READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 08-09-05 — reading text
Part 7 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-10064-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
PROVIDING FOR
FINDINGS OF FACT; PROVIDING FOR PROPERTY TO BE
REZONED FROM R- NC
RESIDENTIAL- NEIGHBORHOOD COMMERCIAL) DISTRICT TO C-2 ( GENERAL
COMMERCIAL) DISTRICT; PROVIDING FOR A ZONING MAP AMENDMENT;
PROVIDING FOR
CONFLICTING PROVISIONS; PROVIDING FOR SEVERABILITY; AND
PROVIDING FOR AN
EFFECTIVE DATE.
The City Attorney announced a quasi-
judicial proceeding and advised Mr. Mitchell had been
previously sworn in.
Mr. Mitchell explained the request and advised the
Municipal Planning Board recommended
approval.
It was noted the applicant was not
present. The Staff Report was entered and accepted into the
record.
Dr. Pullen advised he was present at the MPB
meeting when this item was discussed.
The Mayor opened the public
hearing. As there was none, the public hearing was closed.
208 o o 6/ 30/ 05
ORD. 1639 ( CONTI
Mr. Campbell seconded motion and
Mr. Tucker moved to adopt Ord. 1639 on first reading.
Tucker, Pullen, Campbell, and
it carried unanimously with Holmes, Patterson, Campbell,
Minich in favor (Hartwell absent).
REGULAR AGENDA-GENERAL PUBLIC
Jim Dowling, 228 Santa Rosa, discussed the permitting process that must be followed by
developers.
STRIP PARKWAY SE
SITE PLAN APPROVAL. SONADO CONDOS. 54 MIRACLE
Associates, Inc. for owner Walton Sound,
Consideration of a request by applicant Emerald Coast
at 54 Miracle Strip Parkway SE,
LLC. For site plan approval of Sonado Condominium located
20) units. The project
consisting of one four-story condominium building containing twenty ( two parking
as well as surface spaces to accommodate
proposes an underground parking garage
spaces per unit.
and swore in those who wished to testify.
The City Attorney announced a quasi-judicial proceeding
Dean Burgess of Emerald Coast Associates, the applicant,
concurred with the recommendations
of Staff.
additional to report. The Staff Report was
Peggy Fowler, Planner, advised Staff had nothing
entered and accepted into the record.
Council received clarification that stonnwater run-off will be accommodated on site through the use
of an esfiltration system.
this item was discussed.
Dr. Pullen advised he attended the CRA meeting when
Mr. Tucker moved to approve the site plan for Son ado
Condominiums, 54 Miracle Strip
This recommendation is based upon the
Parkway SE, subject to the following conditions:
Coast Associates, Inc. and dated 4/25/ 05,
application and site plan developed by Emerald and conceptual landscape plan
revised 5/26/ 05 ( Job #05. 102) and architectural drawings
4/ 21/ 05, revised 5/24/ 05 ( Job # 1084).
developed by Harrison Design Associates, Inc.
1) Prior to the City granting a demolition permit the applicant
shall agree to the following:
must be monitored by an
a. Removal of the building ( including the deck area)
the site, and especially the deck area, as
archaeologist to assure as little disturbance of
the archaeologist will Investigate the suspected
possible. After the building Is removed, the site
intact shell middens in the deck area and verify whether these middens would make
Places. Shovel tests shall also be taken
eligible for the National Register of Historic
in front of the building to see if
elsewhere in the building footprint area and the paved area
If the site is eligible for listing, the
further investigation Is required in those locations.
of State that they are conducting a
archaeologist shall notify the City and the Department No additional
Phase II and/or III investigation Including any required mitigation plans.
a foundation shall be granted until this archaeological
permit,
building permits, including
investigation is completed.
2) Prior to the issuance of a Building Permit:
of State, Division of Historical
a. Acknowledgement from the Florida Department
must be received
Resources, that they have reviewed the summary archaeological report
If the State recommends any major
by the City prior to the issuance of a building permit. revised
site plan revisions based on their review of the summary archaeological report, the
c site plan must be re-submitted to the CRA Board and
b. The plans must address all items submitted by staff
the
in
City Council
memorandums
for approval.
distributed at the
May 16, 2005 DRC meeting:
Zoning and Building comments:
o o 209
6/ 30/ 05
SONADO CONDOS ( CONTI
1. Site Plan Issues:
a. The Site Data Table needs the
following revisions:
Add a Une for Site
Density Requirements that states density bonus points are
provided to allow the maximum density of 22. 5 units per acre. 0. 98@22. 5 acre= 22
units maximum.
b. The dumpster location must be fixed on the
site plan- there are no variances.
c. There is no
pedestrian walk or pattern identifying a pedestrian connection into the
site from the sidewalk
along US 98.
2. Architectural Issues:
Please review Section 20- 695( g)(3),
relating to the height of structures in the MUW- 18
zoning district. The architectural drawings need to include a cross section
showing
height of the building from mean sea level to the highest point of the
the mean sea level elevation, building. Include
garage floor elevation, first habitable floor elevation (as it
relates to the FEMA first habitable floor
requirement), elevation of the roof plate, and
elevation of the highest point of the roof. Also, the roof
pitch needs to be depicted on
the drawings.
This review was performed for the
Development Review Committee and is limited to site
plan requirements of Section 20- 683 of the land Development Code.
Subsequent to the
approved development order, a more technical review will be
performed on the plans
submitted as part of the building permit
application.
Engineering comments:
1. Water meters are to be in the
right-of-way, accessible to the water meter readers and
located in a grassed area, not in a drive or
parking space.
2. There is an
existing 1- 1/ 2" water meter serving the restaurant. Any larger or
additional water taps will be made off the line to the
south side of Highway 98 to the east of the
existing fire hydrant on the
property.
3. The City will assist in
providing flow and pressure data to evaluate adequate water
can be provided for a 22- unit, 50'
high, building at this site.
4. Size of existing sewer service must be field
verified. Size of existing service
not be adequate to serve may
development.
5. It is the developer' s
responsibility to determine if FDEP permitting is required for the
water or sewer services.
6. Stormwater management plan must meet the
City' s stormwater regulations (Article
VII of the land Development Code). Stormwater
runoff from the entire site must be
treated, including runoff from the
driveways.
7. Notice must be filed with FDEP for
