READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — May 6, 2014 — Action Item Printout — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 121-Action Item Printout.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: May 6, 2014 TO: Honorable Chairman and Members of the Board FROM: Jeff Littrell SUBJECT: Eglin Main Base Wastewater - Eglin Easement DEPARTMENT: Water and Sewer BCC DISTRICT: 2&3 STATEMENT OF ISSUE: Staff requests the Board of County Commissioners execute a utility easement between Okaloosa County Water & Sewer and Eglin Air Force Base for the Eglin Main Base Wastewater Project. BACKGROUND: In September 2011, Okaloosa County went under contract (FA2823-11-C- 0030; County Contract No. C11-1906-WS) with the U.S. Air Force for the construction of the Duke Field wastewater infrastructure. The contract was modified in August 2012 to add the following: CECs for Duke Field, construction costs for Main Base wastewater infrastructure, CECs for Main Base, construction costs for Camp Rudder wastewater infrastructure, and CECs for Camp Rudder. The total contract is now $16,699,568; of that, $8,026,192 is reimbursement of design and construction costs, and $8,673,376 is for CECs. On the Eglin Main Base Project, two wastewater treatment facilities will be decommissioned, and OCWS is under contract to design and construct a new conveyance system. The new system will divert all of the wastewater received at their Main and Plew wastewater treatment plants and pump it to the OCWS Arbennie Pritchett WRF. The scope of work includes in-house construction of two large lift stations, 3.6 miles of 24'' force main, and 3.6 miles of 16'' force main, with a completion date set for August 25, 2014. Because the project is located on Eglin AFB property, a utility easement is required from Eglin Air Force for the County to own, operate, and maintain the above-mentioned infrastructure. The easement is at no cost to Okaloosa County. The easement documents are attached, along with an aerial photo depicting the location of the easement. County Contract Review has been completed on the attached Grant of Easement, and the coordination sheet is attached. OPTIONS: Approve or deny. RECOMMENDATIONS: Staff recommends BCC approval for the Chairman to execute the Air Force’s “Grant of Easement” for the Eglin Main Base Wastewater Project. RECOMMENDED BY: APPROVED BY: Ernie Padgett, County Administrator

Download this text file with its original spacing ↓