READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 05-25-2010 Regular — reading text
Part 4 of 31. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-25162-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
the supporting agencies. A portion of the match is also contributed
through the easement acquisition to expand the existing retention pond.
4. RECOMMENDATION:
4. 1 Staff requests City Council approval to submit a FY 2011 Section 319 Grant Proposal
Application for the improvement of water quality and flood attenuation of the Gap Creek
Watershed to expand an existing retention pond on DRS Technologies, Inc. property at
645 Anchors Street NW.
5. ATTACHMENTS:
5. 1 Section 319 Grant Application
5. 2 Letters of Support from Okaloosa County and Choctawhatchee Basin Alliance
5. 3 Project Drawing
6. SIGNATURE BLOCK:
6. 1 Submitted By: . C`. uol-,
Sam Wilson, Stormwater Operations Manager
6. 2 Reviewed and Concur:
Michael D. Beedie, P. E.
Engineering & Utility Services Director
6. 3 Reviewed and Concur:
y fir,
Finance Director
6. 4 Reviewed for Agenda: A&jL/ lne& n"
l%
T. Meares, City Manager
9-
FY2011 SECTION 319 GRANT PROPOSAL APPLICATION
PROJECT: GAP CREEK WATERSHED WATER QUALITY IMPROVEMENTS ( PHASE II)
PROJECT FUNDING: $ 260, 000 FY2011 319 $ 1831000 Match
LEAD ORGANIZATION: City of Fort Walton Beach, Florida
CONTACT PERSON: Mr. Michael Beedie, PE
Name, Address, Phone)
Engineering & Utility Services Director
Engineering Services Department
City of Fort Walton Beach
P. O. Box 4009
Fort Walton Beach, FL 32549
850) 833 -9612
mbeedie @fwb. org
COOPERATING ORGANIZATIONS:
1. City of Fort Walton Beach
2. Okaloosa County
3. Northwest Florida Water Management District
4. Choctawhatchee Basin Alliance
5. DRS Technologies, Inc.
PROJECT ABSTRACT:
The stormwater management system in the Gap Creek Drainage Basin, located in both the City of
Fort Walton Beach and in unincorporated Okaloosa County, is inadequate to provide full water
quality treatment and flood attenuation. Runoff from portions of the basin receives little or no water
quality treatment before discharging downstream into Gap Creek, a tributary to Class III Water
Cinco Bayou. A stormwater master plan was prepared for Okaloosa County by HDR Engineering
in April 2003; the Gap Creek watershed was modeled and shown to have one of the highest
pollutant loading rates in Okaloosa County. In a 2008 cooperative effort, the Northwest Florida
Water Management District, Okaloosa County and the City of Fort Walton Beach funded a detailed
study of the Gap Creek watershed. The purpose of this study was to identify and prioritize
stormwater Best Management Practice ( BMP) opportunities for enhancing treatment and pollutant
loading reduction capability. within the Gap Creek watershed.
Of the nineteen sites within the Gap Creek watershed recommended for retrofit opportunities that
provide pollutant loading reduction, eight also have the potential to reduce flood risk in localized
areas of the watershed. The BMP structural improvement chosen for this grant application has the
potential to provide both water quality improvement and flood attenuation. The proposed project
includes a treatment train comprised of modifying an existing conveyance channel to provide an in
line wet detention facility which will provide additional treatment and attenuation. Monitoring will be
conducted prior to and after completion of construction at the inflow and outflow of the proposed
BMP to determine the system' s effectiveness.
The City will design and manage implementation of the improvements, manage the grant and
execute all reporting activity. The District will provide technical assistance on the project and
assistance and training with water quality monitoring and assessment of BMP effectiveness. CBA
will provide public outreach and educational press releases about the project.
10-
It is important to note that this project is an integral follow up project to the activities described in
the Okaloosa County application submitted in 2009 that was selected for approval.
PROJECT LOCATION AND WATERSHED CHARACTERISTICS:
Gap Creek is located in the Fort Walton Beach area of Okaloosa County. The creek has two
tributaries that originate in the western portion of the drainage area and flow eastward into Cinco
Bayou, a Class III water body used heavily as a recreational area. Cinco Bayou is an embayment
along the western shoreline Choctawhatchee Bay ( a priority water body of the Northwest Florida
Water Management District's SWIM program).
The Choctawhatchee Bay has a surface area of approximately 129 square miles. The greatest
source of fresh water into the bay is the Choctawhatchee River that flows into the eastern end of
the bay. East Pass, located near the western end of the bay immediately west of Destin, is the
only direct opening to the Gulf of Mexico. The bay also opens to Santa Rosa Sound at the western
most end of the bay and the Intracoastal Waterway on the east end of the bay that winds its way to
West Bay ( part of the St. Andrew Bay system).
