READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 02-12-13--regular — reading text

Part 7 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-31615-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

E T. m d. i. ' '' 7 m e. r "', U i Z Q U t O t 9 1/ {': r' y ;;; iii ._. W y [ y V j`, i 1 1 `. m U c 9 m3 C t, r N t W d rE Y A l a i J r i ! 1 P' r B':. t 8. 2. e Packet g, 8 8. 2. e wyaN N CN C QmvEcaNu Z QKV O N Q ee WwNa ME Na; i a m, rn c m 1 a ac N W cuE i m Q Packet G.G. 2 x y 44 xx®® dd aa! ! w>w> WN 7 a eN CN Cd aENi Ei JJ yy mNCC ZZ KU oo dm3dm mio NN WNaWNa mN NYNY UU cc aa vv mm M Nd U 69COi m C LNE , WNX C S E u a ti 8 3 City Council of Fort Walton Beach 0 To: ENGINEERING & UTILITY SERVICES MEMORANDUM Michael D. Beedie, City Manager From: Tim Bolduc, Engineering and Utilities Services Director Date: February 12, 2013 Subject: Award of ITB 13 -009 for Well # 9 Pump Repair and Installation 1. BACKGROUND: I. I. Potable Water Well # 9 is located at 623 Anchors Street NW. The well is currently offiine until the existing pump and associated configuration is repaired and reinstalled. 1. 2. On December 11, 2012, the City Council rejected all bids for ITB No. 13 -005 to repair and install the pump at Well #9 because the bids exceeded the projected budget. 1. 3. Staff revised the Invitation to Bid and submitted the revised bid specifications to the Purchasing Division to reissue the bid. The revisions included a different pump bowl material and elimination of several items located on the bid pricing sheet. 2. DISCUSSION: 2. 1. On December 18, 2012, the Purchasing Division issued Invitation to Bid ( ITB) No. 13- 009 for the Well #9 Pump Repair and Installation. On January 24, 2013, a total of five 5) bid packages were received to provide the requested services. 2. 2. The five (5) well contractors that submitted bid packages were as follows: 2. 2. 1. Griner Drilling Service, Inc. - Total Base Bid = 40,995. 75 2.2. 2. Layne Christiansen Company Total Base Bid 54,400.00 2. 2. 3. Rowe Drilling Company, Inc. Total Base Bid 55, 243. 00 2. 2. 4. Donald Smith Company, Inc. Total Base Bid S37, 110. 00 2. 2.5. Thomason Well Drilling, Inc. Total Base Bid 39, 167. 73 2. 3. After reviewing the bid proposals, Staff and the Purchasing Division determined that Donald Smith Company, Inc. of Highland, Alabama was the lowest responsive, responsible bidder. 3. FINANCIAL INFORMATION: 3. 1. The overall base bid price by Donald Smith Company, Inc. Is 537, 110. 00 and is consistent with the pricing sheet located in the bid document. 3. 2. The amount budgeted for this repair in FY 2012 -13 is $ 40,000 in the Water Operations Division of the Utilities Fund. Page 1 of 2 cKet , g. 3,S 8. 8 4. RECOMMENDATION: 4. 1. Pursuant m City of Fort Walton Beach Code of Ordinances, Volume II, Chapter 4, Section 4. 01, Paragraph 4.01. 25 and the Purchasing Policies and Procedures, Staff respectfully recommends City Council authorization to award of FEB No. 13 -009 for the Well #9 Pump Repair and Installation to the apparent low bidder, Donald Smith Company, Inc. of Highland, Alabama. ATTACHMENTS: 1TB 13 -009 Bid Tabulation ( PDF) IT 13 -009 Bid Document ( PDF) ffB 13 - 009 Exhibit A ( PDF) ITB 13 - 009 Addendum 1 ( PDF) SIGNATURE BLOCK: Tim Bolduc Completed 02/ 04/2013 8: 20 AM Finance Completed 02/ 04/ 2013 10: 14 AM Carole Jones Completed 02/ 04/2013 10: 41 AM 02/ 05/ 2013 8: 32 AM City Manager Completed City Council Pending Page 2 of 2 ob' oavi' m olo- d N' N" o p wlw Eo 6 w I' ro o o a i w m » wm wo wh' w ww cp V jvo

Download this text file with its original spacing ↓