READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 05-25-2010 Regular — reading text
Part 3 of 31. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-25162-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
package be considered for a future agenda in
regards to his benefits and salary as he was hired well below the previous City Manager. He said the City
Manager has proven himself to Council and it is something that should be discussed. The Mayor
suggested this could be something to discuss at the budget policy meeting on May 18th.
CITY MANAGER REPORTS
The City Manager provided up -to -date information on the City' s response to the deepwater horizon oil
spill.
He reported the City' s action has been pro- active and preventative to the greatest extent possible
and discussed future plans to address the situation. He mentioned that a video has been made of the entire
shoreline of Fort Walton Beach to serve as a visual record of the " before" condition in the event there
were to be effects of crude oil contamination; that staff has planned a shoreline clean -up along City
owned property. on Friday by volunteers to be supervised by staff, that the City has mobilized to the
extent necessary without incurring any extraordinary costs and most efforts to date have been done by
staff with no expenditures;
that the City has prepared a contingency plan to identify environmentally
sensitive areas; that particular attention is being paid to the stormwater outfalls that have the recently
installed stormwater separator units; and that the City will employ screening material along the shoreline
of City owned property to reduce the effect of contamination should the oil reach these areas. He
encouraged private property owners to remove debris from the shoreline to minimize the effects of any
crude oil contamination.
MAYOR/COUNCIL COMMENTS
Ms. gossom expressed appreciation for the time she was able to spend at the fire station last week and
reminded Council she will be unable to attend the next Council meeting.
Mr. Reeves thanked Linda Evanchyk for her service as a teacher.
Mr. Nabors discussed the effects of offshore drilling on the military mission and the tourism industry and
requested another resolution with firmer language opposing offshore drilling be sent to the legislature.
The City Manager acknowledged a resolution can be prepared for Council' s consideration.
Mr.
Rynearson mentioned he was honored to have the privilege of personally escorting two WWII
7th
veterans in the Emerald Coast Honor Flight to Washington D.C. and he thanked the Fort Walton
Beach community for the homecoming staged for the distinguished veterans upon their return. He also
thanked Linda Evanchyk for her service as a teacher.
The Mayor mentioned the Eglin Growth Management Team will hold a public hearing at the Northwest
7th
Florida State College on June at 6: 00 p.m.; he attended a Continuum of Care meeting; the excellent
May Day festival at Chester Pruitt Park; the Peace Officers Memorial ceremony this Friday at 6: 40 a.m.
in front of the public safety buildings; the celebration day events for veterans on May 5th with the Honor
Flight, the welcome home event for the Vietnam veterans, and the dedication ceremony for the UH1N
medi -vac; noted Council was provided a legislative recap from The Advocacy Group; and mentioned the
Charter Boat Captains are working on a resolution to support an early open of the red snapper season.
5-
Regular Council meeting 5 - 11 - 10
ADJOURNMENT
Being no further business, the meeting adjourned at 7: 10 pm.
DUN GIB / l i
MAYOR:
ATTEST:
CITY CLERK
ddm
Date completed: 5 -13 - 10
6-
CITY COUNCIL MEETING
May 25, 2010
Consent Agenda
Submission of Grant Application
Synopsis: Application for a FDEP grant to expand an
existing stormwater retention pond in the Gap Creek
watershed area
Agenda Item Number: 8. 2
CITY OF FORT WALTON BEACH
MEMORANDUM
To: Robert T. Mearns, City Manager
From: Sam Wilson, Stormwater Operations Manager
Through: Michael D. Beedie, P. E., Engineering & Utility Services Director
Date: May 18, 2010
Subject: Section 319 Nonpoint Source Management Program Grant Proposal for
Expansion of DRS Technologies, Inc. Retention Pond at 645 Anchors Street NW
1. BACKGROUND:
1. 1 Gap Creek is located in the Greater Fort Walton Beach area of Okaloosa County. The
headwaters of the creek are in the wetlands west of Martin Luther King Boulevard. The
tributaries that flow eastward and join near the Overbrook
creek exists as two
Subdivision, continuing eastward and flowing into Cinco Bayou at the Gap Creek Bridge
on Beal Parkway ( State Road 189). Cinco Bayou is a Class III water body that is used
The
heavily as a recreational area and outfalls into western Choctawhatchee Bay.
watershed surrounding Gap Creek is approximately 2.9 square miles in area.
