP) will be submitted and monitoring results will be uploaded to the EPA STORET database or
the successor database to STORET
32-
PROJECT MILESTONES /DELIVERABLES:
Task Act v Deliverables Start:'; Ga,rriplee :;
Contract w/ FDEP signed