The river and bay system include a diverse array of natural communities. The estuary supports sea
grass beds, oyster bars, tidal marshes and unvegetated soft bottom habitats. The
Choctawhatchee River and Bay system remains biologically diverse and productive and continues
to support a rich ecology and provide an economic, recreational and aesthetic resource for the
region. Among the environmental resources are diverse aquatic and wetland habitats, vast forests,
Floridan Aquifer springs, steephead streams, and many species of flora and fauna including the
endangered Okaloosa darter (Etheostoma oka /oosae).
Benefits provided by these natural resources include commercial and recreational fisheries, marine
transportation, military uses, outdoor recreation, tourism, aesthetic qualities, and economic benefits
associated with all of these activities. In a 2006 study by the Haas Center for Business Research
that was commissioned by CBA, it was estimated that the total economic effects in the region
related to the Bay include: 36, 030 jobs, 2. 4 billion in gross regional production and 2. 3 billion in
personal income. The report also concluded that improved water quality in the Bay will have a
direct positive effect on the economy including increased tourist /recreational expenditures as more
visitors come to the Bay.
While the Choctawhatchee River and Bay watershed continues to support outstanding resources, it
has also experienced many of the impacts that are common to Florida estuaries. These include
urban stormwater runoff and other nonpoint sources of pollution, widespread sedimentation and
habitat loss and degradation. Cumulatively, these impacts have degraded the productivity of the
Effective control of nonpoint source
river and bay system and diminished the benefits it provides.
pollution can help to preserve and restore the natural resources and human benefits provided by
the Choctawhatchee River and Bay system and limit the need for more expensive and difficult
solutions in the future.
Watershed Name: Choctawhatchee Bay
Latitude: 30. 4229
Longitude: 86. 6584
Hydrologic Unit Code( HUC): 03140102
Land Uses within the Watershed ( acres and percentages of total):
POLLUTION REDUCTION STRATEGY:
Okaloosa County completed a Stormwater Master Plan in 2003 to provide a comprehensive
evaluation of stormwater infrastructure needs including analysis of water quality and flooding
issues. The master plan included a comparative pollutant loading analysis of watersheds for total
nitrogen, total phosphorous, total suspended solids and BOD. The analysis showed that the Gap
Creek watershed had one of the highest loading rates for these pollutants in Okaloosa County.
Based on the analysis of the Stormwater Master Plan, the Gap Creek Watershed Water Quality
Improvements study ( November 2008) was funded to identify specific stormwater retrofit
alternatives for improving water quality and reduce flooding in the watershed. This application is
for one of three retrofit projects that the City of Fort Walton Beach is planning to complete next
year.
The two remaining projects, Burnette Avenue retrofit and Bay Street retrofit, are proposed in
a separate FY2011 -319 funding application. These efforts are directed under the City' s
Stormwater Utility which will fund the matching dollars proposed for all of the projects. All of these
projects will work in conjunction with the improvements that Okaloosa County proposed in the
FY2010 -319 Grant Cycle. Combined the projects will effectively implement recommendations in
the Okaloosa Master Stormwater Plan for the Gap Creek watershed to reduce the loading of
nonpoint source pollutants into Gap Creek, Cinco Bayou and ultimately Choctawhatchee Bay.
This project is also consistent with the 2002 update of Northwest Florida Water Management
District' s Surface Water Improvement and Management ( SWIM) Plan for Choctawhatchee River
and Bay system. Recommendations in the SWIM plan include the assessment and abatement of
non -point source pollution with an emphasis on urban stormwater runoff and implementation of
urban BMP demonstration projects that include monitoring to demonstrate the applicability of
BMP' s implemented.
The specific pollutant load reduction strategy of this project includes retrofitting a straight line, man
made conveyance system with the development of an in line wet detention pond. The retrofit will
provide treatment for a 78 acre industrial complex in which the majority of the properties do not
have adequate treatment or attenuation infrastructure. The capacity of the proposed wet detention
facility will provide increased retention time during which strategically located littoral zones planted
with native vegetation will allow for nutrient uptake, removal of additional suspended solids and
reduction of BOD. The increased capacity of the facility will also provide attenuation to reduce flow
rates which will decrease down stream erosion. The littoral zones will be designed and constructed
within the facility in a manner to assist in the prevention of short circuiting. The wet pond outlet
structure will be designed and constructed with a skimmer that will prevent oil, grease and floating
debris from being carried downstream.
12-
PROJECT OBJECTIVE( S):
Gap Creek flows into Cinco Bayou which is a Class III water body used heavily as a fishing and
recreational area. Cinco Bayou outfalls into western Choctawhatchee Bay a SWIM priority
waterbody of the Northwest Florida Water Management District' s Surface Water Improvement and
Management ( SWIM) program. The bay system has historically been used as a " sink" for point
source and nonpoint source pollution. Simultaneously, development has displaced habitat in the
watershed and created direct and
