December 6, 2016

Okaloosa County BOCC — December 6, 2016 — Public Hearing Request - Water Main Improvements (Newport/Essex — agenda request

Public Hearing Request - Water Main Improvements (Newport/Essex — agenda request in the December 6, 2016 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the December 6, 2016 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1366). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used September 20, 2016; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Action Item Printout
Date
December 6, 2016
Publisher
Okaloosa County Board of County Commissioners
Where to find it
2
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Public Hearing Request - Water Main Improvements (Newport/Essex — agenda request — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 3.8 KB · 2

Download ↓

Public Hearing Request - Water Main Improvements (Newport/Essex — agenda request — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 146.0 KB · 2

Download ↓

Reading text

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Public Hearing Request - Water Main Improvements (Newport/Essex — agenda request — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: December 6, 2016 TO: Honorable Chairman and Members of the Board FROM: Jeff Littrell SUBJECT: Public Hearing Request - Water Main Improvements (Newport/Essex Area) DEPARTMENT: Water and Sewer BCC DISTRICT: 2 STATEMENT OF ISSUE: In accordance with Chapter 255, Public Property and Publicly Owned Buildings, Florida State Statues (F.S), Section 255.20, Local bids and contracts for public construction works; specification of state-produced lumber, the Board of County Commissioners (BCC) must hold a public meeting to discuss the County’s proposal to construct new water mains and install new fire hydrants to serve the Newport/Essex Area using Okaloosa County Water and Sewer Department (OCWS) staff and equipment. Specifically, the statute states that a County government may “self-perform” public works projects valued at greater than $300,000... “When the governing board of the local government, after public notice, conducts a public meeting under s. 286.011 and finds by a majority vote of the governing board that it is in the public's best interest to perform the project using its own services, employees, and equipment.” The public hearing shall constitute the public meeting as required by Section 255.20 of the Florida State Statues. BACKGROUND: The proposed Newport/Essex Area Water System Improvements Project will upgrade existing water lines from 2" and 4" to 6" in the Newport/Essex Area, which will facilitate the installation of new fire hydrants, increasing fire protection in the area. To see the affected rights-of-way, please see the attached project map. The project will include the installation of approximately 9 new fire hydrants, 6,000 L.F. of 6" water main (including 8" bores where necessary), and all associated appurtenances. Funding for this project is available in our fiscal year 2017 budget under capital improvements. OCWS is proposing to self-perform the construction of the new water mains and installation of the new fire hydrants to serve the Newport/Essex Area. OCWS plans to construct the water mains and install the fire hydrants using OCWS staff and equipment to expedite completion of the project. OCWS estimates that using their own forces and equipment to construct the project will shorten the construction schedule and will reduce the project costs over contracting with an outside construction company. OCWS has estimated the project to cost approximately $472,000.00 (see attached breakdown). As stated in the attached Public Notice, a cost breakdown of the project can be viewed by the public at the north or south BCC office anytime between now and the public hearing. The cost includes material (with fringe/insurance), labor, equipment (with maintenance), and subcontracted work. OCWS has reviewed the construction requirements for the project and has determined that they have the necessary qualifications, labor and available time to complete the project. As presented earlier, Section 255.20 F.S., Local bids and contracts for public construction works; specification of state-produced lumber includes specific requirements for County governments that choose to construct projects valued at greater than $300,000 using their own forces and equipment. OPTIONS: Approve or deny. RECOMMENDATIONS: Staff requests BCC approval to advertise and hold a public hearing at the January 17, 2017 BCC meeting at or shortly after 6:30pm, to discuss and to vote on approval for OCWS to self-perform construction of the new water mains and fire hydrants for the Newport/Essex Area Water System Improvements Project using OCWS staff and equipment. RECOMMENDED BY: APPROVED BY: John Hofstad, County Administrator

Download this text file with its original spacing ↓

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — December 6, 2016 — Public Hearing Request - Water Main Improvements (Newport/Essex — agenda request.” December 6, 2016. Action Item Printout. Crypt of Echoes evidence ID LED-2026-a63c9d28058b43bd8c5ae108f03926f9. http://127.0.0.1:58097/evidence/LED-2026-a63c9d28058b43bd8c5ae108f03926f9. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Public Hearing Request - Water Main Improvements (Newport/Essex — agenda request, meeting materials for December 6, 2016. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=30&ID=22804&MeetingID=1366

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