1. 2 Most of the Gap Creek watershed is built out, primarily consisting of residential
neighborhoods constructed between the 1950' s and the present. There is an industrial
park area, the Fort Walton Beach Commerce and Technology Park,
which exists
primarily south of Lovejoy Road and some commercial and multi -family development
west of Martin Luther King Boulevard. The undeveloped portion of the watershed is
limited to the western edge and northwestern corners of the watershed, which are part of
Hurlburt Field / Eglin Air Force Base and are comprised of wetland and forested areas,
and a patch of wetlands in the central portion of the watershed north of the creek.
1. 3 In January of 2008, the City partnered with Okaloosa County to identify stormwater Best reduction
Management Practice ( BMP) opportunities for improving the pollutant
capability within the Gap Creek watershed. The result of this partnership was the Gap
Creek Water Quality Study ( GCWQS), which was completed by HDR Engineering, Inc.
One of the objectives for the project was to identify opportunities for upgrading existing
stormwater treatment BMPs and provide for additional stormwater retrofit opportunities.
This document identified several million dollars worth of needed water quality
improvements within the City of Fort Walton Beach and Okaloosa County.
7-
2. DISCUSSION:
2. 1 Staff is in the process of finding ways to maximize and secure funding for the Gap Creek
watershed. Currently, there are available grant monies through the Florida Department of
Environmental Protection' s ( FDEP) Nonpoint Source Management section. The FDEP
has received funding from the United States Environmental Protection Agency ( EPA)
through Section 319 of the Federal Clean Water Act. The grant funds the FDEP
administers are used to implement projects to reduce nonpoint sources of pollution.
Nonpoint source ( NPS) pollution refers to diffuse sources of pollution, such as
stormwater runoff from urban areas and agricultural operations.
2. 2 Using the GCWQS and feed back from local business owners and homeowners within
the Commerce and Technology Park and the Sylvania Heights
Community, Staff
identified the Aerotek Ditch, which is in close proximity to Sites 13 and 14 of the study,
as a possible area to implement stormwater BMP' s.
2.3 Staff is currently working with Goodwyn, Mills and Cawood, Inc., the Choctawhatchee
Basin Alliance, the Northwest Florida Water Management District, Okaloosa County, the
Sylvania Heights Community, and DRS Technologies, Inc. to prepare the documentation
necessary to submit a Section 319 grant application with supporting documentation to the
FDEP for the following project:
2. 3. 1
The proposed improvements include the expansion of an existing retention pond
to create a wet detention pond on DRS Technologies, Inc. property at 645
Anchors Street NW. The overall objectives of the project are as follows:
2. 3. 1 Provide stormwater treatment for 86 industrial acres of drainage area
within the Gap Creek Basin that directly impacts water quality of Cinco
Bayou and Choctawhatchee Bay.
2. 3. 2 Reduce the nonpoint source pollutant loading of nutrients, suspended
heavy metals, and other urban non -point source pollutants in the
solids,
Choctawhatchee Bay system. Restore and protect the natural biological
communities, recreational and aesthetic qualities of this diverse resource
for future generations.
2. 3. 3
Provide additional storage and attenuation of stormwater to help reduce
non -point source pollution in an industrial area that has a potential for
significant pollutant loading related to this type of land use activities in the
watershed. Attenuation of flow to provide flood relief for downstream
areas near Gap Creek.
2. 3. 4 Increase public awareness of the value of area water resources, the
importance of preventing non -point source pollution, and best
management practices for pollution prevention.
2. 4 In May 2009, Okaloosa County submitted a Section 319 grant application to FDEP for
downstream improvements to the same drainage network and was awarded funding. The
8-
City of Fort Walton Beach was named as a contributing agency in the County' s grant
application, and funding is expected to be received in September 2010.
2. 5 The deadline to submit grant applications for the Section 319 program is May 28, 2010.
Upon approval by City Council to submit the proposed Section 319 grant application,
Staff will forward the package to FDEP for their review.
2. 6 If awarded, the funding would not be available from FDEP until approximately
September 2011.
3. FINANCIAL INFORMATION:
3. 1 The total estimated cost to complete the proposed improvements is $ 443, 000. The
Section 319 program requires a 40% match from the City and supporting agencies. The
match will be acquired through in -kind services and cash, which is available through the
equipment, CIP 5403 ( Water Quality
Stormwater Utility via personnel, materials,
Initiative), and
