READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 03-09-2010 Regular — reading text
Part 6 of 37. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-25146-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
O
o
O
o •
d' N
O
U
U
O N
m
C
O N
c w
0 U-- a) °
Ups N
U O
O
U
4-'4-1
0 N O
C
LL-
fu
3 E cn
C '
O
p 00 m
N U O
o
fu
Ln
C
O >
I Q= 0a
22_
Robert Mearns
From: Samantha Abell
Sent: Monday, March 01, 2010 10: 58 AM
To: Robert Mearns
Cc: Michael Beedie
Subject: FW: TBA at 25 U. S. Highway 98 - Ft. Walton Beach
Follow Up Flag: Follow up
Flag Status: Flagged
Attachments: TBASOW2009petrol- FWB. doc
TBASOW2009petrol
FWB. doc ( 55 K...
Work is scheduled to begin May 10th.
Thanks,
Samantha D. Abell, Planning Manager
Engineering Services Department -
Planning and Economic Development Division
850- 833 -9604 ( office) 850 -585 -3260 ( cell) 850- 833 -9926 ( fax) sabell @fwb.org
City of Fort Walton Beach
P. O. Box 4009, Fort Walton Beach, FL 32549
Original Message---- -
From: Estelle Jones
Sent: Wednesday, February 17, 2010 4: 17 PM
To: Samantha Abell
Cc: Michael Beedie
Subject: FW: TBA at 25 U.S. Highway 98 - Ft. Walton Beach
Michael /Samantha,
Attached is the proposed scope of work for 25MSP to be funded and managed by EPA Region 4 staff. Work is
tentatively scheduled to begin the week of May 10. EPA has asked for comments on the Scope from City staff
by this Friday.
The summary is located on page 1 in the first paragraph and essentially includes a more extensive Phase II,
complete removal of the UST's, required closure assessment report and other documentation required to be
submitted to the state ( FDEP), soil and water samples and analysis, and a detailed clean -up options and cost
estimates report.
Typically UST removals are not included as part of these grants, but to our advantage, was added to the SOW
after speaking on the phone more extensively about the project.
I have reviewed the entire scope and only have 1 minor comment:
that the project team be advised the site is located very close to the Sound and there is a fairly high water table.
IPVI
Other than that, I just need to e -mail her back by this Friday am to confirm we approve of the SOW.
Thank You,
Stella Jones, Planner II
Engineering Services Department
City of Fort Walton Beach, FL
Ph: ( 850) 833 -9697
F: ( 850) 833 -9926
www.fwb.org
Original Message---- -
From: O1son.Margaret @epamail. epa.gov [ mailto: Olson.Margaret@epamail. epa.gov]
Sent: Wednesday, February 17, 2010 2: 02 PM
To: Estelle Jones; Webster, Alex
Cc: Norman.Michael @epamail. epa.gov
Subject: TBA at 25 U.S. Highway 98 - Ft. Walton Beach
Hi Stella and Alex,
Please read over the Statement of Work I have prepared for the upcoming
TBA and let me know if you think I should add or delete any language.
Please give me any comments by this Friday (2/ 19) so I can send it to
EPA Headquarters on Monday. If you need more time please let me know.
See attached file: TBASOW2009petrol- FWB. doc)
Also, Alex can you let me know who at FDEP I should contact about
getting access to any files on this site.
Thanks,
Margaret
Margaret A. Olson
Environmental Engineer
Brownfields Program
USEPA Region 4
404) 562 -8601
24-
SOW)
STATEMENT OF WORK FOR A COMBINED PHASE II
ENVIRONMENTAL ASSESSMENT AND UNDERGROUND
STORAGE TANK REMOVAL AND CLOSURE ASSESSMENT
AT
25 U.S. Highway 98, Ft. Walton Beach, Florida
The EPA Project Officer (TOPO) for this Phase II assessment and UST Removal and
Closure Assessment is:
Margaret Olson
EPA Region 4 Brownfields
404 -562 -8601
olson.margaret@epa.gov
Objective: Conduct a more extensive Phase II Environmental Site Assessment ( ESA) at
the subj ect property in accordance with ASTM E -1903 -97 ( 2002) " Standard Practice for
Environmental Site Assessments: Phase II Environmental Site Assessment Process ". In
addition, conduct an Underground Storage Tank (UST) Removal and a Closure
Assessment according to the Florida Department of Environmental Protection, Storage
Tank System Closure Assessment Requirements in Chapter 67 -761, and Florida
Administrative Code ( F.A.C.). After the tanks have been removed and sample results are
obtained, a site -specific Analysis of Brownfields Cleanup Alternatives (ABCA)
describing clean up options and cost estimates for the clean up will be developed.
Background: The 25 U.S. Highway 98 ( the site) will require removal of four (4) 10, 000 -
gallon underground storage tanks. A Phase I ESA was conducted in August 2006. A
Phase II ESA was also conducted in August 2006 and concluded that there was soil
contamination that could not be quantified without tank removal.
Tank Removal Justification: In order to adequately assess the soil contamination and
leakage from the underground tanks, it will be necessary to remove all tanks in order to
accurately fill in data gaps and thoroughly assess this site.
Experience: The contractor should demonstrate and discuss experience with UST
removals and assessments in the State of Florida.
Start Date: Administrative tasks ( QAPP, Health and Safety Plan, file review, etc.)
should be initiated as soon as Task Order is issued. Field activities should be scheduled
with the TOPO but are expected to begin by the week of May 10, 2010 unless otherwise
negotiated with the TOPO.
25-
Tasks Section l:
1. File Review - Review the limited site information as provided by the TOPO (Phase I
and previous Phase II ESAs). A request has already been made for any additional
information held by the Florida Department of Environmental Protection ( FDEP). All
forthcoming information will be sent to the contractor as it is received.
2. Site Visit —It is anticipated that a preliminary visit ( 1)
to the site may be necessary
prior to preparation of the Quality Assurance Project Plan (and sampling plan). Contact
TOPO and determine whether pre -sampling site visit will be necessary based on all
available information about the site and site conditions. Subsequently, all field sampling
activities will be conducted during the tank removal and sampling event on the date of
which will be negotiated with the TOPO.
3. Site Access —Access will be obtained by TOPO.
Tasks Section 2:
4. Quality Assurance Project Plan ( QAPP) - Prepare draft combined site -QAPP for
TOPO review. QAPP will incorporate the tank removals /field sampling/work plan as one
project. All QA/QC procedures shall be in accordance with applicable professional
technical standards, EPA requirements, government regulations and guidelines, and
specific project goals and requirements.
5. Health and Safety Plan (HASP) - Develop a health and safety plan for field activities
at the combined site. The contractor shall implement and manage a Health and Safety
program plan in compliance with all requirements of EPA and the Occupational Safety
and Health Administration ( OSHA) 29 CFR 1910. 120 and 121 for activities at hazardous
waste sites and other health and safety requirements as appropriate.
Tasks Section 3:
6. Field Activities - Perform all necessary field activities including tank removals,
disposal of soil incidental to tank removal, and sampling in accordance with the approved
QAPP and HASP. If asbestos -containing materials (ACM) are present, an accredited
asbestos inspector will be present at site during sampling operations. Field activities will
be limited to a preliminary (scoping) visit and a tank removal /field sampling trip, unless
otherwise negotiated with the TOPO.
7. Removal of Tanks - The tanks should be removed by a Florida Certified
Pollutant Storage System contractor with a disposal certificate.
8. Contaminated Soil Disposal —Provide laboratory analysis, monitoring
equipment, and documented soil disposal in accordance with the Florida Department of
Environmental Protection, Storage Tank System Closure Assessment Requirements in
Chapter 67 -761, and Florida Administrative Code ( F.A.C.). Identify the monitoring
2
26-
equipment that will be used and provide documentation of excavation of contaminated
soil and clean fill. A maximum of 200 cubic yards of contaminated soil is allowed per
excavation site.
9. Analysis - Coordinate analytical support needed to analyze any samples taken at the
site. Laboratory analysis will be procured through the contractor. Unless directed
otherwise, all lab analysis should be procured with fourteen ( 14) day turnaround.
Contractor will also perform necessary data management and data validation. A formal
data validation package is not required however the contractor must submit an evaluation
of the laboratory data which includes checking the chain of custody records for sampling,
shipping, and analysis, reporting for accuracy and completeness, and a review of
laboratory quality control data which includes a check of data validation worksheets for
organic and iriorganic analysis, completeness assessment, sample preservation and
holding times, instrument performance check, initial and continuing calibration blank
analysis, organic surrogate spike recoveries, internal standard performance, field
duplicate precision, ICP interference and ICP dilution for metal analysis.
10. Risk Analysis —Assess risks associated with sample data by comparing analytical
data to FDEP Soil Cleanup Target Levels ( SCTLs) and Groundwater Cleanup Target
Levels ( GCTLs) and other applicable state standards, Regional Screening Levels and
Maximum Contaminant Levels ( MCLs). Please see " Regional Screening Levels for
Chemical Contaminants at Superfund Sites" website at htlp:// gpa-
prgs.oml.gov/chemicals/ index.shtml for updated information on determining screening
levels during risk assessment).
11. Waste Management - Dispose of investigation derived wastes, per applicable EPA
guidance documents ( Managing Investigation Derived Wastes for Site Inspections,
OSWER Directive 9345. 3 -02) or FDEP guidance documents. In addition, dispose of
excavated soil incidental to the tank removals.
12. Other Support - Perform other activities necessary to complete the Phase II
assessment, including providing assistance in necessary scoping meetings with the EPA,
TBA requestor and other stakeholders, including state officials when necessary.
13. Property Profile Form - Complete and submit relevant portions of the required
EPA Property Profile Form reporting the commencement and /or completion of any Phase
II activities. This form should be submitted in both hard copy and electronic copy.
14. Prepare Site Analysis of Brownfield Cleanup Alternatives (ABCA) - Complete a
draft and final report summarizing cleanup options and cost estimates for cleanup of
residual contamination of the sites. An ABCA will be applicable if residual petroleum
contamination is found from leaking tanks.
3
27_
Tasks Section 4:
15. Deliverables to TOPO —All draft